Thinkware BAB-100 Installation Manual

Thinkware BAB-100 Installation Manual

Ivolt dash cam external battery

Advertisement

Customer Quality Management
iVolt Dash Cam External Battery
Models: BAB-50 & BAB-100 (overseas models)
Apr 3, 2018
CS Department
Customer Quality Management Department
1
© 2018 THINKWARE. All rights reserved.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BAB-100 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Installation Guide
Battery Location Options
Guides on selecting optimal locations for the external battery within the vehicle.
Charging & Output Cable Routing
Details routing charging and output cables under the vehicle's carpet and trim.
Constant Power Cable Routing
Guides on routing the constant power cable from the kick panel to the dash cam.
Fuse Selection & Holder Usage
Explains fuse selection, dual fuse holder use, and recommended fuse types.
Fuse Slot Power Direction Check
Details how to identify correct fuse slot terminals for safe power output connection.
Charging Cable Power Connection
Guides on securely connecting the charging cable's power to the fuse holder and slot.
ACC IN & Ground Wire Connections
Details connecting ACC IN wire to fuse slot and ground wire to vehicle chassis.
Output Cable & Wire Management
Covers connecting output cable to dash cam and neatly organizing slack wires.
Battery Securing & Final Testing
Explains securing the battery with Velcro and performing final system testing.
Setting Adjustment for Parking Mode
Guides on adjusting camera settings for optimal parking mode recording.
Important Precautions
Charging Cable Safety Rules
Follow safety guidelines for charging cable extension, connection, and soldering.
General Installation Best Practices
Adhere to general advice on manual reference, fuse checks, and fuse holder usage.

Table of Contents