Connecting The Water Line - LG LTC20380ST Owner's Manual

Top freezer refrigerator with ice maker (fits a 30" opening)
Hide thumbs Also See for LTC20380ST:
Table of Contents

Advertisement

Available languages

Available languages

• Remove the ring plug (1) from the valve located at the
top of such device.
• Place compression nut and the ferule at the end of the
pipeline. Insert pipeline into the connection valve as far
as possible. Hold tightly while holding pipeline.
Tubing
Clamp
Compression
Nut 1/4"
6,35 mm
Ferrule
(sleeve)
Hold on to the pipe from the handles or grabbers located
behind the refrigerator, loosing first the bolt holding the
handle. Afterwards, insert pipe into the hole and tighten
bolt to finalize.
10. OPEN THE BYPASS VALVE
Tighten
all
connections
containing leaks. Place access
cover back on compressor.
11. CONNECT TO REFRIGERATOR
Fix pipeline in a way that it does
not vibrate on the refrigerator or
wall. Push refrigerator against
wall.

CONNECTING THE WATER LINE

12. TURN ICE MAKER ON
Turn ice maker switch into the ON position. Ice maker
1
will start only after reaching its operating temperature
of 15 °F (-9 °C) or less. It will automatically begin the ice
production if switch is located in the ON position.
1/4" (6,35 mm)
Tubing
Refrigerator
Connection
23

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents