Duerkopp Adler 467 Installation Instructions Manual
Duerkopp Adler 467 Installation Instructions Manual

Duerkopp Adler 467 Installation Instructions Manual

Hide thumbs Also See for 467:

Advertisement

Contents
Part 2: Installation Instructions Cl. 467
1.
Scope of Delivery . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.
3.
3.1
Assembling the Stand Parts . . . . . . . . . . . . . . . . . . . . . . . .
3.2
3.3
Setting the Work Height . . . . . . . . . . . . . . . . . . . . . . . . . .
4.
4.1
General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.2
4.3
Connecting the Sewing Drive . . . . . . . . . . . . . . . . . . . . . . .
4.4
Checking the Nominal Voltage . . . . . . . . . . . . . . . . . . . . . . .
5.
Mounting the Machine Head . . . . . . . . . . . . . . . . . . . . . . .
5.1
Inserting the Machine Head . . . . . . . . . . . . . . . . . . . . . . . .
5.2
Placing and Tensioning the V-belt . . . . . . . . . . . . . . . . . . . . .
5.3
Attaching the Pedal . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.4
Potential Compensation . . . . . . . . . . . . . . . . . . . . . . . . . .
5.5
Fastening the Knee Lever . . . . . . . . . . . . . . . . . . . . . . . . .
5.6
Attaching the Control Panel . . . . . . . . . . . . . . . . . . . . . . . .
6.
6.1
Attaching the Synchronizor . . . . . . . . . . . . . . . . . . . . . . . .
6.2
Connecting the Synchronizor . . . . . . . . . . . . . . . . . . . . . . .
6.3
6.4
Checking the Positioning . . . . . . . . . . . . . . . . . . . . . . . . . .
6.5
Setting the Positions . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.
Pneumatic Connection . . . . . . . . . . . . . . . . . . . . . . . . . .
7.
Lubrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.1
Filling the Oil Reservoirs . . . . . . . . . . . . . . . . . . . . . . . . . .
7.2
Oiling the Wicks and Felt Pads . . . . . . . . . . . . . . . . . . . . . .
8.
Sewing Trial . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . .
Home
. . . . . . . . . . .
Page:
3
3
5
5
5
7
7
7
9
9
11
11
11
13
15
15
15
16
16
16
17
18
18
23
24
24
26
27

Advertisement

Table of Contents
loading

Summary of Contents for Duerkopp Adler 467

  • Page 1: Table Of Contents

    Home Contents Page: Part 2: Installation Instructions Cl. 467 Scope of Delivery ......
  • Page 3: Scope Of Delivery

    1. Scope of Delivery The scope of delivery is dependent on your order. Please check if all required parts are present before installation. This description applies for a sewing machine whose individual components are all supplied by DÜRKOPP-ADLER. Standard equipment (with or without thread trimmer depending on subclass): –...
  • Page 5: Assembling The Stand

    3. Assembling the Stand 3.1 Assembling the Stand Parts – Assemble the individual parts of the stand as shown in the illustration. – Turn the adjusting screw 15 for a secure positioning of the stand. The stand must rest with all four feet on the floor! 3.2 Completing the Table Top and Mounting on the Stand –...
  • Page 7: Mounting And Connecting The Sewing Drive

    4. Mounting and Connecting the Sewing Drive 4.1 General Information Drive packages Complete drive packages are available for the 467. The sewing drives available for each subclass are to be found in the following table. Subclass Sewing drive Control panel 467-183080 FIR 1147-F.752.3 467-183081...
  • Page 8 Connection jacks EFKA VD552/4P720V: Connection jacks EFKA DC1600/DA820V:...
  • Page 9: Connecting The Sewing Drive

    4.3 Connecting the Sewing Drive ATTENTION ! All work on the electrical equipment of the special sewing machine may only be conducted by electricians or appropriately trained persons. The mains plug must be pulled! It is essential to follow the operating instructions of the manufacturer enclosed with the sewing drive! With all sewing drives (FIR and EFKA): –...
  • Page 11: Mounting The Machine Head

