Download Print this page

Dell PowerEdge 2400 Installation Manual page 7

Installing redundant power supplies
Hide thumbs Also See for PowerEdge 2400:

Advertisement

Thumbscrew
Power connector P2
 "   
10. Attach the 24-conductor cable labeled "PWR1" to connector P1 on the PSDB and
connector POWER1 on the system board.
11. To attach the cable harness provided in the upgrade kit, perform the following
steps:
a.
Attach the 18-pin connector labeled "PWR2" to connector P2 on the PSDB.
b.
Attach the 16-pin connector to the connector labeled "POWER" on the SCSI
backplane board.
c.
Connect the remaining connectors on the cable harness to the diskette
drive, tape drive, and other drives in the external drive bays.
12. Replace the top cover and secure it with the two screws.
13. Replace the two computer covers.
      
()"*)  ,    $  ,' 
,     $  
1.
Using your thumb and index finger, squeeze the catch in the middle of the power
supply handle (see Figure 1-3).
2.
Rotate the handle downward.
()"*#    - $   , +  ,   

3.
Slide the power supply into the chassis (see Figure 1-3).
Dell PowerEdge 2400 Systems — Installing Redundant Power Supplies
Power connector P3
Power Connector P1
1-5

Advertisement

loading