Quick Installation Guide are fully understood. Failure to follow all the specified instructions and procedures, will invalidate the warranty and as such Solplanet will not be liable for any claims for compensation. WARNING All work on the equipment must only be carried out by qualified personnel who have ...
Page 3
The installation requires at least an area of 250mm x 150mm x 1500mm. A minimum clearance of 200mm from other equipment or objects must be maintained. QG0057_EV Charger Pedestal_540-300483-00_V01_1123...
III. Scope of delivery IV. Pedestal Installation Step 1: Take the pedestal and accessories out of package. QG0057_EV Charger Pedestal_EN_540-300483-00_V01_1123...
Page 5
Step 2: • Place the pedestal on the mounting location and mark four drilling positions. • Drill four holes(A) in the floor and insert four expansion bolts(B) into the holes. Note:The recommended depth of hole is 65mm and the recommended diameter of hole is 10mm.
Page 6
Option 2: Place the incoming AC supply cable(C) above the ground. Step 4: Choosing the ways how incoming AC supply cable be installed to the EV charger. Option 1: Insert the incoming AC supply cable through lower hole(E) on the pedestal. QG0057_EV Charger Pedestal_EN_540-300483-00_V01_1123...
Page 7
Option 2: Place the incoming AC supply cable through upper hole(D) on the pedestal. QG0057_EV Charger Pedestal_540-300483-00_V01_1123...
Page 8
Step 5: Demount four screws(F) from the pedestal. Then take down cover(G) and sealing rubber(H) out of the pedestal. Step 6: • Make an incision with a knife(K) on the grommet(J) according to the power supply cable diameter. Thread the cable(C) through the grommet(J). •...
Page 9
Step 7: • Push the incoming AC supply cable through the inner space of the pedestal and make it out at the position of D or E. Then tighten four nuts(I) on four expansion screws with 8.5Nm recommended torque. • QG0057_EV Charger Pedestal_540-300483-00_V01_1123...
Page 10
Step 8: Cable holder fastening (Cable version optional): • Take the cable holder(N) and two M5X10 screws(M) from the delivery. Install but not tight the two screws into the pull rivet column with 2~3mm gap. Hang the cable holder(N) on these two screws. •...
Page 11
Step 10: • Install but not tight the two M5X10(M) screws into the pull rivet column with 2-3mm gap. Hang the EV charger without decorative cover and top cover on the screw(M). • • Thread the M5X20 screw(T) through the sealing rubber(U) located at the sealing rubber accessory in EV charger’s package.
Page 12
Step 13: • Take the top cover and then install eight screws(R) located on the top cover. • Take the decorative cover and then install one screw(Q). Finish the installation. • QG0057_EV Charger Pedestal_EN_540-300483-00_V01_1123...
Page 13
- Error code - Mounting location - Proof of purchase Service Contact: Website: https://solplanet.net/contact-us/ You can submit your claims online by visiting our website: https://solplanet.net/claims/ You will receive a response within 24 hours. AISWEI New Energy Technology (Yangzhong) Co, Ltd.
Need help?
Do you have a question about the SOL22H and is the answer not in the manual?
Questions and answers