Download Print this page

InoTec CPUSB 220/48.1 Series Mounting And Operating Instructions

Central battery system

Advertisement

Quick Links

Montage- und Betriebsanleitung
Zentralbatteriesystem
CPS 220 / 48.1 / J-SV / J-SKÜ
Mounting- and Operating Instructions
Central Battery System
CPS 220 / 48.1 / J-SV / J-SKÜ
Sicherheitstechnik GmbH
Sicherheitstechnik GmbH

Advertisement

loading
Need help?

Need help?

Do you have a question about the CPUSB 220/48.1 Series and is the answer not in the manual?

Questions and answers

Summarization of Contents

General Information and Safety
Explanation of Symbols
Explains the meaning of symbols used in the manual for important safety information.
Liability and Warranty
Details INOTEC's liability and warranty exclusions for improper use or installation.
Spare Parts and Disposal
Specifies the use of original spare parts and guidelines for product disposal.
Troubleshooting and Fault Correction
Provides instructions on how to correct faults and reset error indications.
Safety and Handling Instructions
Safety Instructions and Precautions
Outlines critical safety guidelines for installation, operation, and maintenance.
Transport and Storage Guidelines
Provides instructions for safe transport, handling, and storage of the device and batteries.
Product Description and Specifications
Central Battery System Overview
Describes the CPS 220/48.1 system, its Joker technology, and modular design.
BUS Sub-Stations (CPUSB)
Details the functionality and expansion levels of CPUSB sub-stations for external circuits.
Technical Data for CPS and CPUS Systems
Provides detailed technical specifications for various CPS and CPUS device versions.
Technical Data for CPUSB Sub-Stations
Details technical specifications for CPUSB sub-stations across different models.
Assembly and Electrical Connections
Cabinet Installation and Connection
Instructions for mounting CPS, CPUS, and CPUSB cabinets and connecting components.
Battery Installation and Wiring
Detailed steps for installing batteries, connecting terminals, and ensuring correct polarity.
Electrical Connection and System Structure
Diagrams and explanations of the system's electrical connections and structure.
System Commissioning Procedures
Pre-Commissioning Checks
Steps to check connections, polarity, and perform insulation measurements before energizing.
Energising and De-energising the System
Specifies the correct sequence for switching the central battery system on and off.
System Programming and Configuration
Standard Controller Programming
Overview of the standard controller's display, LEDs, buttons, and basic operations.
Test Menu Operations
Guides through running function tests, battery duration tests, and learn modes.
Info Menu for System Status
Accessing information on device settings, faults, logbook, circuits, and components.
Programming and Configuration Settings
Details on setting date/time, using INOSTICK, saving/loading configurations, and network settings.
Comfort Controller Programming
General TFT Controller Operation
Describes the TFT screen, control knob, USB interface, and basic navigation.
SD Card and Help Text Functions
Instructions for updating the SD card and accessing help texts within the menus.
Info Menu Navigation and Data Access
How to navigate the Info menu to retrieve device, circuit, battery, and component information.
Module-Specific Settings and Programming
Details on programming DPÜ/B, LSA modules, RIF, SHUNT, and SLÜ components.
System Testing Procedures
Initial and Recurring Safety Tests
Guidelines for initial and recurring electrical system tests as per national regulations.
Scheduled Maintenance Checks
Details on monthly, semi-annual, annual, and three-year checks for system functionality.
Battery Inspection and Monitoring Protocols
Procedures for inspecting batteries and documenting maintenance for warranty claims.
Appendices and Support
Documentation and Technical Data
Information on documentation CD contents, wire lengths, and customer service contacts.
Troubleshooting Luminaire Failures
Steps to check for luminaire failures and perform function tests.