Advertisement

I
n
s
t
a
l
l
a
t
i
o
n
I
n
s
t
a
l
l
a
t
i
o
I
n
s
t
a
l
l
a
t
i
o
R
O
-
C
R
O
-
C
R
O
-
C
a
n
d
u
s
e
r
n
a
n
d
u
s
e
r
n
a
n
d
u
s
e
o
m
p
a
c
t
s
o
m
p
a
c
t
s
o
m
p
a
c
t
s
m
a
n
u
a
l
m
a
n
u
a
l
r
m
a
n
u
a
l
e
r
i
e
s
e
r
i
e
s
e
r
i
e
s

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RO-Compact1 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Location Requirements
Floor Drain and Environment
Must have open floor drain; install in frost-free, even horizontal location.
Surface Capacity and Space
Ensure surface supports unit weight (76-138kg) and allow clearance for servicing/ventilation.
Plumbing Requirements
Regulations and Supply
Comply with regulations; connect to cold water (max 25°C) with valve/meter.
Water Specifications and Filter
Max hardness 10-25°dh, min 1/2" inlet hose; install/clean 3/4" inlet filter.
Water Quality Parameters
Raw Water Standards
Raw water must be drinking quality with max 1000 mg/l TDS (as CaCO3).
Chemical Substance Limits
Specifies limits for chemical substances: Fe, Mg, Chlorine, NTU, SDI, Temp, KMnO4.
Water Analysis Recommendation
Perform water analysis if chemical substances are in doubt.
Electrical Wiring and Safety
Connection Regulations and Power
Adhere to local regulations; operating voltage 230V/50Hz, fuse 10/16A.
Cable Wire Colour Codes
Wiring colours: blue (0), brown (Live), yellow/green (Earth).
Connecting the RO-unit
Feed, Outlet, and Drain Connections
Connect feed/outlet (3/4"), drain (10mm) to application/drain, avoid kinks.
Material and Usage Requirements
Use food-safe, corrosion-resistant tubing; min user application usage 1 l/m.
Start-up and Operation
Pre-Start Checks
Verify plumbing/wiring, open valve, check connections, insert plug.
Initial Power-On and Venting
Switch on; observe display, pump activation, and perform venting.
Operational Monitoring
Monitor permeate output, check auto-shutdown/restart, and membrane flush.

Table of Contents