Sequence Of Operation Flow Chart - American Water Heater BCL3 95T199 6NOX Instruction Manual

Ultra low nox series 100 commercial gas water heaters installation, operation, service, maintenance, limited warranty
Table of Contents

Advertisement

Description of this flow chart can be found in the "SeqUenCe OF OPerATIOn" section found on page 26.
Switch power on to unit
Thermostat calls for heat
VFD sends power to Blower
Blower engages Prover Switch
Blower runs at low speed
After 30 seconds, Ignition
Control provides power to
Spark Igniter and opens Gas
Valve
Ignition Control maintains spark for up
to 4 seconds and monitors Flame
Sensor to determine if Burner is lit
Does Burner
light?
YES
Ignition Control changes Blower from
low speed to high speed after 5 seconds
Ignition Control monitors
flame signal
Loss of flame signal?
NO
Thermostat is satisfied
Blower – off; Blower Prover – opens
Ignition Control – off; Gas Valve – closes

seQuenCe of operation flow Chart

NO
Gas Valve – off
YES
Gas Valve – off
figure 24.
27
NO
YES
Is this the third
ignition trial?
NO
YES
Is this the third loss
of flame signal?
Wait 15 minutes.
Blower runs at
low speed

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ultra low nox 100 seriesAbcl3 85t390 6nox

Table of Contents