VMware VCM 5.3 - RECOVERY GUIDE Manual page 18

Configuration manager backup and disaster recovery guide
Table of Contents

Advertisement

VCM Backup and Disaster Recovery Guide
6. Click Change to create a schedule for the Differential Backup Plan.
7. Ensure that the schedule is enabled as a Recurring schedule type.
8. Configure the schedule at a time when minimal Collector activity will be occurring.
9. Click Next. The Select Maintenance Tasks page appears.
18
VMware, Inc.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vcm 5.3

Table of Contents