Advertisement

S
ERVICE MANUAL
F-Series
Fork Positioners
Manual Number 208743-R1
c sc de
corpor tion
Cascade is a Registered Trademark of Cascade Corporation

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 100F and is the answer not in the manual?

Questions and answers

Summarization of Contents

Introduction
Special Definitions
Explains the meaning of special statements like WARNING, CAUTION, IMPORTANT, and NOTE.
Installation
Truck System Requirements
Specifies minimum pressure and flow volume for the lift truck hydraulic system.
Recommended Hydraulic Supply
Details the appropriate hydraulic supply configurations based on valve type.
Installation Procedures
Outlines the step-by-step process for mounting the attachment on the truck.
Install forks
Procedure for removing old forks, installing new forks, and adjusting clearance.
Install backrest
Instructions for installing the backrest, including torque specifications.
Install solenoid control knob–Solenoid equipped units
Steps for installing the control knob for attachments with solenoid functionality.
Install wiring – Solenoid equipped units
Diagram and instructions for wiring the solenoid-equipped fork positioner.
Flush hydraulic supply hoses
Procedure for flushing the hydraulic supply hoses before connecting.
Install hoses
Illustrations showing hose connections for different valve types.
Auxiliary Valve Functions
Diagrams showing valve functions for standard, sequence, and solenoid valve types.
Lubrication Points – 100 hours
Identifies lubrication points and frequency for initial maintenance.
Inspect Forks and Upper Carriage Bar – 500 hours
Inspection points for carriage bar and fork hook wear using a wear gauge.
Periodic Maintenance
100 Hour Maintenance
Lists essential checks and lubrication tasks for every 100 hours of operation.
500 Hour Maintenance
Details additional checks and lubrication for 500-hour intervals.
1000 Hour Maintenance
Specifies bearing inspections and replacement criteria for 1000-hour intervals.
2000 Hour Maintenance
Major component replacements required every 2000 hours.
Troubleshooting
General Procedures
Covers safety, system checks, and general troubleshooting methodology.
Truck System Requirements
Verifies truck hydraulic specifications are met for proper function.
Tools Required
Lists specialized tools needed for troubleshooting hydraulic systems.
Troubleshooting Chart
Provides a guide to common issues and directs to specific solutions.
Plumbing
Details hydraulic hose routing and circuit schematics for different valve types.
Hosing Diagram: Non-Flow Divider and Flow Divider Valve
Illustrates hose routing for non-flow divider and flow divider valve systems.
Circuit Schematic: Non-Flow Divider and Flow Divider Valve
Provides the hydraulic circuit schematic for non-flow divider and flow divider systems.
Hosing Diagram: Sequence Valve
Illustrates hose routing for fork positioners with a sequence valve.
Circuit Schematic: Sequence Valve
Provides the hydraulic circuit schematic for sequence valve systems.
Hosing Diagram: Solenoid Valve
Illustrates hose routing for fork positioners with a solenoid valve.
Circuit Schematic: Solenoid Valve
Provides the hydraulic circuit schematic for solenoid valve systems.
Fork Position Circuit
Addresses common problems and solutions for fork positioning operation.
Sideshift Circuit
Addresses common problems and solutions for sideshift operation.
Electrical Circuit
Guides troubleshooting of electrical components for solenoid-equipped units.
Service
Attachment Removal
Step-by-step instructions for safely detaching the fork positioner from the truck.
Bearings
Covers lubrication, service, and inspection of various bearings.
Bearing Lubrication
Details lubrication points and intervals for all bearings.
Fork Carrier Bearing Service
Procedure for servicing the bearings within the fork carrier assembly.
Carriage Bearing Service
Procedure for servicing the bearings on the truck carriage.
Valves
Covers removal, service, and replacement of hydraulic valves.
Valve Removal
Instructions for safely disconnecting and removing hydraulic valves.
Flow Divider Valve Service
Detailed procedure for servicing the flow divider valve cartridge.
Sequence Valve Service
Detailed procedure for servicing the sequence valve.
Solenoid Valve Service
Detailed procedure for servicing the solenoid valve.
Sideshift Cylinder
Covers adjustment, removal, disassembly, inspection, and reassembly of the sideshift cylinder.
Cylinder Speed Adjustment
Explains how to adjust the sideshifting speed using the restrictor washer.
Cylinder Removal
Steps for safely removing the sideshift cylinder from the attachment.
Cylinder Disassembly
Detailed instructions for taking apart the sideshift cylinder.
Cylinder Inspection
Guidelines for inspecting sideshift cylinder components for damage.
Cylinder Reassembly
Detailed instructions for putting the sideshift cylinder back together.
Fork Position Cylinders
Covers removal, disassembly, inspection, and reassembly of fork position cylinders.
Cylinder Removal
Steps for safely removing the fork position cylinders.
Cylinder Disassembly
Detailed instructions for taking apart the fork position cylinders.
Cylinder Inspection
Guidelines for inspecting fork position cylinder components for damage.
Cylinder Reassembly
Detailed instructions for putting the fork position cylinders back together.
Specifications
Hydraulics
Lists hydraulic relief setting, flow volume, and oil compatibility requirements.
Auxiliary Valve Functions
Illustrates the operational functions of different auxiliary valve types.
Truck Carriage
Specifies dimensional requirements for the truck carriage and notch inspection.
Torque Values
Provides torque specifications for various fasteners in the attachment.

Table of Contents

Save PDF