INSTALLING
Continued
104024
Side Wall
Top View
Back Wall
12
"
Minimum
Side Wall
Corner
Wall
Wall
6
"
Minimum
Figure 4 - Minimum Clearance to Walls and Ceiling
STOVE CAVITY ASSEMBLY
1. Lift off corrugated box enclosing stove body crating.
2. Remove all screws fastening the wood frame enclosure. Spread wood frame
open and lift away from plastic-bagged stove body. The bottom pieces of
pallet wood will remain bolted to the stove body.
3. Remove plastic bag from stove body.
4. Remove back panel from stove (see Figure 5). Use an adjustable wrench or a
10 mm socket. Remove six (6) bolts and washers. Keep bolts and washers to
reattach back panel later.
Bolt
Product
Identification
Label
Front View
Ceiling
48"
Minimum
12"
Minimum
6
"
Minimum
12
"
Minimum
Side Wall
6
"
Minimum
Front of
Stove Unit
Figure 5 - Removing Back Panel
12"
Side Wall
Minimum
Side View
Ceiling
48"
Minimum
Back Wall
6"
Minimum
Floor
Back Stove Panel
Continued
9