Outillage nécessaire pour l'installation
- 1 jeu de clés plates : 7 à 32
- 1 clé à molette
- 1 jeu de tournevis plats
- 1 jeu de clés mâles 6 pans
- 1 cutter
- 1 perceuse + 1 jeu de forets
- 1 paire de tenaille
- 1 clé dynamométrique
S.A.S LECOMBLE & SCHMITT
B.P. n°2 - 64240 URT - FRANCE
;
+33(0)559 562 646 -
@ : commercial2@ls-france.com - : : www.ls-france.com
Tools required for the installation
- 1 set of spanners: 7 to 32
- 1 adjustable spanner
- 1 set of straight screwdrivers
- 1 set of hexagon keys
- 1 cutter
- 1 drilling machine + 1 set of drill bits
- 1 pair of pliers
- 1 torque wrench
1
+33(0)559 569 571
Validé par / Approved by
Date : 23-11-2016

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RV2 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Mounting Instructions
RV07 Power Pack Mounting
Instructions for positioning and securing the RV07 power pack.
RV1, RV2, RV3 Power Packs Mounting
Instructions for positioning and securing RV1, RV2, or RV3 power packs.
EV2, EV3, HVR Power Packs Mounting
Instructions for positioning and securing EV2, EV3, or HVR power packs.
HF Power Units Mounting
Instructions for positioning and securing HF electro-hydraulic units.
Hydraulic Connection Drawings
RV07, RV1, RV2, RV3 Hydraulic Connections
Diagrams for hydraulic connections of RV07, RV1, RV2, RV3 power packs.
EV2, EV3, HVR 1/3 Hydraulic Connections
Diagrams for hydraulic connections of EV2, EV3, HVR 1/3 power packs.
HF Hydraulic Connections
Diagrams for hydraulic connections of HF units.
Connection Types and Fittings
Clamp Fitting Procedures
Detailed steps for performing clamp fittings on hydraulic tubes.
Screwed and Crimp Connection Methods
Instructions for screwed and crimp type hydraulic connections.
Swaged Fittings and Flexible Tubes
Procedures for swaged fittings and pre-swaged flexible tubes.
Electric Connection Drawings
RV07, RV1, RV2, RV3 Electric Connections
Wiring diagrams for RV07, RV1, RV2, RV3 power packs.
EV2, EV3, HVR 1/3, HF Electric Connections
Wiring diagrams for EV2, EV3, HVR 1/3, and HF power packs.
System Filling and Bleeding
RV07, RV1, RV2, RV3 Single Station Filling & Bleeding
Filling and bleeding procedure for single station with RV07, RV1, RV2, RV3.
RV07, RV1, RV2, RV3 Twin Station Filling & Bleeding
Filling and bleeding procedure for twin station with RV07, RV1, RV2, RV3.
EV2, EV3, HVR 1/3, HF Single Station Filling & Bleeding
Filling and bleeding procedure for single station with EV2, EV3, HVR 1/3, HF.
EV2, EV3, HVR 1/3, HF Twin Station Filling & Bleeding
Filling and bleeding procedure for twin station with EV2, EV3, HVR 1/3, HF.
Final Checks and Operation
Final Operations Checklist
Final steps and checks for single and twin steering stations.
Operational Test Checks
Verifying correct function of the steering system and components.