Unpacking; Assembly - Desa BY150ECA Owner's Manual

Portable forced air heaters 150,000 btu/hr 120v/60 hz 100,000 btu/hr 120v/60 hz
Table of Contents

Advertisement

UNPACKING

ASSEMBLY

102424
1. Remove all packing items applied to heater for shipment.
2. Remove all items from carton.
3. Check items for shipping damage. If heater is damaged, promptly inform dealer
where you bought heater.
These models are furnished with wheels and a front handle. Some models are
furnished with a rear handle also. Wheels, handle(s), and the mounting hardware
are found in the shipping carton.
Tools Needed
• Medium Phillips Screwdriver
• 3/8" Open or Adjustable Wrench
• Hammer
1. Slide axle through wheel support frame. Install wheels on axle.
When installing wheels, point extended hub of wheels toward
IMPORTANT:
wheel support frame (see Figure 3).
2. Place cap nuts on axle ends. Gently tap with hammer to secure.
3. Place heater on wheel support frame. Make sure air inlet end (rear) of heater is
over wheels. Line up holes on fuel tank flange with holes on wheel support
frame.
4. Place front handle and rear handle on top of fuel tank flange. Insert screws
through handles, fuel tank flange, and wheel support frame. Attach nut finger
tight after each screw is inserted.
5. After all screws are inserted, tighten nuts firmly.
Screw
Hot Air
Outlet
Fuel
Tank
Flange
Wheel
Support
Frame
Wheel
Nut
Cap Nut
Figure 3 - Wheel and Handle Assembly
Front Handle
Extended
Hub
Axle
Rear Handle
Air Inlet
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

By100eca

Table of Contents

Save PDF