Download Print this page

Edelbrock 65812 Installation Instructions page 2

Edelbrock corporation headers installation instructions for 1972-1991 jeep, full size cherokee, wagoneer & j-series pick-up, 1972-1981 jeep cj5, cj7, & cj8 1970-1979 amc, amx, javelin, rebel, matador with 304, 360, 390, or 401 with a.i.r.

Advertisement

DISASSEMBLY
1. Disconnect negative battery cable.
2. Raise vehicle and disconnect 02 sensor, if
equipped.
3. Unbolt stock exhaust pipes from manifolds.
4. Remove heat riser valve, clean and check for
proper operation. Replace, if necessary.
5. Remove cold air tube and heat stove hot air
tube, if equipped and remove air cleaner
assembly.
6. Disconnect A.I.R. injection hose from exhaust
manifold air logs.
7. Disconnect and move spark plug wires out of
the way.
8. Remove dipstick tube retainer bracket attached
to valve cover bolt.
9. Unbolt and remove manifolds. Remove, check
valves from air logs. They will be re-installed on
headers.
10. Clean exhaust flange gasket surfaces of cylinder
head thoroughly.
ASSEMBLY
1. Install flange gaskets and headers from top.
Install header bolts, lock washers, and thick flat
washers supplied (NOTE: Thick washers are to
be used on slotted holes of port flange.), ensure
proper alignment and tighten bolts starting with
the center working out towards ends of flange.
2. Re-install spark plug wires and dipstick tube
retainer bracket.
3. Re-install air cleaner and cold air tube and
install supplied heat stove flex tube.
supplied adapter with clamp on air cleaner
housing, if needed.
4. With wire ties, route any hoses, wires or lines
away from headers as necessary.
WARNING: The use of "Thermal Wrap" or any aftermarket coating process will void the warranty on your
headers. Those products can cause excessive heat and moisture buildup resulting in corrosion and early
failure of the system.
NOTE: High temperature spark plug wires and boots are recommended to withstand heat from Headers.
©2005 Edelbrock Corporation
Rev. 1/05
5. Inspect air log check valves, replace if
necessary. Re-install air log check valves onto
headers using anti-seize on threads. Do not
overtighten! Be careful not to bend the air
logs.
6. Re-install your factory heat riser valve using the
supplied flat gasket along with the factory
exhaust pipe and supplied 3/8 x 3 Hex bolts,
lockwashers
overtighten!
NOTE: If your vehicle has an early style heat
riser valve, without the tapered flange to seal
against the flare of the exhaust pipe, use the
donut gasket with the smallest I.D. steel ring on
the outlet of the heat riser, or you can purchase
the updated later model heat riser valve
#J3238998 from a Jeep dealer or Napa #600-
1828.
7. Install factory exhaust pipe onto left header
using supplied graphite donut gasket, 3/8 x 2
hex bolts, lockwashers, and flatwashers. Do
not overtighten!
FINAL INSPECTION
1. Check all lines (hydraulic, vacuum, air
conditioning and fuel) to ensure there is
adequate clearance to headers. Use wire ties as
needed.
2. Re-connect battery.
3. At this point, it is a good idea to look everything
over and make sure that nothing was missed in
assembly.
4. Start vehicle and bring up to normal operating
Use
temperature. Check for possible leaks.
5. Turn engine off and let cool. Tighten all bolts
again. Flange bolts should be tightened starting
with the center bolts working out.
Page 2 of 3
and flatwashers.
Do not
Catalog #65812 & 65813
DA/mc

Advertisement

loading

This manual is also suitable for:

65813