Canceling A Schedule; Automatic Rebuilding - AMD M3A78-EMH HDMI User Manual

User manual
Table of Contents

Advertisement

6.
From the dropdown menus, select a start time.
Start time is based on a 24-hour clock.
7.
Click in Start At field to display a popup calendar.
8.
Click the start date in the calendar or enter a date manually.
9.
Click the Schedule button.

Canceling a Schedule

If you want to cancel the scheduled Rebuild, do the following:
1.
Click Logical Drive View in Tree View.
2.
Click the Logical Drive whose schedule you want to cancel.
3.
Click the Rebuild tab in Management View.
4.
Click the Disable option.

Automatic Rebuilding

Automatic rebuilding of a logical drive is possible under the following conditions:
The logical drive is a RAID 1 or a RAID 5 with 3 physical drives.
See "Creating a Logical Drive" on page 65.
There is a spare drive present in the RAID system.
See "Creating a Spare Drive" on page 90.
Chapter 5: Monitor and Manage
79

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Raidxpert

Table of Contents