LG RCS10A Service Manual page 22

Service manual
Table of Contents

Advertisement

D. PCB ASSEMBLY REMOVAL
1) Remove the control panel assembly from the
cavity. (Refer to control panel assembly removal
on previous page.)
2) Remove screws which hold the PCB SUB ASSÕY to
the control panel.
3) Disconnect the flat cable from the PCB SUB
ASSÕY and take off the PCB SUB ASSÕY
Control Panel
Control Panel
Key Membrane
Button Spring
Door Open Button
E. DOOR MAIN ASSEMBLY REMOVAL
1) Open the door.
2) Remove the choke cover cap very carefully with a flat-blade
screwdriver.
CAUTION: Be careful not to damage door seal plate
by screwdriver.
3) Lift up and push the door.
NOTE:
1. After replacing the door, be sure to check that the
primary switch, monitor switch, and secondary switch
operate normally.
2. After replacing the door, check for microwave energy
leakage with a survey meter. Microwave energy must
be below the limit of 4 mW/cm
load)
3. When mounting the door assembly to the oven
assembly, be sure to adjust the door assembly parallel
to the chassis. Also adjust so the door has no play
between the inner door surface and oven frame
assembly. If the door assembly is not mounted
properly, microwaves may leak from the clearance
between the door and the oven.
PCB Sub Asm
PCB Sub Asm
Release Lever
2
. (with a 275 ml water
Remove choke cover
Remove choke cover
5-4
Remove door
Remove door
Door seal plate
Door seal plate
Spacer
Spacer
Spacer
Spacer
Spacer

Advertisement

Table of Contents
loading

Table of Contents