Pre-Installation Preparation - Desa VDVF36PN/PP Owner's Operation And Installation Manual

Direct-vent gas fireplace heater
Table of Contents

Advertisement

SELECTING LOCATION
Continued
7. Do not use this appliance if any part has been under water. Imme-
diately contact a local service technician to examine the appliance
and to replace any part(s) of the control ignition system and other
related components that have submerged under water.
Figure 3 - Possible Installation of Peninsula Fireplace
PRE-INSTALLATION
PREPARATION
CAUTION: Do not block required air spaces with
insulation or any other material. Do not obstruct the
effective opening of the appliance with any type of
facing material.
CLEARANCES
Minimum clearances to combustibles are:
• Back and Sides of Surround: ......................................... 0" min.
• Vent Surfaces: ............................................... 1" (2.54cm) min.
• Ceiling to Opening: ................................... 36" (91.44cm) min.
• Floor: ............................................................................. 0" min.
• Wall to Front of Glass: .............................. 36" (91.44cm) min.
• Perpendicular Wall to Opening of Unit: ....... 2" (5.08mm) min.
• Top Spacer: ................................................................... 0" min.
For more information, visit www.desatech.com
For more information, visit www.desatech.com
105706-01B

PRE-INSTALLATION PREPARATION

36"
(91cm)
Min.
WALL
36"
(91cm)
Min.
Figure 4 - Minimum Clearances (Peninsula Shown)
Left Side
Surround
(0" Min.)
Combustible
Material
Right Side
Surround
(0" Min.)
Wall In Front Of Glass
Perpendicular
Wall 2" (5cm)
Min. From Opening
Figure 5 - Minimum Clearances (See-Thru Shown)
SELECTING LOCATION
Clearances
CEILING
0" Floor
TOP VIEW
0"
Minimum 1"
Clearance from
Side (Only for
See-Thru)
2" (5cm)
36"
(91cm)
36" (91cm) Min.
5 5
Drywall
2 x 4 Stud

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents