Desa GMP16 Safety Information And Installation Manual page 12

Desa safety information and installation manual unvented (vent-free) propane/lp gas heaters gmp16, gmp16t, gmp26, gmp26t blue flame: gmp20bt, gmp30bt
Table of Contents

Advertisement

INSTALLATION
Continued
CONNECTING TO GAS SUPPLY
WARNING: This appliance
requires a 3/8" NPT (National
Pipe Thread) inlet connection to
the pressure regulator.
WARNING: A qualified ser-
vice person must connect heater
to gas supply. Follow all local
codes.
CAUTION: Never connect
heater directly to the propane/
LP supply. This heater requires
an external regulator (not sup-
plied). Install the external regu-
lator between the heater and pro-
pane/LP supply.
The installer must supply an external regulator.
The external regulator will reduce incoming gas
pressure. You must reduce incoming gas pressure
to between 11 and 14 inches of water. If you do
not reduce incoming gas pressure, heater regula-
tor damage could occur. Install the external regu-
lator with the vent pointing down as shown in Fig-
ure 14. Pointing the vent down protects it from
freezing rain or sleet.
External Regulator
Propane/LP
Supply Tank
Figure 14 - External Regulator With Vent
Pointing Down
12
black iron or steel pipe. Inter-
nally-tinned copper tubing may
be used in certain areas. Check
your local codes. Use pipe of
large enough diameter to allow
proper gas volume to heater. If
pipe is too small, undue loss of
volume will occur.
GMP20PT, GMP16(T) - 3/8" or greater
GMP30BT, GMP26(T) - 1/2" or greater
Installation must include equipment shutoff valve,
union, and plugged 1/8" NPT tap. Locate NPT tap
within reach for test gauge hook up. NPT tap must
be upstream from heater (see Figure 15).
IMPORTANT: Install an equipment shutoff valve
in an accessible location. The equipment shutoff
valve is for turning on or shutting off the gas to
the appliance.
3/8" NPT
Pipe Nipple
Tee Joint
Reducer
Bushing to
1/8" NPT
1/8" NPT
Plug Tap
Vent
Pointing
Down
* A CSA design-certified equipment shutoff valve
with 1/8" NPT tap is an acceptable alternative to
test gauge connection. Purchase the optional CSA
design-certified equipment shutoff valve from your
dealer. See Accessories, page 25.
www.desatech.com
CAUTION: Use only new,
Typical Inlet Pipe Diameters
Pressure
Regulator
Tee Joint
Pipe
Nipple
Cap
Figure 15 - Gas Connection
Heater
Cabinet
Ground Joint
Union
Equipment
Shutoff
Valve *
3" Min.
From External
Regulator
(11" W.C. to
14" W.C.
Pressure)
113048-01C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gmp16tGmp26Gmp30btGmp20btGmp26t

Table of Contents