Page 2
Kit Contents Kit Contents Rack Hardware Kit (2 bags): (12) 10-32 Pan Head Screws (2) Inner Rail/Shim Assemblies (12) 12-24 Pan Head Screws (2) Outer Rail/Rack Bracket Assemblies (12) 12-24 Cage Nuts (12) 12-24 Square Nuts Rail Hardware: (5) 8-32 Keps Nuts (5) 8-32 x .375 Truss Head Screws Installation Instructions Step 1.
Page 3
Installation Instructions Step 3. Mount Outer Rail Assemblies: Mount both rails in the Rack as shown below. Rail Screws Rear of Rack Front of Rack Rail Screws Kit Contents for Cable Management Arm Cable Arm Hardware: (1) Cable Management Arm Assembly (3) 8-32 Keps Nuts (1) CMA Bracket Long (1) 8-32 x .250 Pan Head Screws...
Page 4
Cable Management Installation Instructions Step 2. Mount Box: Using two people carefully slide the box into the rails in the rack. Step 3. Attach CMA: hardware. 8-32 x .250 8-32 x .188 (Must be this screw or it will interfere with the rail) Warranty Statement Innovation First, Inc.
Need help?
Do you have a question about the 2URAIL-R7 and is the answer not in the manual?
Questions and answers