Bosch E2800 60-bay Installation Manual
Bosch E2800 60-bay Installation Manual

Bosch E2800 60-bay Installation Manual

Hide thumbs Also See for E2800 60-bay:
Table of Contents

Advertisement

Quick Links

DSA E‑Series (E2800 60‑bay)
DSA‑N6C8X4‑60AT | DSA‑N6C8X8‑60AT | DSA‑N6C8XA‑60AT |
DSX‑N6D8X4‑60AT | DSX‑N6D8X8‑60AT | DSX‑N6D8XA‑60AT |
DSX‑NRCK40‑INT8
en
Installation manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the E2800 60-bay and is the answer not in the manual?

Questions and answers

Summarization of Contents

Safety
Safety Message Explanation
Explains the meaning of safety symbols like Notice, Caution, and Warning.
Safety Precautions
Lists precautions for power supply units and installation personnel, adhering to standards.
Important Safety Instructions
Detailed safety instructions for operating, cleaning, and servicing the device.
Warning Notices
Specific warnings regarding high leakage current, lifting hazards, and electrical outlet safety.
Caution Notices
Cautions related to battery handling, double pole/neutral fusing, and lifting weight limits.
Notices
Information regarding the product being a Class A device and potential radio interference.
Before You Begin
Hardware Registration
Instructions for registering your device with Bosch and creating a new account.
Additional Equipment
Lists the necessary tools and equipment required for installation.
Additional Documentation
Information on where to find software downloads and further documentation.
System Overview
Device Views
Front and rear views of the 60-bay unit with labeled components for identification.
LEDs on the Operator Display Panel
Details the LEDs found on the operator display panel of controller and expansion units.
LEDs on the Controller Unit
Explains the status LEDs located on the back of the controller unit.
LEDs on the I/O Modules
Describes the LEDs on the I/O modules, indicating link status and activity.
LEDs on the Drives
Explains the Activity and Attention LEDs for the drives installed in the unit.
LEDs on the Drive Drawer
Details the Attention/Locate LED for the drawer and Activity LEDs for individual drives.
LEDs on the Power Canister
Describes the Power and Attention LEDs on the power canisters.
LEDs on the Fan Canister
Identifies the Attention LED on the fan canister and its meaning.
Installation
Installing a 60-bay unit
Instructions for mounting the 60-bay unit into a four-post rack or system cabinet.
Installing a 60-bay unit with SuperRail
Steps for installing the unit using SuperRail into square-hole racks.
Installing SuperRail to square-hole four-post rack
Detailed guide for attaching SuperRail to square-hole rack posts.
Installing SuperRail to round-hole four-post rack
Guide for installing SuperRail onto round-hole racks using adapter brackets.
Installing the drives
Procedure for correctly installing drives into the unit's drive drawers.
Installing the front bezel and end caps
Steps for attaching the front bezel and end caps to the unit.
Setting the unit ID using the ODP button
Instructions for setting or changing the unit ID via the operator display panel button.
Connection
Connecting the expansion units
Procedure for connecting expansion units to the controller using SAS cables.
Connecting the controller unit to the network
Steps to connect the controller to the Ethernet network using iSCSI ports.
Connecting the controller unit to the management hosts
How to set up an out-of-band connection to management hosts.
Connecting the units to the power supply
Procedure for connecting the controller and expansion units to the power supply.
Supported connections
Recommended connection methods for optimal system performance.
Turning on/off AC power
Turning on AC power
Detailed steps for powering on the controller and expansion units safely.
Turning off AC power
Procedure for safely powering down the system and its components.
Maintenance
Replacing a drive in a 60-bay unit
Procedure to replace a failed or impending failed drive in the unit.
Preparing to replace a drive
Steps to prepare for drive replacement, including locating the failed drive.
Removing a drive
Step-by-step guide to remove a drive from the drive drawer.
Installing a drive
Procedure for correctly installing a new drive into the drive drawer.
After replacing a drive
Steps to confirm the new drive is working correctly after installation.
Replacing a power canister
Instructions for replacing a failed power canister to maintain redundancy.
Preparing to remove a power canister
Steps to prepare for power canister replacement, including data collection.
Removing a power canister
Procedure to remove a power canister from the unit.
Installing a power canister
Procedure to install a new power canister into the unit.
After replacing a power canister
Steps to confirm the new power canister is working correctly.
Replacing a fan canister
Instructions for replacing a failed fan canister to ensure adequate cooling.
Preparing to remove a fan canister
Steps to prepare for fan canister replacement, including data collection.
Removing and replacing a fan canister
Procedure to remove and replace a fan canister within 30 minutes.
After replacing a fan canister
Steps to confirm the new fan canister is working correctly.
Seven-segment display codes
Explains codes displayed on the seven-segment display for errors and states.
Seven-segment display sequence codes
Details category and detail codes for sequence sequences.
Seven-segment display codes when controller turns on
Lists codes displayed during the controller startup process.
Seven-segment display use cases
Provides examples of seven-segment display sequences for various scenarios.
Seven-segment display lock-down codes
Explains lock-down codes for suspended states and their causes.
Collecting support data for the storage system
Procedures for collecting support data using SANtricity System Manager or Script editor.

Table of Contents