Download Print this page

BD Automobile Parts Installation Instructions Manual page 7

Dodge installation instructions bd performance transmission

Advertisement

4 February 2005
Dodge Transmission Instructions
7
24 VALVE ADJUSTMENTS
nd
rd
On trucks equipped with Cummins ISB engines, full throttle shift between 2
and 3
should occur
between 2800 – 3000 rpm (OEM) with transmission at operating temp. The kick down cable will
be located underneath the plastic cover as indicated below.
The plastic cover is held in place by 2 plastic Phillips head screws, only light pressure is required
to remove them. Do not lose the screws or washers when you remove them. Remove the cable
from the throttle linkage and support bracket.
**IMPORTANT: MARK THE CABLE at the original setting before any adjustments are made.
Remove the white colored locking clip from the cable.
Press the lock tab (this will take considerable force) to release the locking mechanism.
BD Engine Brake Inc.
Plant Address: #A10 – 33733 King Road, Abbotsford, BC, Canada V2S 7M9
US Shipping: #88 – 446 Harrison St., Sumas, WA, USA 98295 | US Mailing Address: P.O. Box 231, Sumas, WA, USA, 98295
Phone#: (604) 853-6096 | Fax: (604) 853-8749 | Web:
www.dieselperformance.com

Advertisement

loading