Cisco WS-C2950-12 Hardware Installation Manual page 84

Desktop switch
Hide thumbs Also See for WS-C2950-12:
Table of Contents

Advertisement

Connecting to 10/100 and 10/100/1000 Ports
Figure 2-33 Connecting to a Port on Catalyst 2950G-48-EI Switches
Insert the other cable end in an RJ-45 connector on the target device.
Step 2
Step 3
Observe the port status LED.
The LED turns green when the switch and the target device have an established
link.
The LED turns amber while Spanning Tree Protocol (STP) discovers the network
topology and searches for loops. This process takes about 30 seconds, and then
the LED turns green.
If the LED is off, the target device might not be turned on, there might be a cable
problem, or there might be a problem with the adapter installed in the target
device. See
Reconfigure and restart the target device if necessary.
Step 4
Repeat Steps 1 through 4 to connect each port.
Step 5
Catalyst 2950 Desktop Switch Hardware Installation Guide
2-36
1
2
S Y S T
1 X
R P S
S T A T
U T IL
D U P L X
S P E E D
M O D E
2 X
Chapter 3, "Troubleshooting,"
3
4
5
6
7
8
9
for solutions to cabling problems.
Chapter 2
Installation
1 0
1 1
1 2
1 3
1 4
1 5
1 6
1 5 X
1 6 X
78-11157-03

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 2950

Table of Contents