Download Print this page

Edelbrock 29575 Installation Instructions page 2

Super victor efi intake manifold for 389-455 c.i.d. pontiac v8

Advertisement

1. Fully clean all traces of old gasket material and sealant from all of sealing surfaces. Apply Edelbrock Gasgacinch to both
the head intake flange and back of gasket. Let dry and install gasket to head.
2. Do not use cork or rubber end seals. Use RTV silicone sealer instead. Apply a ¼" high bead across each block end seal
surface, overlapping the intake gasket at the four corners. This method will eliminate end seal slippage and deterioration.
3. For ease of installation and a cleaner look, we recommend using Edelbrock Manifold Bolt and Washer Kit #8559.
• Manifold Torque: Torque all bolts in the sequence shown to 25 ft-lbs.
• Prep and Tuning for Power: Optimum cylinder head port opening size should be as close as possible to the size of the
gasket being used. Port-match the manifold exits .020" per side smaller than either the gasket being used or the cylinder
head port opening, whichever is smaller.
• Courtesy Checks: After assembling the injectors, fuel rails, support brackets, throttle body, spacer (if needed), gaskets,
and air cleaner, make sure that the throttle linkage will freely rotate to the full open throttle position and back to the idle
position without rubbing or interfering with any of the neighboring components. Also, if applicable, make sure there will
be enough hood clearance after your air cleaner has been installed.
8
7
6
5
Figure 1 - Bolt Tightening Sequence
©2004 Edelbrock Corporation
Rev. 6/04 - RS/mc
INSTALLATION PROCEDURE
2
3
9
1
4
10
Edelbrock Corporation • 2700 California St. • Torrance, CA 90503
Toll Free Tech Line: 800-416-8628
Tech E-Mail: Edelbrock@Edelbrock.com
FIRING ORDER:
Pontiac 326-455: 1-8-4-3-6-5-7-2
Office: 310-781-2222
Page 2 of 2
Figure 2 - Firing Order
Catalog # 29575
Brochure # 63-0291

Advertisement

loading