Fraco SEP-6000 User Manual

Fraco SEP-6000 User Manual

Transport platform sep series
Table of Contents

Advertisement

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SEP-6000 and is the answer not in the manual?

Questions and answers

Summary of Contents for Fraco SEP-6000

  • Page 2: Table Of Contents

    Transport platform SEP Serie Table of content Foreword ................................5 1.1. Revision table ..............................5 1.2. Documents and applicable standards ......................5 1.3. Manual Content .............................. 6 1.3.1. What does this manual contain? ......................6 1.3.2. Who must consult this manual? ......................6 1.3.3.
  • Page 3 Transport platform SEP Serie 4.11. Documentation compartment ........................33 Installation data ..............................34 5.1. Types of bases ............................. 34 5.1.1. Base with adjustable jack legs: ......................34 5.2. Foundation requirements ..........................34 5.3. Local loads ..............................35 5.3.1. Local loads for mast section 26" x 26" (0,65 m x 0,65 m) ..............35 5.4.
  • Page 4 Transport platform SEP Serie 8.5. Status light indicators repair guide ........................ 64 8.5.1. Green light indicator (sécurité cabine/cabin safety) ................65 8.5.2. Green light indicator (Sécurité au sol/ground safety) ................65 8.5.3. Green light indicator (Porte cabine/cabin door) ................... 66 Periodic maintenance ............................
  • Page 5: Foreword

    Transport platform SEP Serie 1. Foreword 1.1. Revision table Revision N° Description Date (yyyy-mm-dd) First issue 2017-09-29 Revision for first installation and test 2017-11-08 Revision after first installation and test 2017-12-12 1.2. Documents and applicable standards • CSA B354.12-17 - Design, calculations, safety requirements, and test methodology for mast climbing transport platforms (MCTPs) •...
  • Page 6: Manual Content

    (RD-7243-MA-002) delivered with the machine. • This manual is not a repair guide! You will not find any instructions concerning repair work in this manual. If needed, consult the FRACO technical department. 1.3.4. To consider for resale In case of resale of the platform, it is very important to transmit all original documentation to the buyer;...
  • Page 7: Safety

    Not conforming to these safety instructions may general material damages, severe wounds and even death. FRACO and/or its representative can in no case be held responsible. All local norms and regulations applicable concerning safety and prevention of...
  • Page 8: Table 1 - Symbols And Annotations

    STARTING ON PAGE If, after consulting the present manual, you have any doubts concerning the assembly, disassembly, operation or maintenance of the platform, contact your FRACO representative. • Consequences of violation of safety instructions; violation of safety instructions may put staff, environment and machine in danger.
  • Page 9: Residual Risks

    Transport platform SEP Serie 2.2. Residual risks Despite all taken precautions, residual risks remain such as: • Wounds from uncoordinated tasks • Malfunction of a control system • Work with an electric system • Damage to the transport equipment • Fall of inappropriately secured objects •...
  • Page 10: Operational And Transport Security

    Lower and stop the machine if winds exceed: > 35 mi/h (> 55 km/h). If winds exceeding >70 mi/h (> 117 km/h) are expected, secure unit to the ground. If in doubt, consult effective local regulation and/or your FRACO representative. •...
  • Page 11: Safety Instructions

    Transport platform SEP Serie 2.4. Safety instructions 2.4.1. Safety during assembly and disassembly • The machine must be installed and dismantled according to the installation manual and under the supervision of an authorised person specified by the contractor. ∞ S (RD-7243-MA-002).
  • Page 12: Intended Use And Fields Of Application

    Transport platform SEP Serie 3. Intended use and fields of application The machine is an elevating device for construction work, of platform type and intended for temporary use on construction sites, for the vertical transport of material and staff (13 persons MAXIMUM). Loading/unloading of material and staff is permitted at access levels installed and secured at set heights.
  • Page 13: Controls And Commands

    Follow local standards and regulations in effect. • Make the necessary verifications before the work shift and make the periodic verifications. • In case of malfunction, stop and lower the unit to the ground. Contact your FRACO representative. SEP user’s manual Page 13 of 89...
  • Page 14: Technical Data

    Transport platform SEP Serie 4. Technical data 4.1. General data FRACO GENERAL DATA - SEP Technical Nominal speed (vertical travel) 0-40 ft/min (0-12,2 m/min) Speed governor activation speed (centrifugal 85 ft/min (26 m/min) brake) MAXIMUM number of persons on the platform...
  • Page 15: Model Specific Data

