Advertisement

Quick Links

MAESTRO
BIOCLIMATICS
Installation manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BIOCLIMATICS and is the answer not in the manual?

Questions and answers

Summarization of Contents

Symbols and Safety Guidelines
Symbol Descriptions
Explains various symbols used for attention, hazards, and contact information.
General Safety Warnings
Covers intended use, hazards of moving parts, and maintenance safety.
General Precautions
Emphasizes understanding the manual and following accident-prevention regulations.
Warnings and Cautions
Details installer skills, preventive checks, and handling heavy parts.
Controls and Versions
Wall-Mounted Control Operation
Instructions for using the customer-operated wall-mounted control unit.
Remote Control Operation
Details on using the remote control for opening, closing, and stopping blades.
Remote Control Battery Replacement
Step-by-step guide for replacing batteries in the remote control.
Material Check, Unpacking, and Preparation
Preliminary Inspections
Guide to checking package contents and manufacturer data before opening.
Handling and Storage
Advice on handling packaged components and storage for prevention of damage.
Wall Installation
Tracing and Marking
Instructions for marking fixing lines and intermediate measures on the wall.
Plate Fixing
Guidance on plate-to-wall fixing for single and side-by-side modules.
Linearity Check
Using a water level to ensure the linearity of drawn traces on the wall.
Marking Fixing Holes
Positioning brackets and marking the corresponding fixing holes on the wall.
Drilling Fixing Holes
Drilling the wall for bracket fixing using a suitable bit.
Dowel and Screw Insertion
Inserting dowels and tightening screws, checking bracket planarity.
Central Pillar Wall Fixing
Fixing wall brackets for central pillars and side-by-side modules.
Central Pillar Assembly
Assembling the central pillar to the wall plate using screws.
Pillar Installation
Importance of Pillar Positioning
Emphasizes precise pillar positioning for flat structure and rainwater flow.
Foot Removal and Ground Preparation
Loosening screws to remove feet and preparing for ground fixing.
Ground Fixing and Alignment
Fixing pillars to the ground, ensuring parallelism and diagonals.
Floor Drain Preparation
Modifying stickers and applying silicone for floor water drainage.
Self-Supporting Span Side Installation
Pillar fixing for self-supporting structures with modules on the span side.
Ground Fixing for Span Side
Fixing pillars to ground, ensuring parallelism and diagonals for span side.
Self-Supporting Pivot Side Installation
Pillar fixing for self-supporting structures with modules on the pivot side.
Ground Fixing for Pivot Side
Fixing pillars to ground, specifying foot side orientation for pivot side.
Pillar and Foot Assembly
Inserting pillars into feet and securing them with screws.
Pillar Fixing Notes and Wall Mounting
Notes on pillar reinforcements, drain holes, and wall-mounting alternatives.
Repeating Pillar Assembly Steps
Repeating the pillar assembly steps for different configurations.
Crossbeam Installation
Wall-Mounted Beam Assembly
Fixing plates to the wall-mounted beam assembly.
Profile Installation for Side Closure
Installing a profile and cutting it if side closures are foreseen.
Laying Beam on Brackets
Placing the beam onto the wall-fixed brackets.
Anti-lifting Bracket Assembly
Fixing anti-lifting plates to the side brackets.
Anti-lifting Bracket Fixing
Securing the anti-lifting plate to the wall-mounted bracket.
Side Beam Assembly
Inserting side beams into rear brackets and securing with screws.
Side Beam Tightening
Tightening screws for side beams to beams and pillars.
Pivot Side Beam Configurations
Different configurations for motor supporting and idle side beams on the pivot side.
Span Side Beam Configurations
Configurations for rear and front beams on the span side.
Main Diagram Overview
Illustrates the overall layout of beams and pillars for installation.
Main Diagram Span Side
Diagram showing beam assembly for self-supporting structures on the span side.
Silicone Application (Pivot Side)
Applying silicone on pivot side beam ends near pillar coupling.
Main Diagram Pivot Side
Diagram showing beam assembly for self-supporting structures on the pivot side.
Silicone Application on Pivot Side
Applying silicone on pivot side beam ends near pillar coupling.
First Crossbeam Insertion
Inserting the first crossbeam into pillars without tightening screws.
Cable Passage and Beam Orientation
Attention to electric cable passage and correct beam orientation.
Motor Power Cable Routing
Routing the motor power cable through the pillar.
Light Power Cable Routing
Routing light power cables inside blades.
Beam-to-Pillar Fixing
Inserting and partially tightening screws to fix beams to pillars.
Gutter Profile Installation
Fitting Perimeter Gutters
Instructions for fitting perimeter gutters carefully and securing them.
Seal Installation
Finalizing perimeter seal installation, ensuring correct orientation for waterproofing.
Plastic Element Insertion
Inserting plastic elements into gutter junctions and modifying for drainage.
Silicone Application for Gutter
Applying silicone under plastic components and inside gutters to prevent leaks.
Silicone Application Areas
Applying Silicone to Specific Areas
Illustrates specific areas requiring silicone application for sealing.
Motor Assembly
Component Identification
Lists parts needed for motor assembly: guiding profile, accessories, winding handle.
Motor Guiding Profile and Locking Plate Securing
Securing the motor guiding profile and locking plate with screws.
Sliding Block and Stem Assembly
Assembling the sliding block, motor stem, and pin.
Winding Handle and Connector Securing
