Initial Inspection
Instructions for inspecting the unit upon delivery for any shipping damage.
Lifting the FlexiCool
Provides safety guidelines and techniques for lifting and moving the FlexiCool unit.
Setup
Details the requirements for installing the FlexiCool unit in a laboratory environment.
Ambient Conditions
Specifies the ideal and acceptable ambient temperature ranges for optimal operation.
Electrical Requirements
Outlines the necessary electrical specifications, voltage, and plug types for the FlexiCool units.
Services and Utilities
Guides users on identifying essential unit information and ensuring proper power supply.
Installation
Provides detailed instructions and precautions for the physical installation of the unit.
System Preparation
Steps for preparing the system, including sensor connection and power connection.
Need help?
Do you have a question about the FTS FLEXICOOL IMMERSION COOLERS FC100 and is the answer not in the manual?
Questions and answers