Table of Contents

Advertisement

Operation Manual
HDG Euro 30/40/45/50
hdg-bavaria.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Euro 40 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Notes on this manual
Introduction to the Operation Manual
Introduces the operation manual and its purpose for the HDG Euro boiler.
Structure of the Operating Manual
Explains the organization and chapter layout of the operation manual.
Glossary of Terms
Defines key technical terms used throughout the operation manual.
Safety Notes
Intended Use of the Heating System
Details correct and incorrect usage of the heating system for safe operation.
Residual Risks Identification
Highlights potential hazards like hot surfaces, carbon monoxide, and fire.
Warnings and Safety Symbols
Explains the meaning of various warning symbols and signals for hazard awareness.
Operator's Duty of Information
Outlines the operator's responsibility to read and understand safety information.
Mode of Operation
System Overview
Presents a general overview with diagrams of the HDG Euro boiler components.
Functional Description of the System
Explains the operational principles of the boiler and its integrated control system.
Technical Data
Provides detailed technical specifications for the HDG Euro boiler models.
Fuel Quality Requirements
Details the necessary fuel types, lengths, diameters, and moisture content.
Planning and Installation
Boiler Dimensions
Provides detailed physical measurements and diagrams for installation planning.
Structural Requirements
Outlines installation environment, clearances, and building regulations.
System Connections
Details connections for chimney, electrical, and water systems.
Hydraulic Connection
Describes requirements for connecting the hydraulic system based on schematics.
Scope of Delivery
Lists the components included with the heating system delivery.
Installing the Heating System
Step-by-step guide for installing the boiler and its main components.
Connecting the Chimney
Instructions for correctly attaching the boiler to the chimney.
Electrical System Connection
Details standards and procedures for electrical connections.
Water System Management
Procedures for filling the system with water and managing air pockets.
Connecting the Thermal Safety Device
Explains the installation and requirements for the thermal safety device (TAS).
Commissioning the System
Commissioning Requirements
Lists the essential prerequisites before initiating system commissioning.
Commissioning Procedure
Details the steps for system startup, component testing, and initial settings.
Using the Heating System
HDG Control Unit Operation
Information on operating the HDG Control Touch unit for system management.
Switching On the Heating System
Instructions for powering on the heating system via circuit breaker or switch.
Heating Up the System
Guides on safely starting the system and achieving initial heat.
Performing a Chimney Sweep Test
Details legal requirements and procedures for annual chimney sweep tests.
Switching Off for Repair Work
Steps to safely shut down the system for maintenance or repairs.
Troubleshooting Guide
References the HDG Control manual for fault finding and solutions.
Cleaning and Servicing the Heating System
Cleaning and Servicing Schedule
Provides a schedule of recommended cleaning and maintenance tasks and intervals.
Cleaning and Servicing Procedures
Contains general safety instructions and detailed procedures for cleaning tasks.
Notes on Dismantling and Disposal
Dismantling Instructions
Instructions for safely disassembling the heating system by qualified personnel.
Disposal Guidelines
Guidance on recycling components and proper disposal of waste materials.

Table of Contents