Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
EGO Manuals
Solar panel
PRIME 220
Installation and user handbook
EGO PRIME 220 Installation And User Handbook
Solar collector with integrated storage
Hide thumbs
1
2
3
Table Of Contents
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
page
of
32
Go
/
32
Contents
Table of Contents
Bookmarks
Table of Contents
Table of Contents
Inside the Box
Optional Accessories
Explanation of the Symbols Used
Abbreviated Signs
Danger Signs
Personal Protective Equipment
Warnings
General Indications
Indications for Safety
Protection from Vacuum Overheating
Protection from Burns
Protection against Lightning
Laws and Reference Standards
Specifications on Water Quality
System Description
Technical Characteristics
The Solar Collector
The Storage
Note on the Integrated Storage System
Technical Data
Operation Principles
Installation
General Indications and Moving
Structural Check
Safety Precautions While Assembling
Installation on a Flat Roof
Place and Position
Necessary Items
Installation Phases
Installation on a Sloped Roof
Place and Position
Necessary Items
Installation Phases
Hydraulic Connection
General Layout
Layout 1: Hydraulic Connection to a Traditional Boiler
Layout 2: Hydraulic Connection to a Boiler Prepared for Operation with a Solar Power System
Indications on Gaskets and Connections
Using Flexible Hoses
Other Indications
Safety and One-Way Valve
Safety Unit
Pressure Reducer
Backflow Preventer
Thermostatic Mixer Valve
Connecting more than One Collector
Expansion Vessel
Starting
Using the Cover Sheet
Start-Up
Elettrical Integration Kit
Types of Electric Resistor
Installing the Electric Resistors
Indications on Using Electric Resistors
Guarantee Conditions
Environmental Protection
Final Notes
Solar Keymark Certification
Programmed Maintenance
Advertisement
Quick Links
Download this manual
EGO PRIME 110 | 150 | 180 | 220 | 260
Senza titolo-2 1
12/03/18 16:32
INSTALLATION AND USER HANDBOOK
EGO PRIME solar collector with integrated storage
www.pleion.it
ENG - REV1.1
Table of
Contents
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Table of Contents
Need help?
Do you have a question about the PRIME 220 and is the answer not in the manual?
Ask a question
Questions and answers
Related Manuals for EGO PRIME 220
Solar panel EGO PRIME 110 Installation And User Handbook
Solar collector with integrated storage (32 pages)
Solar panel EGO PRIME 150 Installation And User Handbook
Solar collector with integrated storage (32 pages)
Solar panel EGO PRIME 180 Installation And User Handbook
Solar collector with integrated storage (32 pages)
Solar panel EGO PRIME 260 Installation And User Handbook
Solar collector with integrated storage (32 pages)
Solar panel EGO POWER+ SP2000 Operator's Manual
100w/200w solar panel (52 pages)
Solar panel EGO POWER+ SP1000 Operator's Manual
(52 pages)
Summarization of Contents
Inside the Box
Optional Accessories
Electric Resistors
Optional resistors for antifreeze and system integration.
Safety and Control Components
Units for safety, pressure, and temperature control.
Explanation of Symbols
Abbreviated Signs
Symbols indicating important notes, materials, and connections.
Danger Signs
Symbols indicating hazards like burns, falls, and electric shock.
Personal Protective Equipment (PPE)
Symbols for required PPE for safe operation.
Warnings and Safety
General & Safety Indications
General advice, installer requirements, and safety precautions.
Specific Hazard Warnings
Warnings for overheating, burns, and lightning protection.
Applicable Laws and Standards
List of relevant regulations and standards.
Water Quality Specifications
Parameter Limits
Required limits for pH, chloride, iron, sulphate, and conductivity.
Hardness Recommendations
Guidance on water hardness and potential issues.
System Description
Technical Characteristics
Overview of the collector and storage unit features.
System Components
Details on collector and storage unit parts and construction.
Integrated Storage System Notes
PED compliance and CE marking information for the storage.
Technical Data
Operation Principles
Installation Fundamentals
General Indications and Moving
Guidelines for assembly, maintenance, and safe handling.
Structural Check
Requirements for checking building structure capacity for loads.
Safety Precautions During Assembly
Warnings about wind, falling objects, and hanging loads.
Flat Roof Installation Details
Placement and Positioning
Instructions on selecting optimal locations for collectors.
Necessary Items for Installation
List of tools and PPE required for installation.
Flat Roof Installation Phases
Sloped Roof Installation Details
Placement and Positioning
Instructions on selecting optimal locations for collectors.
Required Items
List of tools and PPE required for installation.
Sloped Roof Installation Phases
Hydraulic Connection (Models 110/180/260)
General Layout
Diagram and explanation of standard hydraulic connections.
Hydraulic Connection (Models 150/220)
General Layout
Diagram and explanation of standard hydraulic connections.
System Layout Examples
Hydraulic Connection Layouts
Examples for traditional and solar power system boilers.
Connection Best Practices
Guidelines on gaskets, tightening, flexible hoses, and pipes.
Safety and Control Valve Assembly
Safety and One-way Valve
Installation of the standard safety and one-way valve.
Alternative Safety Unit
Information on using an alternative safety unit.
Backflow Preventer and Pressure Reducer
Backflow Preventer Installation
Instructions for positioning and fixing the backflow preventer.
Pressure Reducer Installation
Obligatory installation of the pressure reducer.
Mixer Valve and Multiple Collectors
Thermostatic Mixer Valve
Installation for temperature control and burn prevention.
Connecting Multiple Collectors
Guidelines for parallel connection of collectors.
Expansion Vessel
Starting the System
Using the Cover Sheet
Instructions on covering the collector during installation and filling.
System Start-up Procedures
Initial Filling and Venting
Steps for filling the system with water and removing air.
Rinsing and Initial Use
Procedures for rinsing the system and initial water usage.
Pre-commissioning Checks
Checks for safety components, leaks, and water supply.
System Usage When Unused
Short Periods of Unuse
Guidance for leaving the system filled for up to 30 days.
Emptying the System
Steps for emptying the system for maintenance or protection.
Electrical Integration Kit
Types of Electric Resistors
Overview of available antifreeze and integration resistors.
Electric Resistor Installation and Use
Installing Electric Resistors
Steps for installing integration and antifreeze resistors.
Using Electric Resistors
Guidelines and warnings for operating electric resistors.
Guarantee Conditions
Guarantee Coverage and Exclusions
Details on what the guarantee covers and excludes.
Environmental Protection
Information on material recycling and disposal.
Final Notes and Compliance
Product safety, EU directives, and Solar Keymark certification.
Programmed Maintenance
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the PRIME 220 and is the answer not in the manual?
Questions and answers