Download Print this page

Rack Solutions 2POST-2UKIT Installation Instructions

2post conversion brackets

Advertisement

Quick Links

RackSolutions
.com
Patent(s) Pending
2U
3U
4U
5U
7U
2Post Conversion Brackets
Installation Instructions
KitP/N: 2POST-2UKIT,
2POST-3UKIT, 2POST-4UKIT,
2POST-5UKIT, 2POST-7UKIT
@
Technical Support & Sales 903.453.0801
info
RackSolutions.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the 2POST-2UKIT and is the answer not in the manual?

Questions and answers

Summary of Contents for Rack Solutions 2POST-2UKIT

  • Page 1 RackSolutions .com Patent(s) Pending 2Post Conversion Brackets Installation Instructions KitP/N: 2POST-2UKIT, 2POST-3UKIT, 2POST-4UKIT, 2POST-5UKIT, 2POST-7UKIT Technical Support & Sales 903.453.0801 info RackSolutions.com...
  • Page 2 Kit Contents Equipment Install Hardware Kit Four (4) Conversion Brackets (10) M6x0.1mm Pan Head Screws (12) M6x0.1mm Cage Nut Bracket to Rack Hardware Kit (16) 12-24 Slotted Hex Bolts Installation Instructions Step 1. Attach Brackets: Determine the location of the equipment in the rack. Screw the (4) brackets to the rack using 12-24 Slotted Hex Bolts.
  • Page 3 Installation Instructions – Rack Front If there are multiple servers stacked vertically, follow step 2 below. Step 2. Bracket Coupling: Install 12-24 Slotted Hex Bolts at the locations shown below to “Couple” the brackets. Bolts may be installed from the top or bottom. Repeat for each nearby bracket.
  • Page 4 Brackets convert P/N: 3UKIT-009 2Post racks into 4Post racks. Available in 2U, 3U, 4U, 5U, 7U. P/N: Heavy Duty Fixed Shelf for 2POST-2UKIT any equipment up to 500 lbs. P/N: 2POST-3UKIT and 17.7” wide. Requires P/N: 2POST-4UKIT 2Post Conversion Brackets.

This manual is also suitable for:

2post-3ukit2post-4ukit2post-5ukit2post-7ukit