Inserting winding handle and securing the motor connector.
Motor Power Supply
Joining Motor Cable
Joining the motor cable with the rubber cord and routing it.
Control Unit Wiring and Box Installation
Wiring to the control unit and installing the power supply box and unit.
Motor Limit Switch Adjustment and Cover Assembly
Motor Programming and Limit Switches
Instructions for motor programming and adjusting limit switches.
Motor Cover Installation
Temporarily removing the winding handle and screwing on the casing.
Compensation Blade Assembly
Securing Profiles to Beams
Fixing SPAN-side profiles to beams using screws.
Securing Compensation Blades
Fastening compensation blades to supports and drilling for screws.
Control Blade Assembly
Control Blade Installation (Sun Protection)
Installing the control blade in the fifth hole from the right for Sun Protection config.
Control Blade Installation (Sun Inside)
Installing the control blade in the fifth hole from the left for Sun Inside config.
Blade with Light Assembly
Connecting Light Blade Cable
Connecting the light blade cable to the IP 67 connector, ensuring correct polarity.
Inserting Connector into Beam
Inserting the connector into the beam through the bush.
Blade Assembly with Swivel Bracket Support
Identifying Blades for Support Plates
Using tables to identify which blades require swivel bracket support plates.
Fixing Swivel Bracket Plates
Fixing support plates to blade pins and ensuring they can oscillate.
Blade Assembly
Fitting Control Blade
Installing the control blade based on configuration and structure edge.
Sliding Blade into Frame
Sliding the blade's pin into the bearing-side frame and securing it.
Guiding Profile and Fastener Fixing
Fixing the guiding profile to external blades and securing the fastener.
Winding Handle Assembly
Assembling the winding handle to the control blade.
Repeating Blade Operations
Repeating the blade assembly operations for all remaining blades.
Cover and Accessory Profile Assembly
Closing Gaps with Profile
Closing gaps with a profile when SCREEN is not installed.
Fixing Profile
Securing the profile with self-drilling screws.
Brush Preparation and Application
Cutting, cleaning, and applying adhesive tape to the brush for fixing.
Swivel Bracket Profile Installation
Blade Closure and Bracket Hooking
Closing blades and hooking the swivel bracket profile to the support.
Profile Positioning
Moving the swivel bracket profile to a specific distance from the span side beam.
Supplementary Pillar Installation
Ground and Pole Plate Fixing
Fixing plates to the ground and pole, then attaching the upper plate.
Upper Plate and SCREEN Support Fixing
Securing the upper plate and SCREEN support plate.
Screen Installation
Installing Closure Connections
Installing motor and idle pin supports on pillars for closure installation.
Fitting Brackets
Fitting brackets securely on both sides using self-drilling screws.
Roller Tube and Canvas Insertion
Inserting the roller tube with canvas and fixing it to the support.
Lateral Runner Installation
Fixing lateral runners on pillars and noting their specific installation orientation.
Wiring Distribution
Distributing wirings on the perimeter using channels and holes.
Sliding Glass Doors Installation
Installation for 2-Way Doors
Fixing self-drilling screws for 2-way, 2-door and 2-way, 4-door configurations.
Installation for 3-Way Doors
Fixing self-drilling screws for 3-way, 3-door configurations.
Casing Installation
Safety Block Fixing
Fixing additional safety blocks to the beam cover.
Brush Hooking on Pivot Sides
Hooking the brush to plastic supports inside the gutter on pivot sides.
Fitting Casings and Lateral Stops
Inserting casings into coupling seats and blocking them with lateral stops.
Brush Profile Insertion for SCREENS
Inserting the brush profile into the external casing before fitting, if SCREENS are installed.
Angle Plate Fixing
Fitting angle plates to drain areas.
Punched Sticker Application
Applying punched stickers to covers, with specific notes for coupled modules.
Engaging Casings on Pillars
Engaging casings into pillar seats and trimming excess sticker.
Plug Installation
Positioning and tightening plugs in the upper side of the pillars.
Wall-Mounted Option
Angle Bar and Upper Profile Fixing
Fixing angle bars to the crossbeam and the upper profile to the structure.
Wall Plate Fixing
Fixing wall plates to the structure and then to the wall.
Silicone Application Along Profile
Applying silicone along the entire profile close to the wall.
Wall-Mounted Option Without Pillars
Angle Plate and Crossbeam Fixing
Fixing angle plates to the crossbeam and then to the wall.
Upper Profile and Silicone Application
Fixing the upper profile and applying silicone along the wall profile.
Silicone Application on External Areas
Applying Silicone Along Length
Applying silicone to indicated external areas and spreading it along the whole length.
Electric System Overview
System Components
Diagram showing power supply, motors, control units, and kits.
Wiring Connections
Illustrates connections for screen motors, blade lights, and control units.
Technical Tables
Wind Resistance
Table showing wind resistance classes for cover and side closures.
Traction Effort on Dowels
Tables for traction effort on foot and wall dowels based on dimensions.
Shear Effort on Wall Dowels
Table showing shear effort on wall dowels based on dimensions.
Wind Resistance Load Determination Example
Load Calculation Based on Dimensions
Example of determining maximum load on dowels using structural dimensions and wind speed.
Anchoring System Standards
Reference guidelines and standards for anchoring systems in concrete and masonry.
Seismic Performance Categories
Seismic performance categories for dowels based on acceleration.

Table of Contents