Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
BAE Manuals
Camera Accessories
OGi Series
Installation and operating instructions manual
BAE OGi Series Installation And Operating Instructions Manual
Stationary bae batteries: vented lead acid (vla) / flooded
Hide thumbs
1
2
3
Table Of Contents
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
page
of
18
Go
/
18
Contents
Table of Contents
Bookmarks
Table of Contents
Introduction
Electrical Hazards
Electrolyte Hazards
Explosive Gases
1 Safety Precautions & Warnings
Table of Contents
Concealed Damage
2 Receiving of Stationary Batteries
Visible External Damage
Accessories
3 Storage and Maintenance
Storage and Maintenance: Batteries Removed from Operation
Storage and Maintenance: Wet Charged Batteries
Accessories
4 Unpacking-Handling
5 Pre-Installation Planning
6 Battery Cell/Jar Installation
Racks (Existing Rack)
Racks (New Rack)
Inter-Cell Connectors
Terminal Preparation
Final Installation Steps
Terminal Plates
7 Commissioning - Supplied Wet and Charged
Commissioning with Float Charge Voltage - 2.23 Vpc
Commissioning with Higher Charging Voltages - 2.33 to 2.40 Vpc
Equalization Charging
Float Charging
8 Instructions for Operation
Charging Currents
Discharge Cycle
Operating Temperature
Temperature-Related Charging Voltage
Addition of Water
9 Battery Maintenance
Cleaning of Batteries
Recharging Cycle
10 Periodic Inspections
Total System Voltage and Current
Cell Temperature
Individual Cell Voltages
Advertisement
Quick Links
1
Introduction
2
Battery Cell/Jar Installation
3
Inter-Cell Connectors
4
Commissioning - Supplied Wet and Charged
5
Equalization Charging
6
Commissioning with Float Charge Voltage - 2.23 Vpc
7
Total System Voltage and Current
Download this manual
STATIONARY BAE BATTERIES:
Vented Lead Acid (VLA) / Flooded
Installation and Operating Instructions
OPzS & OGi Series Batteries
Important Documents - Do Not Discard
Table of
Contents
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Table of Contents
Need help?
Do you have a question about the OGi Series and is the answer not in the manual?
Ask a question
Questions and answers
Related Manuals for BAE OGi Series
Camera Accessories BAE OPzS Operating Instructions
Stationary vented lead acid batteries (3 pages)
Camera Accessories BAE OPzS Series Installation And Operating Instructions Manual
Stationary bae batteries: vented lead acid (vla) / flooded (18 pages)
Camera Accessories BAE OPzV Series Installation And Operating Instructions Manual
Stationary bae batteries: valve regulated lead acid (vrla) (17 pages)
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the OGi Series and is the answer not in the manual?
Questions and answers