    Transport platform SEP Serie 4.2. Model specific data MODEL type SEP-5000 SEP-6000 SEP-7000 SEP-8000 Capacity Load capacity 5 000 lb 6 000 lb 7 000 lb 8 000 lb (2 270 kg) (2 720 kg) (3 175 kg) (3 630 kg)
  • Page 16: Technical Configurations

    (13090104) Figure 1 – mono-mast, single unit N° Item Description RD-7243-AT-100 Cable guide RD-7243-BC-104 Platform right SEP-5000 RD-7243-BE-107 Ground cabinet GC1 SEP Ground enclosure – single mast RD-7243-GS-112 RD-7243-ME-100 Electric cable barrel SEP 13090104 Mast section 26" x 26" x 5'-0", 1 rack (Mast climber)
  • Page 17: Overview, Double-Mast - Twin Units

    Double mast section (13090137) Figure 2 – Double-mast assembly, twin units N° Item Description RD-7243-AT-100 Cable guide RD-7243-BC-103 Platform left SEP-5000 RD-7243-BC-104 Platform right SEP-5000 RD-7243-BE-107 Ground cabinet GC1 SEP Ground enclosure – twin mast RD-7243-GS-113 RD-7243-ME-100 Electric cable barrel SEP 13090137 Mast section 26"...
  • Page 18: General Dimensions

    Transport platform SEP Serie 4.5. General dimensions *** L Figure 3 – General dimensions SEP user’s manual Page 18 of 89 Doc no. RD-7243-MA-001-02...
  • Page 19: Figure 4 - General Dimensions

    Transport platform SEP Serie Ŧ during installation ŦŦ in operation Figure 4 – General dimensions SEP user’s manual Page 19 of 89 Doc no. RD-7243-MA-001-02...
  • Page 20: Table 7 - General Dimensions

    Transport platform SEP Serie Description Values MAXIMUM height of first (1) 20’-0” (6,0 m) mast anchor 2 – G MAXIMUM height of second « R EFER TO ABLE ENERAL DATA YPICAL SPACING BETWEEN ANCHORS (2) mast anchor 14 » PAGE 2 –...
  • Page 21: Platfom Components

    Transport platform SEP Serie 4.6. Platfom components 1. Main control pannel (CC1) 2. Operator control box (CC2) 3. Motor unit (drive motor) 4. End of rack detector, inductive detector 5. Emergency brake system 6. Cable guide 7. Limit switches (top, bottom, final and position) 8.
  • Page 22: Configurations

    Transport platform SEP Serie 4.7. Configurations Upon purchase, it is possible to select platform dimensions from various possibilities. The standard configurations are: 10'-6" (3,20m) • 10'-6" (3,20m) Interior dimension • 12'-6" (3,80m) • 14'-6" (4,40m) It is also possible to get other platform lengths by combining different platform extensions among the available extension formats: •...
  • Page 23: Regulatory Attachment Points

    Transport platform SEP Serie 4.8. Regulatory attachment points Important! Wear a safety harness at all times when assembling or demantling mast sections or mast ties. Workers exposed to fall risks must wear a safety harness certified according to local standards in effect.
  • Page 24: Accessories

    Transport platform SEP Serie 4.9. Accessories 4.9.1. Protection roof and access trap (optional) The protection roof is available (optional) and may be necessary according to local regulation ). The protection roof is designed to protect worker from the fall of SEE EFFECTIVE LOCAL REGULATION objects at height and is installed on the guardrail of the plateform.
  • Page 25: Figure 9 - Roof Installation, Side Extensions

    Transport platform SEP Serie Step 2. Install the roof protection structures left and right (RD-7243-ST-112) on each side of the central roof segement. Slide the roof support posts in front of and in the protection panels on the side of the motor unit. Bolt into place. Figure 9 –...
  • Page 26: Figure 10 - Roof Installation, Finish Metal Sheet

    Transport platform SEP Serie Step 3. Install the finish metal sheets on the side of the motor unit. Figure 10 – Roof installation, finish metal sheet N° Item Description RD-7243-BC-106 Motor pannel assembly SEP RD-7243-ST-337 Folded flat 0.075" x 4.025" x 4.500" x 14.000" LOZ-5010 Lock washer 1/4"...
  • Page 27: Auto-Lubrication Device (Optional)

    Transport platform SEP Serie 4.9.2. Auto-lubrication device (optional) It is possible to get a rack auto-lubrication device. The system and its tank are installed behind the centrifugal brake (safety device) pannel. To learn more about tank refill and rack lubricating periods, please refer to the periodic maintenance section of the present manual.
  • Page 28: Ground Protection Mesh (Optional)

