Advertisement

iBattery 3.0
Quick Guide
Issue: 05
Part Number: 31509755
Date: 2019-07-02
1
Overview
iBOX
Item
Model
iBOX
iBOX
iBAT
iBAT-12V
Adapter
POE35-54A
HALL
N/A
Copyright © Huawei Technologies Co., Ltd. 2019. All rights reserved.
iBAT
Function
Battery information
collection module
12 V battery
monitoring module
Power supply for the
iBOX
Battery current
detection
1
Adapter
Description
One iBOX supports a maximum of
200 iBATs, and manages iBATs for a
maximum of four battery strings.
Supports 12 V power input and
detects the voltages, internal
resistances, and pole temperatures
of batteries.
N/A
One iBOX can connect to a
maximum of eight Hall effect sensors.
Hall

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Hall and is the answer not in the manual?

Questions and answers

Summarization of Contents

2 Installing Equipment
Installing the iBAT
Steps and safety guidelines for installing the iBAT module onto battery terminals.
Installing Hall Effect Sensors
Instructions for installing Hall effect sensors, detailing placement and current direction.
Installing the iBOX
Procedures for mounting the iBOX, including antenna installation and secure attachment.
Installing an Adapter
Guidelines for selecting a mounting location and installing the adapter.
3 Cable Connections and Commissioning (UPS Scenario)
Connecting Cables
How to prepare and connect RJ45 cables for PoE and COM ports in the UPS scenario.
4 Cable Connections and Commissioning (EIC800 or ECC800 Scenario)
Connecting Cables
Connecting cables for old and new BIB boards in ECC800/EIC800 scenarios.
5 Cable Connections and Commissioning (NetEco Scenario)
Connecting Cables
Connecting the iBOX for NetEco scenarios, with or without POE.
Logging In to the iBOX WebUI and Setting Parameters
How to log into the iBOX WebUI for NetEco configuration.
6 Networking the iBOX and iBAT
Serial Networking
Procedure for serial networking of iBATs with iBOX, including indicators and steps.
Parallel Networking
Steps for parallel networking of iBATs, including SN collection and import.
7 Appendix
Verifying the Installation
A checklist to verify that all iBAT system devices are installed correctly.
Indicator Description
Explains the meaning and status of iBOX indicators like PWR, ALM, RUN, and RF_Z.

Table of Contents