09.1.2 Date/time 09.1.3 RS-485 communication 09.1.4 Ethernet communication 09.2 Automatic detection of slave devices 09.3 Configuring the RGLPM system from the RGLPM D-50 display 09.3.1 Network configuration 09.3.2 Load configuration 09.3.2.1 Example of a load configuration 09.3.2.2 Changing the load settings 10.
ABB Library To download, brochures, catalogs and technical manuals: Related instruction manuals Additional instruction manuals linked to the RGLPM system can be found on the ABB website: Instruction manual Reference RGLPM - Power Metering and Monitoring System and associated current sensors...
24 V DC ± 15%. commissioning and operating the device and who have • Use 230 V AC / 24 V DC ABB power supply (P15 15W 4829 had appropriate training. He or she should have read and 0120) or use a 1 A 24 V DC safety fuse.
R G L P M D - 5 0 — 3. Preliminary operations Check the following points as soon as you receive the package containing the device: • The packaging is in good condition • The device has not been damaged during transportation •...
The firmware upgrade is done using the Product Upgrade Tool software, by connecting a laptop to the Micro USB port of your RGLPM D-50. The firmware upgrade of the RGLPM D-50 can also be done remotely directly from its embedded webserver.
(*) Our RGLPM D-50 display provides certain cyber security features to prevent these attacks and to help users in their responsibility to implement and guarantee adequate IT protection. Some recommendations are listed in the following paragraphs.
Page 9
It is possible to export data such as energy indexes, load curves and historical measurement (trends), both manually or automatically for back-up. It is also possible to save the topology (mapping of slaves connected to the RGLPM D-50 display) from the embedded webserver and configuration file from Rapid Set software.
— 6.2 Introduction to RGLPM D The RGLPM D-50 is a system display and acts as the unique point of access to measurements from RGLPM modules. This product may be connected by an RGLPM bus and/or an RS-485 bus. Centralized products can be shown as well as configured by the RGLPM D-50 display.
R G L P M D - 5 0 — Introduction 6.5 Navigation LOADS MEASUREMENTS VOLTAGES LOAD PHASE-NEUTRAL INPUTS/OUTPUTS CURRENTS PHASE-PHASE LOAD PROTECTION POWERS NET. FREQUENCY EVENTS . . . PARAMETERS ..Press for 3 sec.
A R T I C L E O R C H A P T E R T I T L E A R T I C L E O R C H A P T E R T I T L E I N T R O D U C T I O N —...
Page 14
R G L P M D - 5 0 — Introduction 6.6 Menu structure, continued Loads Language Date/time (synchronisation method, time zone, date format and separator) Display settings Rs-485 communication: mode (master/slave), baudrate, stop, parity, address Ethernet communication: DHCP, IP address, mask, gateway Change password Status Found/conflict...
— 7. Mounting — 7.1 Recommendations and safety Refer to the safety instructions (section 2. Hazards and warnings, page 5). — 7.2 Door mounting The RGLPM D-50 is panel-mounted (cut-out: 92 x 92 mm). The display is secured with clips.
Page 17
A R T I C L E O R C H A P T E R T I T L E M O U N T I N G Dimensions [in.]/mm...
(20 W max) RGLPM D-50 * The use of a 1 A/24 V DC fuse protection is recommended if the 24 V DC power supply is not provided by ABB. For North America, the use of recognized fuses is mandatory.
(20 W max) RGLPM D-50 * The use of a 1 A/24 V DC fuse protection is recommended if the 24 V DC power supply is not provided by ABB. For North America, the use of recognized fuses is mandatory.
R G L P M D - 5 0 — 9. Configuration • Display settings: to access settings that are specific to From the ABB start-up screen, press “OK” to enter the navigation the display. menu: • Autodetect serial devices: to launch an automatic detection and addressing of meters and power monitoring devices connected to the RGLPM D-50 display.
9.1.2 Date/time Configure the baudrate, stop bits, parity of the RS-485 bus. You can configure the date and time on the RGLPM D-50 display: • Manually by entering the year, month, day, hour, minute, second • Automatically (like a computer) by SNTP server...
You can configure the Ethernet settings of the Example of auto-discovery on an RGLPM D-50 display. RGLPM D-50 display: Four slave devices are connected to the RGLPM D-50. • DHCP (IP address dynamically assigned by the Ethernet Two are addressed correctly; the other two have network) ENABLED/DISABLED the same Modbus address.
Page 23
RGLPM bus and RS-485 bus, and RGLPM B AUTODETECT and RGLPM A-40 on the RS-485 bus. • FULL: this mode will also detect other ABB PMDs STATUS ADDR SCANNING (RGLPM A) and meters (COUNTIS E) connected on the...
Page 24
R G L P M D - 5 0 — Configuration 9.2 Automatic detection of slave devices, continued If you have chosen an automatic address conflict resolution To manually resolve address conflicts, locate the devices (“AUTOSET”), the STATUS automatically goes to "STOPPED” which have a lit and stable “COM”...
Page 25
You can find the IDs on the marking on the products of conflicts decreases to reach zero once all products have a (546434 on the U-30 and F0C1D2 on one of the I-30s) unique address. as shown in the picture below: RGLPM D-50 @2 RGLPM bus U-30 I-30 I-30...
R G L P M D - 5 0 — Configuration 9.3 Configuring the RGLPM system from the RGLPM D-50 display There are two steps to configure the RGLPM system: Loads are configured from RGLPM I-xx modules: • Network: setting the type of voltage network: single-phase PROD.