    Transport platform SEP Serie 4.9.3. Ground protection mesh (optional) The ground protection mesh is mandatory in all cases, except if the platform is equipped with a impact detection system under the plateform deemed sufficient additional protection according to effective local laws and regulations (optional system not offered by the manufacturer).
  • Page 29: Self-Erecting Device (Optional)

    Transport platform SEP Serie 4.9.4. Self-erecting device (optional) The self erecting device is installed in the support intended for that purpose on the frame of the motor unit. Suspend a hoisting winch able to lift a 300 lbs (135 kg) mast section and move the structure by pivoting the self-erecting jib.
  • Page 30: Hoisting Chains (Optional)

    Transport platform SEP Serie 4.9.5. Hoisting chains (optional) As explained in , it is possible de rise/move the platform with SECTION RANSPORT FROM PAGE hoisting chains attached to the four (4) hoisting points present on the unit. The chains must respect the dimensions indicated in section 6 and must be able to support the the unloaded platform, 6,500 lbs (2 950 kg).
  • Page 31: Data Plates And Stickers

    Transport platform SEP Serie 4.10. Data plates and stickers Always make sure that all data plates and stickers are clean, legible and in good condition. If the plates and/or stickers are missing, damages or illegible, it is important to replace them without delay.
  • Page 32: Stickers

    Sticker "Control box CC1 SEP" eng./fren. RD-7243-CO-206 Sticker "Control pannel box CC2 SEP" eng./fren. RD-7243-CO-207 Aluminum plate " Capacity + number of person " SEP-5000 eng./fren. 30070235 Aluminium plate "Load evenly" SEH french 30070280 Sticker "Emergency opening roof acces door" french/eng.
  • Page 33: Documentation Compartment

    Transport platform SEP Serie 4.11. Documentation compartment Documentation is stored in the waterproof tool box located under the main control panel (CC1). Make sur to always have all necessary documentation at your disposition in the appropriate location. If a document is missing, damaged or illegible, it is important to have it remplaced. Waterproof tool box N°...
  • Page 34: Installation Data

    Transport platform SEP Serie 5. Installation data Warning! This section of the document is not an installation guide but a simple list of reminders, recommandations and requirements to respect, relative to the assembly/disassembly of the machine. Detailed explanations of assembly/disassembly are available in the installation manual (RD-7243-MA-002).
  • Page 35: Local Loads

    Transport platform SEP Serie 5.3. Local loads The following tables detail the local loads to the ground distributed directly beneath the ground base. For the base with the ajustable jack legs, consider ¼ of thes values per foot of jack. 5.3.1.
  • Page 36: Anchoring And Distribution

    ENERAL DATA ON PAGE IMPORTANT Always refer to the engineering quote to get the anchoring loads specific to the structure. SEP-5000 Load capacitiy = MAX. 5,000 lb (2 270 kg) Geometry Mast anchor forces Important! These values are available in the engineering package specific to each project.
  • Page 37: Electrical Connection (On Site)

    The manufacturer is not responsible for providing those equipments but may nevertheless give advice in their selection. If needed, please contact your FRACO representative. The power box provided by the contractor must be equipped with a disconnection switch and fuses installed according to the provided instructions.
  • Page 38: Transport

    Transport platform SEP Serie 6. Transport The platform must be transported by experimented and competent persons. 6.1. Inspection upon delivery • Inspect the shipment for any transport related damages and to validate that all necessary pieces were shipped with your order. •...
  • Page 39: Lifting With A Crane

    Transport platform SEP Serie 6.2.2. Lifting with a crane • The crane hook must be attached to four (4) chains, tied to the four (4) lifting rings. The chains may be purchased and provided with the machine. • If present, open the roof access trap to allow passage of the lifting chains.
  • Page 40: Operation

    • The operator must always make sure to respect load distributions and the maximum number of persons on the platform. Refer to capacity plates on the platform. For distribution with a greater number of workers, contact FRACO engineering services. ∞ S 2 –...
  • Page 41: Operation Safety Instructions

    Transport platform SEP Serie 7.2. Operation safety instructions The platform may only be used by a competent person designated by the contractor. This person must be familiar with the instructions, have sufficient experience and be informed of inherent risks related to the use of the platform.
  • Page 42: Platform Loading And Unloading

    Transport platform SEP Serie 7.5. Platform loading and unloading • A protection against falls must be provided at loading points of falling height of 10'-0" (3,0 m) and more (see local regulation) to prevent persons from falling. (Assemble the landing doors at access levels/floors).
  • Page 43: Controls

