We know that you will be pleased with our continued commitment to your satisfaction while you enjoy the benefits of heating with a Crown Royal Stove. Crown Royal Stoves are manufactured with quality workmanship and designed to offer you value now and for years to come.
BEST BURN PRACTICES Learn how to get the best burn possible from your Crown Royal Stove. Instructions – Read and follow all operating instructions supplied by Greentech Manufacturing, Inc. Fuels – Only burn clean wood, which is the only approved fuel in your Crown Royal Stove. Burning materials not recommended play a major role in visible emissions.
ADDITIONAL INSTALLATION AND OPERATIONAL CONSIDERATIONS Installation Person (s) operating a Crown Royal Stove must comply with all applicable laws or other requirements, such as state laws or regulations and local ordinances. Person (s) is/are also responsible for operation in a manner that does not create a public or private nuisance condition.
GUIDE TO BURNING WOOD The quality of the firewood you burn can have a big effect on the overall performance and efficiency of your furnace. The main factors that affect the burning characteristic of firewood are moisture, tree species, and size. It is important that you understand and follow our guidelines when choosing wood as a fuel source.
SAFETY INSTRUCTIONS & PRECAUTIONS • All installation and operation must follow federal, provincial, state, and local codes for wire plumbing, and installing a chimney. • All work must be performed by qualified personnel only. • Read and understand all precautions before operating the furnace. •...
PRECAUTIONARY LABELING The quality of the firewood you burn can have a big effect on the overall performance and efficiency of your furnace. The main Please read and follow these precautionary labels that are also found on the outdoor furnace.
INSTALLATION ALL INSTALLATIONS AND OPERATIONS MUST FOLLOW FEDERAL, PROVINCIAL, STATE, AND LOCAL CODES FOR WIRING, PLUMBING AND INSTALLING THE CHIMNEY. ALL WORK MUST BE PERFORMED BY QUALIFIED PERSONNEL ONLY. Location When choosing the location of your furnace you should consider: prevailing wind direction, distance from home for refueling and storage, and give consideration for any effect on your neighbors.
Page 12
INSTALLATION Ground Rod Installation A properly installed ground rod safe guard electrical equipment and prevent electrolysis in your outdoor furnace. Electrolysis is the decomposition of water into oxygen and hydrogen gasses when an electric current passes through the water. Free oxygen in the water tank will promote rust and over time cause leaks and furnace failure.
CHIMNEY REQUIREMENTS ALL INSTALLATIONS AND OPERATIONS MUST FOLLOW FEDERAL, PROVINCIAL, STATE, AND LOCAL CODES FOR WIRING, PLUMBING AND INSTALLING THE CHIMNEY. ALL WORK MUST BE PERFORMED BY QUALIFIED PERSONNEL ONLY. Chimneys The size and height all depends on the unit you have purchased and where the unit will be located. Contact your local dealer or Greentech Manufacturing, Inc.
TRANSFER LINE – INSTALLATION TRANSFER LINES ALL INSTALLATIONS AND OPERATIONS MUST FOLLOW FEDERAL, PROVINCIAL, STATE, AND LOCAL CODES FOR WIRING, PLUMBING AND INSTALLING THE CHIMNEY. ALL WORK MUST BE PERFORMED BY QUALIFIED PERSONNEL ONLY. Underground insulated pipe is a crucial part of your installation. It is designed to transfer hot water from your furnace to your home, garage or shop.
INSTALLATION INSTALLATION ALL INSTALLATIONS AND OPERATIONS MUST FOLLOW FEDERAL, PROVINCIAL, STATE, AND LOCAL CODES FOR WIRING, PLUMBING AND INSTALLING THE CHIMNEY. ALL WORK MUST BE PERFORMED BY QUALIFIED PERSONNEL ONLY. Making Water and Electrical Connections at the Furnace • After the furnace has been placed on the concrete or pads, remove the panel at the back of the stove. •...
EXISTING HOT WATER HEAT – INSTALLATION EXISTING HOT WATER HEAT - INSTALLATION ALL INSTALLATIONS AND OPERATIONS MUST FOLLOW FEDERAL, PROVINCIAL, STATE, AND LOCAL CODES FOR WIRING, PLUMBING AND INSTALLING THE CHIMNEY. ALL WORK MUST BE PERFORMED BY QUALIFIED PERSONNEL ONLY. It is recommended that piping used is able to withstand 100 PSI at 180 F, and is at least 1”...
Domestic hot water DOMESTIC HOT WATER & FORCED AIR - INSTALLATION ALL INSTALLATIONS AND OPERATIONS MUST FOLLOW FEDERAL, PROVINCIAL, STATE, AND LOCAL CODES FOR WIRING, PLUMBING AND INSTALLING THE CHIMNEY. ALL WORK MUST BE PERFORMED BY QUALIFIED PERSONNEL ONLY. DOMESTIC HOT WATER The domestic hot water flat plate kit consists of a water to water heat transfer unit and the fittings needed to hook it up.
