TEMPERATURE SETTING SHOULD NOT EXCEED SAFE USE TEMPERATURE AT
FIXTURES. SEE TANK TEMPERATURE CONTROL WARNING ON PAGE 32. IF
HIGHER PREHEAT TEMPERATURES ARE NECESSARY TO OBTAIN ADEQUATE
BOOSTER OUTPUT, ADD AN ANTI-SCALD VALVE FOR HOT WATER SUPPLIED TO
FIXTURES.
IMPORTANT
THE INSTALLATION OF SAFETY FLOW SWITCH AS SHOWN IS REQUIRED TO
PROTECT THE BOILER IN CASE OF WATER SERVICE INTERRUPTION OR
CIRCULATOR FAILURE
(A.O. SMITH PKG. NO. 211480).
+
PIPING AND FITTINGS BETWEEN GATE VALVES AND BOILERS SHOULD BE
BRASS OR BRONZE. OTHER PIPING SHOULD CONFORM TO LOCAL CODES.
GATE VALVES ARE SHOWN FOR SERVICING BOILER. HOWEVER, LOCAL CODES
SHALL GOVERN THEIR USAGE.
*
PRESSURE RELIEF VALVE RATING SHOULD NOT EXCEED PRESSURE
CAPACITY OF ANY COMPONENT IN THE SYSTEM.
**
INSTALL THERMOMETER AND PRESSURE RELIEF IN OPENINGS PROVIDED
ON HW-520, HW-610 & HW-670.
USE THIS TABLE FOR CORRECT
PUMP AND WATER PIPE SIZE
MinimumPipe Size
Model
(Inches)
Number
A
HW-520
2-1/2"
HW-610/670
3"
*Assumes 50 equivalent feet pf piping or less.
THREE HW-520's, HW-610's OR HW-670's UP-FLOW MODEL
COMMERCIAL BOILER WITH VERTICAL TANK, CER-TEMP 80
DANGER
B & G
*Armstrong
Pump
Pump
B
Size
Size
1-1/2"
2"
S-45 2-1/2"
1-1/2"
3" HD-3
S-46
FIGURE 33
38
38
38
38
38
WIRING - FIGURES 20, 21, 22 OR 23