    Transport platform SEP Serie 7.7. Controls 7.7.1. Main control panel (CC1) Figure 24 – Main control panel (CC1) N° Description Platform disconnect switch (480V) Green indicator light (platform safety) Green indicator light (ground safety) Green indicator light (platform door) EMERCENCYSTOP button Light ON / OFF switch Drop test remote control connection socket Bypass port (security line bypass)
  • Page 44: Operator Control Box (Cc2)

    Transport platform SEP Serie 7.7.2. Operator control box (CC2) N° Description EMERGENCY STOP button White light button HAUT / UP White light button BAS / DOWN Blue light button PROCHAIN ÉTAGE – ARRÊT / NEXT FLOOR - STOP Yellow light button DÉBARRER PORTE / UNLOCK DOOR The control box may be installed on the left or on the...
  • Page 45: Ground Box Power Supply (Gc1)

    Transport platform SEP Serie 7.7.3. Ground box power supply (GC1) Figure 26 – Ground box power supply (GC1) N° Description Power supply connector EMERGENCY STOP button Green indicator light (ground safety) Ground box main disconnect switch SEP user’s manual Page 45 of 89 Doc no.
  • Page 46: Drop Test Remote Control

    Transport platform SEP Serie 7.7.4. Drop test remote control ∞ 10.1 D SEE SECTION ROP TEST PROCEDURE ON PAGE Figure 27 – Drop test remote control N° Description Three (3) position selector (DESCEND / ARRÊT / MONTER) Drop test button Black button (ACTIVÉ...
  • Page 47: Operation And Using The Machine

    Transport platform SEP Serie 7.8. Operation and using the machine 7.8.1. Before operating the plateform • Check that the main disconnector switches (480V) are on "ON/MARCHE" position on the (CC1) and (GC1) boxes. • Make sur the EMERGENCY STOP buttons are not pressed. ∞...
  • Page 48: Descend

    Transport platform SEP Serie 7.8.3. Descend On the (CC2) control box. ∞ R 7.7.2 O (CC2), EFER TO SECTION PERATOR CONTROL BOX ON PAGE • The white "BAS/DOWN" button must be lit for the command to be available. If the machine is at ground level, the button cannot be lit.
  • Page 49: Interruption And/Or End Of Work

    Transport platform SEP Serie 7.8.4. Interruption and/or end of work • Lower the platform to the loading dock and unload it of all material. ∞ R 7.8.3 D EFER TO SECTION ESCEND ON PAGE • Turn the key switch of the (CC1) panel to the "ARRÊT/OFF" position. •...
  • Page 50: Opening The Doors

    Transport platform SEP Serie 7.9. Opening the doors 7.9.1. Opening the ground protection mesh door Important! It is impossible to open the ground protection mesh door if the following two (2) conditions are not fulfilled: 1. The platform must be lowered to the ground, activation of next floor limit switches detectors BAS/LOW (LS6) and HAUT/HIGH (LS5) and stopped.
  • Page 51: Opening The Tailgate

    Transport platform SEP Serie 7.9.2. Opening the tailgate The platform is equipped with two (2) tailgates and (1) installation tailgate platform for the mast anchors (depend on model and installation): Unloading tailgate (same side as the wall) Installation tailgate platform Loading tailgate (same side as the wall) (side opposite the wall)
  • Page 52: Figure 31 - Tailgate Loading Side

    Transport platform SEP Serie Tailgate loading side: When the machine is lowered to ground level, there is activation of the next floor limit switch detectors HAUT/HIGH (LS5) et BAS/LOW (LS6)). The machine stops and that automatically locks the loading tailgate. ∞...
  • Page 53: Figure 32 - Tailgate Unloading Side

    Transport platform SEP Serie Tailgate unloading side: When the machine stops at a loading level (in front of a landing door), there is activation of the next floor limit switch detectors HAUT/HIGH (LS5) et BAS/LOW (LS6)). The machine stops and that automatically locks the loading tailgate.
  • Page 54 Transport platform SEP Serie Locking the tailgate (loading and unloading side): Because the tailgate (loading for ground level and unloading for levels with landing doors) unlocks automatically when reaching levels/floors, it is impossible to move the platform as long as a door is unlocked.
  • Page 55: Figure 33 - Finish Panel For The Installation Tailgate Platfom

