Advertisement

Quick Links

INSTALLATION INSTRUCTIONS
E6100-25, E6100-38, E6100-50

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the INNI E6100-38 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Choose and Prep Installation Location
IN-SIGHT Installation Preparation
Guides users through selecting and preparing for the IN-SIGHT installation method.
AT-WALL Installation Preparation
Details the preparation steps for the AT-WALL installation method.
IN-SHADOW Installation Preparation
Covers the preparation process for the IN-SHADOW installation type.
Assemble the INNI Drain
Install Transition Ramps
Instructions on how to install transition ramps for smooth internal flow.
Attach Left and Right End Sweeps
Steps for correctly attaching the left and right end sweeps to the drain body.
Install End Sweep Decks
Guidance on preparing and installing the end sweep decks for the INNI.
Install Stiffening Rails
Details on measuring, cutting, and installing the aluminum stiffening rails.
Install the INNI Drain
Install INNI in Wood Framed Floor
Step-by-step guide for installing the INNI in wood-framed floor structures.
Install INNI in Concrete Floor
Instructions for installing the INNI in various concrete floor applications.
Install INNI For Hot Mop
Procedures for adapting the INNI to hot mop installations using the receptor kit.
INNI Accessories
INNI Cleaning Brush Kit
Details about the brush kit for cleaning interior surfaces of the INNI drain.
INNI Drain Coupler Kit
Information on using the coupler kit to attach multiple INNI drains together.
INNI Hot Mop Receptor Kit
Explanation of the receptor kit for adapting the INNI to hot mop installations.

Table of Contents