NOTE:
• When re-assembling the heat roller 25 to the FU frame upper, place the two projections at
the right hand side of the roller onto the bosses on the frame as shown in the figure below.
HR bearing 25
(boss)
• When re-assembling the heat roller 25 to the FU frame upper, ensure you do not damage
the heat roller 25 with the four pick off fingers on the FU frame upper.
Pick off fingers
Heat roller gear 34
Fig. 4-56
Heat roller 25
Pick off fingers
FU frame upper
Fig. 4-57
4-31
&+$37(5 ',6$66(0%/< $1' 5($66(0%/<
(projection)
Heat roller 25