Carrier 58MVP100-20 Installation, Start-Up, And Operating Instructions Manual
Carrier 58MVP100-20 Installation, Start-Up, And Operating Instructions Manual

Carrier 58MVP100-20 Installation, Start-Up, And Operating Instructions Manual

4-way multipoise direct-vent variable-capacity condensing gas furnace

Advertisement

Visit www.carrier.com
Installation, Start-Up, and Operating Instructions
NOTE: Read the entire instruction
manual before starting the installation.
A93040
This symbol → indicates a change since the last issue.
Index
DIMENSIONAL DRAWING........................................................3
SAFETY CONSIDERATIONS .....................................................2
Clearances to Combustibles......................................................4
CODES AND STANDARDS........................................................5
INTRODUCTION ..........................................................................5
APPLICATIONS ......................................................................5-13
General ......................................................................................5
Upflow Applications..............................................................5-8
Downflow Applications.........................................................8-9
LOCATION ............................................................................13-14
General ....................................................................................13
Low-Heat Only Installation...............................................13-14
Hazardous Locations...............................................................14
INSTALLATION....................................................................14-15
Leveling Legs (If Desired)................................................14-15
Installation In Horizontal Applications ..................................15
AIR DUCTS............................................................................15-19
General Requirements.............................................................15
Ductwork Acoustical Treatment.............................................15
Supply-Air Connections..........................................................15
Return-Air Connections ..........................................................17
Filter Arrangement..................................................................18
Bottom Closure Panel.............................................................18
Gas Piping..........................................................................18-19
ELECTRICAL CONNECTIONS...........................................20-23
115-v Wiring......................................................................20-21
24-v Wiring.............................................................................21
Accessories..............................................................................23
DIRECT VENTING ...............................................................23-32
Common Vent Systems.....................................................24
Combustion-Air and Vent Piping .....................................24-29
Kit Installation..............................................................29-32
Multiventing and Vent Terminations .....................................32
CONDENSATE DRAIN..............................................................32
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4
PC 101
Catalog No. 535-80054
Tab 6a 8a
All manuals and user guides at all-guides.com
Variable-Capacity Condensing Gas Furnace
For Sizes 040-120, Series 170
Page
Printed in U.S.A.
4-Way Multipoise Direct-Vent
As an ENERGY STAR®
Partner, Carrier Corpora-
tion has determined that
this product meets the EN-
REGISTERED QUALITY SYSTEM
ERGY STAR® guidelines
for energy efficiency.
HORIZONTAL
LEFT
AIRFLOW
Fig. 1-Multipoise Orientations
General ....................................................................................32
Application ..............................................................................32
Condensate Drain Protection ..................................................32
SEQUENCE OF OPERATION..............................................32-37
(Adaptive Mode) ..........................................................34-35
Cooling Mode ....................................................................35-36
Thermidistat Mode..................................................................36
Super-Dehumidify Mode ........................................................36
Continuous Blower Mode .................................................36-37
Heat Pump...............................................................................37
Component Test ......................................................................37
START-UP PROCEDURES ..................................................37-46
General ....................................................................................37
Select Setup Switch Positions...........................................37-40
Prime Condensate Trap With Water ......................................41
Purge Gas Lines......................................................................41
Adjustments .......................................................................41-45
Set Gas Input Rate ............................................................41-42
Set Temperature Rise..............................................................43
Set Thermostat Heat Anticipator............................................43
Form 58MVP-12SI
Pg 1
58MVP
ama
CERTIFIED
AIRFLOW
UPFLOW
HORIZONTAL
RIGHT
DOWNFLOW
AIRFLOW
AIRFLOW
A93041
12-02
Replaces: 58MVP-11SI

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 58MVP100-20 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Safety and General Information
Safety Considerations
Covers general safety, ESD, and crucial warnings for installation.
Furnace Applications
Details different installation orientations like upflow, downflow, and horizontal.
Installation Procedures
Furnace Location and Clearances
Covers placement, required clearances, and specific site conditions.
General Installation Steps
Covers leveling, support, and orientation-specific installation.
System Connections
Air Ductwork and Filter Arrangement
Covers supply, return air, and filter requirements.
Combustion Air, Vent Piping, and Gas Piping
Covers venting, pipe sizing, and gas line installation.
Electrical Connections
Covers 115-v, 24-v wiring, and accessory connections.
Condensate Management and Operation Modes
Condensate Trap and Drainage System
Covers trap setup, priming, and protection.
Sequence of Operation
Explains heating, cooling, and Thermidistat modes.
Start-Up and Performance Tuning
Start-Up Procedures
Covers initial checks, setup switches, and priming.
Gas Input and Temperature Adjustments
Covers setting gas input rate, temperature rise, and heat anticipator.

Table of Contents