    5. Mounting the Machine Head 5.1 Inserting the Machine Head – Fasten the hinges 1 on the base plate 3 with countersunk screws M6X8. – Insert the machine head 2 into the cutout of the table top. 5.2 Placing and Tensioning the V-belt Remove the protection devices (if attached at delivery) –...
  • Page 12 1 - Set value initiator 4 - Sewing drive 5 - Control box 6 - Connecting cable for commutation output...
  • Page 13: Attaching The Pedal

    5.3 Attaching the Pedal – Mount pedal 7 on stand brace 8. – Align pedal 7 sideways as follows: The hung-in pedal rod 2 must be vertical. The frame brace 8 is equipped with slots for the alignment of the pedal. –...
  • Page 15: Potential Compensation

    5.4 Potential Compensation The ground lead 4 (part of the connection package) conducts static charges of the machine head 2 to ground via the sewing drive 3. – Fasten the cable bracket of the ground lead 4 on the base of the sewing drive 3 with screw (M4) and washer.
  • Page 16: Attaching, Connecting And Setting The Synchronizor

    6. Mounting, Connecting and Setting the Synchronizor 6.1 Mounting the Synchronizor – Place the synchronizor 3 on the handwheel flange. The groove in the neck 6 of the synchronizor housing must catch over the twist protection 5 on the belt guard. –...
  • Page 17: Checking The Direction Of Turn

    6.3 Checking the Direction of Turn ATTENTION ! Before commissioning the special sewing machine it is essential to check the direction of turn of the sewing drive. Turning on the special sewing machine with an incorrect direction of turn can lead to damage. The arrow in the illustration shows the correct direction of turn (counterclockwise run).
  • Page 18: Checking The Positioning

    6.4 Checking the Positioning Reference position The reference position is the starting point for all positions set at the factory. In the reference position the lowering needle point lies at the height of the top of the needle plate. Position 1 By sewing machines with thread trimmer the trimming sequence is initiated in the 1st position.
  • Page 19: Setting The Positions

    Checking the positioning – Turn the main switch on. – Briefly step forward on the pedal. The sewing machine positions in position 1. Check the position of the needle. – Step the pedal completely back and hold. The thread is trimmed. The sewing machine positions in position 2 (thread lever high position).
  • Page 20 Programming steps: 1. Accessing the correction mode Turn the main switch off. Press the "P" key and hold down. Turn the main switch on. The display shows "C-0000". Release the "P" key. 2. Changing to the technician level Enter code number "1907" via the numeric keys "1...0". Press the "E"...
  • Page 21 6. Exiting the correction mode Press the "P" key 2x. 7. Saving the setting Briefly step forward on the pedal. Step the pedal completely back. Thread trimming occurs. The pressure feet rise. The corrected setting is stored. The sewing machine is ready for operation. ATTENTION ! To complete the correction procedure it is essential to sew a little.
  • Page 23: Pneumatic Connection

    7. Pneumatic Connection For the operation of the electropneumatic seam bartacking and sewing foot lift available as optional equipment (RAP 13-4), the special sewing machine must be supplied with water-free compressed air. ATTENTION ! The flawless functioning of the electropneumatic seam bartacking and sewing foot lift (RAP 13-4) is only assured when the line pressure is 8 to 10 bar.
  • Page 24: Lubrication

    7. Lubrication Caution Risk of Injury ! Oil can cause skin rashes. Avoid longer skin contact. After contact wash yourself thoroughly. ATTENTION ! The handling and disposal of mineral oils is subject to legal constraints. Deliver used oil to an authorized reception point. Protect your environment.
  • Page 25 Hook lubrication – Remove the knee lever. – Tilt the machine head back. – Fill the tube 4 up to the "max." mark with oil. ATTENTION ! In order to assure a sufficient lubrication of the hook during the run-in period a relatively large quantity of oil was set at the factory.
  • Page 26: Oiling The Wicks And Felt Pads

    7.2 Oiling the Wicks and Felt Pads During installation and after longer idle periods the wicks and the felt 1 in the maschine head are to be soaked with a little oil. – Screw off the head cover 2. – Soak the wicks and felt 1 with a little oil.
  • Page 27: Sewing Trial

    8. Sewing Trial A sewing trial is to be conducted after completion of the installation work! – Plug in the mains plug. Caution Risk of Injury ! Turn the main switch off. Thread the underthread for winding only with the sewing machine turned off.

Table of Contents