Advertisement

Quick Links

Air Conditioner
Installation manual
AM****XM**R
• Thank you for purchasing this Samsung Product.
• Before operating this unit, please read this installation manual carefully and retain it for future
reference.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AM050 XMDER Series and is the answer not in the manual?

Questions and answers

Summarization of Contents

Safety Precautions
General Information and Warnings
General guidelines and warnings for safe installation and operation of the air conditioner.
Installing the Unit
Instructions and important considerations for installing the indoor and outdoor units.
Power Supply Line, Fuse, or Circuit Breaker
Guidelines for ensuring correct and safe electrical connections, including power supply and protection devices.
Preparing for Installation
Outdoor Unit Classification
Details on different outdoor unit models and their specifications.
Installation Combination
Guidance on combining indoor and outdoor units based on capacity and connection limits.
Accessories
List of included accessories required for installation.
Moving the Outdoor Unit
Safe methods and precautions for moving the outdoor unit.
Selecting Installation Location
Criteria for choosing an optimal and safe location for the outdoor unit.
Installation Guide at the Seashore
Specific installation guidelines for coastal environments to prevent corrosion.
Space Requirement for Installation
Clearance for 1 Outdoor Unit
Minimum clearance requirements for installing a single outdoor unit for proper ventilation.
Clearance for Multiple Outdoor Units
Clearance requirements for installing multiple outdoor units side-by-side.
Installation and Base Ground Work for an Outdoor Unit
Base Ground Work
Procedures and requirements for creating a stable and secure base for the outdoor unit.
Refrigerant Pipe Installation
Refrigerant Pipe Work
Guidelines for installing refrigerant pipes, including length, height, and material selection.
Refrigerant Pipe Temper Grade and Thickness
Specifications for refrigerant pipe materials, including temper grade and minimum thickness.
Pipe and Branch Joint Selection for Heat Pump
Guidance on selecting pipe sizes and branch joints for heat pump systems.
Pipe Sizing for Branch Joints
Tables specifying pipe sizes for various connection points in the system.
Pipe and Branch Joint Selection for Heat Recovery
Pipe sizing and branch joint selection for heat recovery systems.
Keeping Refrigerant Pipe
Methods for storing and sealing refrigerant pipes to prevent contamination.
Refrigerant Pipe Welding and Safety
Safety precautions and essential information for refrigerant pipe welding procedures.
Nitrogen Flushing Welding
Procedure for flushing refrigerant pipes with nitrogen gas during welding.
Cutting or Flaring Pipes
Step-by-step guide for cutting and flaring refrigerant pipes correctly.
Connecting Flared Pipes
Instructions for securely connecting flared refrigerant pipes, including torque specifications.
Outdoor Unit Pipe Installation
Guidelines for routing refrigerant pipes from the outdoor unit.
Installing Branch Joints
Procedures for correctly installing branch joints horizontally or vertically.
Installing the Distribution Header
Instructions for installing the distribution header, including port blocking.
Installing HR Changer (E) and MCU (F)
Specifications and installation details for HR Changer and MCU components.
Installing Indoor Units Using Y-Connector
Guidelines for connecting indoor units using a Y-connector and DIP switch settings.
How to Connect Pipes
General guidance on connecting pipes, including welding precautions.
Heat Pump Pipe Installation Examples
Visual examples of correct refrigerant pipe layouts for heat pump systems.
Heat Recovery Pipe Installation Examples
Visual examples of correct refrigerant pipe layouts for heat recovery systems.
Incorrect Heat Recovery Pipe Installation Examples
Visual examples of incorrect refrigerant pipe layouts and common errors for heat recovery.
Allowable Refrigerant Pipe Length for Heat Pump
Pipe length and height limits for Y-joint connections in heat pump systems.
Allowable Refrigerant Pipe Length for Various Joints
Pipe length and height limits for header and Y-joint/header connections.
Allowable Refrigerant Pipe Length for Heat Recovery
Pipe length and height limits for MCU-only and MCU/Y-joint configurations.
Performing Air Tightening Test
Detailed steps for conducting an airtight test using nitrogen gas to ensure system integrity.
Vacuuming Pipes and Indoor Units
Procedure for vacuum drying the refrigerant pipes and indoor units to remove moisture.
Selecting Additional Refrigerant Charging
Method for calculating and selecting the correct amount of additional refrigerant charge.