A R T I C L E O R C H A P T E R T I T L E C O N F I G U R AT I O N — Configuration 9.3.1 Network configuration — You can configure the various network voltage parameters: •...
R G L P M D - 5 0 — Configuration 9.3.2.1 Example of a load configuration, continued — The current sensor connected to the current 1 input measures the current of phase 3 (V3). 9.3.2.2 Changing the load settings The current sensor connected to the current 2 input measures Following the example above, press “OK”...
Page 29
A R T I C L E O R C H A P T E R T I T L E C O N F I G U R AT I O N — Configuration 9.3.2.2 Changing the load settings, continued Go to “CT SETTINGS”...
The configuration of the RGLPM D-50 display and downstream • Click on “Auto-discovery” (1): ABB devices can be done from the Rapid Set system software, by connecting a computer to the RGLPM D-50 display either via USB or via Ethernet. —...
• Click on “New configuration”, enter a name and icon. • Click on the newly created configuration. • Click on the “+” icon to manually add the RGLPM D-50 display to the topology, by selecting the product and entering the IP and Modbus®...
- Alarm is also triggered if a user has been locked out after too many unsuccessful login attempts When one or more system alarms are active, the ALARM LED on the front face of the RGLPM D-50 display starts blinking.
12. Use Once the devices are configured, you can visualize the If the “ALARM” LED of the RGLPM D-50 display is lit, stable measurements of each load from the “MEASURES” menu. or flashing, it means there is at least one active alarm.
IP65* (IEC 60529) Weight 210 g * Front face only. The use of a silicone seal may be required to ensure sufficient sealing of the junction between the RGLPM D-50 display and panel door. — 13.2 Communication characteristics Type of screen...
Once enabled from the Rapid Set configuration software, (I2 Inst in this case) the RGLPM D-50 display supports SNMPv1, v2 and v3. The RGLPM • GetBulk: to retrieve multiple variables gathered together D-50 is an agent SNMPv1, v2, v3 which responds to queries from •...
Page 37
Used by the manager to receive notifications from the agent community passwords. They are non-encrypted and are passed over the network in plaintext. • Both passwords have to be entered in the agent (RGLPM D-50) and the manager and must be identical. RGLPM D-50 •...
Page 38
SNMP communication with the RGLPM D-50 — Annex I – 5. Retrieving data using the RGLPM D-50 MIB file The RGLPM D-50 is compliant with MIB-II defined by the MIB standard RFC 1213 which defines the following structure: Root iso (1)
Page 39
OID sequence Description enterprise category identified by OID 1.3.6.1.4.1.4555. This 4555 ABB enterprise branch implies that all queries from a manager to ABB agents will start ABBProducts table by the base path 1.3.6.1.4.1.4555. ProductMetrology table InstantaneousTable Because the RGLPM is a multi-circuit system, the RGLPM...
Page 40
R G L P M D - 5 0 — Annex I SNMP communication with the RGLPM D-50 Example: Let us consider the following architecture: OID sequence Description Product I-30 I-30 4555 “ABB” enterprise branch Modbus® address “ABBProducts” table Load type...
Page 41
“private”. It allows a manager to write (ex: position of a • Trap host 1 port: Enter the port used to send traps for the digital output) to a device connected to the RGLPM D-50. first host station. • Trap community: The trap community string allows the •...
BACnet communication with the RGLPM D-50 ® The RGLPM D-50 supports the BACnet IP protocol. It acts as BACnet uses a client/server communication mode between a BACnet IP gateway to all devices compatible and connected devices. Devices communicate between each other using downstream via RS-485 or the RGLPM bus.
Page 43
— Annex II BACnet communication with the RGLPM D-50 ® — Example for the device object of the RGLPM D-50: Annex II – 2. BACnet objects Property BACnet Object_Identifier (OID) Required BACnet defines a standard set of “objects”, each of which has a...
Page 44
Optional OID = Main OID (= default 100) + Modbus® address: Instantaneous_Timestamp Proprietary • Device with Main OID (100) is the RGLPM D-50 display itself. Average_Timestamp Proprietary • The device with OID (1xx) is the device with the Modbus Max_Average_Value Proprietary address xx.
Page 45
A R T I C L E O R C H A P T E R T I T L E A N N E X I I — Annex II BACnet communication with the RGLPM D-50 ® The table with indexes of the analog input measurement list is given below: System Ph-N Voltage Unsigned •...
Page 46
R G L P M D - 5 0 — Annex II BACnet communication with the RGLPM D-50 ® sPF1 Power Factor Type Unsigned • • • • • PowerFactorTypeSPF1 PF2 Power Factor Signed • • • • • PowerFactorPF2...
Page 47
Statement) is available at www.ABB.com. Service list Description After logging in to Rapid Set system on the RGLPM D-50, Used by a BACnet device (the client) to ask another BACnet device (the you can find the BACnet IP settings in the BACnet menu...
R G L P M D - 5 0 — Annex III Find and add a server’s CA (certificate authority) to an RGLPM D-50 Requirements 1. An unfiltered internet connection 2. OpenSSL software installed Instructions • Use the following command: openssl s_client -connect <server>:<port>...
Page 49
— Annex III Find and add a server’s CA (certificate authority) to an RGLPM D-50 • Download the PEM (or Base64) certificate If the certificate is given as text, copy the text in between BEGIN CERTIFICATE and END CERTIFICATE into a text file and save it...
Need help?
Do you have a question about the RGLPM D-50 and is the answer not in the manual?
Questions and answers