BRAZED PLATE SETUP - INSTALLATION Brazed Plate Water to Water Exchanger The brazed plate heat exchanger can be installed on either the cold side or the hot side of the hot water heater. If installed on the cold side, the hot water needs to be left on to maintain the temperature in the hot water heater. If installed on the hot side, the hot water heater needs to be turned off and the hot water heater is now a reservoir.
Water WATER TO AIR SETUP - INSTALLATION Water to Air Heat Exchangers are for use in your hot air plenum of your existing forced air furnace, to transfer heat into your existing forced air system. PART NUMBER DESCRIPTION 10-007 1-1/4” COPPER ADAPTER C X FEMALE 15-003 1”...
Stove components STOVE COMPONENTS Description Part Number Auto Reset Snap Disk 50-035 Electronic Temperature Control 50-051 Solenoid 50-036 On-Off-On Switch 50-030 Thermowell 50-038 Fiberglass Silicone Door Rope – 1” 50-051 High Temp Silicone 50-050 Combustion Motor – 7300E & 7400E 50-020 Combustion Motor –...
Page 22
STOVE COMPONENTS Pristine Firebrick Refractory Part Numbers for All Models...
Control Panel CONTROL PANEL The aquastat powers the combustion blower to maintain the desired water temperature. The aquastat is set at 180°F at the factory, which means that combustion blower will run until the water in the jacket reaches 180°F. Only qualified personnel should be adjusting the temperature controls.
FIRING THE FURNACE FOR THE FIRST TIME Pristine Series furnaces are equipped with high temperature refractories. These refractories require curing upon first initial start-up. It is extremely important to heat the firebox up slowly to complete the curing process of the refractories or cracking will result.
OPERATION DAILY FUELING & FIRING ROUTINE Prior to opening fuel door, aggressively pull and push heat exchanger cleaning rod six to ten times which will ensure proper drafting. On the control panel located on the left side of the furnace remember to turn fan/light switch to either off or light position. Next press load switch time delay and wait 20 seconds to allow smoke to evacuate from the furnace.
Page 26
OPERATION STARTING DURING A PROLONGED POWER FAILURE During a prolonged power failure, where no power is being sent to the furnace, do not load with new fuel or try to start a new fire. It is recommended that you contact your local dealer or Greentech Manufacturing, Inc. to find out what size of generator is needed to keep your furnace running.
WEEKLY MAINTENACE WEEKLY MAINTENANCE Weekly cleaning or the secondary combustion areas are extremely important for the complete process of gasification. Use extreme CAUTION when opening and cleaning doors, these areas will still be hot and could cause personal injury. 1. Fuel in firebox must be burned down to perform weekly maintenance. 2.
GENERAL MAINTENANCE Usage of authorized Control chemical is required in all Crown Royal Stoves. To uphold your warranty annual water testing is necessary. Do not allow moisture to come in contact with ashes the in the firebox. Do not rake coals into the secondary burn chamber. It is mandatory to have a rain cap on the termination of your chimney.
Page 29
• Care for the exterior of your furnace is minimal. The unit may be washed using water and a mild non-abrasive cleaner suitable for painted surfaces. Avoid direct water pressure to electrical components and connections. CAUTION!!! Make certain that all electrical power to the furnace and components are shut off before washing. REPLACING DOOR ROPE GASKETS To replace door rope gaskets, start with a 1”...
TROUBLESHOOTING If the furnace fails to heat up: 1. Check fire. 2. Check combustion motor for operation. 3. Check solenoid damper is open to allow air velocity. 4. Check water level of furnace. 5. Check for creosote blockage at chimney and bypass trough. 6.
AUTHORIZED FURNACE TREATMENT Greentech Manufacturing, Inc. requires the usage of authorized furnace treatment to be used in all Crown Royal Stoves. Treatment is to be added to the furnace water upon initial startup and is required to remain at satisfactory levels throughout the life of the stove.
FURNACE TREATMENT PROCEDURE Initial Start-up Procedure for Water Treatment All Crown Royal Stove purchases are required to purchase authorized water treatment for initial start-up. With each gallon of treatment, you will be provided with two sample bottles and furnace information forms. •...
Follow directions for collecting of water sample and mail to facility for testing annually. Purchasing Water Treatment Water treatment is specially formulated for Crown Royal Stoves. To uphold warranty no other chemical may be substituted. We encourage customer to contact your local dealership or call 866-361-7355 to purchase additional water treatment when needed.
EMERGENCY PROCEDURE FOR CHEMICAL EMERGENCY FIRST AID PROCEDURES FOR FURNACE TREATMENT EMERGENCY PHONE NUMBER 1-800-424-9300 INHALATION: Remove from the area to fresh air. If not breathing, clear the airway and start mouth to mouth artificial respiration. GET IMMEDIATE MEDICAL ATTENTION. EYE CONTACT: Immediately rinse the eyes with water.
20 YEAR LIMITED WARRANTY Thank you for making the choice to purchase your new Crown Royal Stove. We are certain that you will find great satisfaction with your stove’s ongoing reliability and performance. Greentech Manufacturing, Inc. warrants this furnace, to the original owner, to be free of defects in material and workmanship for a period of twenty (20) years from the date of purchase.
Need help?
Do you have a question about the 7300E and is the answer not in the manual?
Questions and answers