Connecting the Drain Hose to the Outdoor Unit
Instructions for connecting the drain hose to the outdoor unit for defrost water drainage.
Insulating Refrigerant Pipes or Y-Joints
Requirements for insulating refrigerant pipes and Y-joints to prevent condensation.
Selecting Refrigerant Pipe Insulation
Guidelines for selecting appropriate insulation thickness based on pipe size and humidity.
Insulating Refrigerant Pipes
Procedures for insulating refrigerant pipes, Y-joints, and connection areas.
Pipe Insulation Guidelines
General pipe insulation guidelines, including contact and spacing.
Pipe Insulation After EEV Kit Installation
Specific insulation guidelines for pipes after installing the EEV kit.
Insulating the Header Joint
Procedures for insulating header joints to prevent dew formation.
Insulating Y-Joints and Connecting Pipes
Methods for insulating Y-joints and connecting pipes.
Wiring Work
General Wiring Work Procedures
General regulations and procedures for performing electrical wiring installation.
Power Cable Connection (1 Phase 2 Wires)
Wiring diagram for connecting the power cable (1 phase, 2 wires).
Power Cable Connection (1 Phase 2 Wires with EEV Kit)
Wiring diagram for 1-phase, 2-wire power connection with an EEV kit.
Power Cable Connection (3 Phase 4 Wires)
Wiring diagram for connecting the power cable (3 phase, 4 wires).
Power Cable Connection (3 Phase 4 Wires with EEV Kit)
Wiring diagram for 3-phase, 4-wire power connection with an EEV kit.
Circuit Breaker and Power Supply Cord Specifications
Electrical specifications for circuit breakers and power supply cords.
Tightening Power Terminals
Correct procedures and torque values for tightening power terminals.
Connecting HR Changer/MCU Units
Example wiring diagram for connecting HR Changer/MCU units.
Selecting Compressed Ring Terminals
Guidelines for selecting appropriate compressed ring terminals based on cable dimensions.
Grounding Work
Installing Grounding Wire
Instructions for safely installing grounding wires.
Grounding the Power Cable
Procedures for grounding the power cable based on installation location.
Performing Grounding Work
Methods for performing grounding work using terminals or switchboards.
Charging Refrigerant
Refrigerant Regulations and Information
Regulatory information and precautions regarding the use of fluorinated greenhouse gases.
Basic Segment Display
Setting Outdoor Unit Installation Options
Explanation of basic segment display patterns during operation and setting.
Setting Outdoor Install Options
Step-by-step guide for setting various outdoor unit installation options.
Setting the Option
Detailed instructions on how to enter and configure option settings using tact switches.
Key Operation and View Mode with Tact Switch
Guide to operating controls and checking system status via tact switches.
Setting HR Changer/MCU and Pipe Addresses
Setting HR Changer/MCU Address and Ports
Procedures for setting HR Changer/MCU addresses and port configurations.
Setting Pipe Addresses Manually
Manual method for setting pipe addresses for indoor units via remote control.
Setting Pipe Addresses Using S-NET Pro 2
Instructions for setting pipe addresses using the S-NET Pro 2 software.
Automatic Pipe Address Setting (Auto Pipe Pairing)
Automatic procedure for setting pipe addresses for connected indoor units.
Inspection and Check Operation
Precautions Before Check Operation
Essential safety precautions to take before performing operational checks.
Inspection Before Check Operation
Pre-operation checks including power, cables, and voltage verification.
Guaranteed Range for Check Operation
Recommended temperature conditions for accurate operational checks.
Check Operation Procedure
Steps for running the system check operation and interpreting results.
Checking Lists After Finishing Installation
Installation Checklist
Checklist for final installation checks of outdoor and indoor units.
Refrigerant Pipe Work Checklist
Checklist for verifying refrigerant pipe installation, including connections and insulation.
Drain Pipe Installation Checklist
Checklist for ensuring correct installation and insulation of drain pipes.
Wiring Work Checklist
Checklist for verifying the correctness of wiring work and connections.
Address Setting Checklist
Checklist for confirming proper address settings for units and controllers.
Option Setting Checklist
Checklist for verifying option settings, including vibration resistance.
Trial Operation
Writing and Keeping Installation Checking Card
Guidance on filling out and storing the installation checking card.
Product Information
Outdoor Unit Specifications
Physical specifications including net weight and dimensions for outdoor units.

Table of Contents