    Transport platform SEP Serie Installation tailgate platform: The installation tailgate platform can be installed at the left of the right of the motor unit, depending on the model. 1. Remove the finish panel over the tailgate. (VIS-7105) (LOZ-8501) Finition panel (WAI-8501) Figure 33 –...
  • Page 56: Landing Door Opening

    Transport platform SEP Serie 7.9.3. Landing door opening Landing door must be positionned at loading and unloading levels for any landing required while using the platform. When in use, landing doors must conform to the following: • Doors must be entirely closed to enable any movement of the platform. •...
  • Page 57: Limit Switches (Level Detector)

    Transport platform SEP Serie 7.10. Limit switches (level detector) Level detector is supported by the limit switch system and detectors. For more information on the installation of the detectors, refer to the (RD-7243-MA-002). INSTALLATION MANUAL Limit switch Limit switch stop DOWN Limit switch Fin de course stop DOWN...
  • Page 58: Overload Detector (Optional)

    Transport platform SEP Serie 7.11. Overload detector (optional) The manufacturer proposes to equipe (optionally) the platform with an overload detection system. This device calculates load locally. The detector is programmed to stop the unit and prevent operation of the platform when the permitted maximum load is exceeded. To correct the issue, unload the platform of any excess load.
  • Page 59: Emergency Descent Procedure

    Transport platform SEP Serie 7.13. Emergency descent procedure In the case of a system defect preventing operation of the platform, proceed to a manual emergency descent. Follow the following instructions: • Connect the emergency descent levers in the threaded holes of the engine brakes (2). •...
  • Page 60: Centrifugal Emergency Brake Activation

    ON PAGE The emergency centrifugal brake has a three (3) year lifespan and must be replaced by the manufacturer or one of his certified representatives. Contact your FRACO representative for more information. See replacement date on the data plate. Centrifugal brake data plate SEP user’s manual...
  • Page 61: Using The Derivation Adaptor

    Transport platform SEP Serie 7.15. Using the derivation adaptor (RD-7243-BE-112) Figure 40 – Derivation adaptor Activation of the emergency centrifugal brake: EE PREVIOUS PAGE Travel end buffer: • If the platform exceeds the position of the "FINAL POSITION" travel end detector and triggers the buffer activation detector, this will turn off the safety line and will prevent any platform movement.
  • Page 62: Faults; Causes And Corrections

    Transport platform SEP Serie 8. Faults; causes and corrections Breakdowns can only be corrected by a qualified person! Before each reparation, lower the cabin and unload if possible! Turn off the main switch and unplug the machine before any intervention to the electrical system of the elevator.
  • Page 63: Cabin Was Raised Too High

    Transport platform SEP Serie 8.1. Cabin was raised too high The end travel detector " final switch" (LS15) of the platform may reach the "superior EXTREME" limit rail if: • The " stop UP" (LS5) travel end runner or detector is incorrectly adjusted. •...
  • Page 64: The Centrifugal Emergency Brake Was Triggered

    Transport platform SEP Serie 8.4. The centrifugal emergency brake was triggered The platform is equipped with a centrifugal emergency brake that brakes the descent of the platform if the platform moves too fast. Once the emergency brake is triggered, a signal relayed to the safety line cuts the power supply to the motor unit and triggers the engine brakes.
  • Page 65: Green Light Indicator (Sécurité Cabine/Cabin Safety)

    Transport platform SEP Serie 8.5.1. Green light indicator (sécurité cabine/cabin safety) The list of elements to check for the green indicator is givent on the "DÉPANNAGE/TROUBLESHOOTING" sticker located on the main control panel(CC1). 8.5.2. Green light indicator (Sécurité au sol/ground safety) The list of elements to check for the green indicator is givent on the "DÉPANNAGE/TROUBLESHOOTING"...
  • Page 66: Green Light Indicator (Porte Cabine/Cabin Door)

    Transport platform SEP Serie 8.5.3. Green light indicator (Porte cabine/cabin door) The list of elements to check for the green indicator is givent on the "DÉPANNAGE/TROUBLESHOOTING" sticker located on the main control panel(CC1). SEP user’s manual Page 66 of 89 Doc no.
  • Page 67: Periodic Maintenance

    Transport platform SEP Serie 9. Periodic maintenance Maintenance may only be performed by qualified persons. Please dispose of lubricants and spare parts in an environmentally responsible manner. Important! If work is needed under the platform, it is impossible to work under the platform unless the platform is completely blocked from any spontaneous descending movements.
  • Page 68: Daily Maintenance

    Transport platform SEP Serie 9.1. Daily maintenance • Platform; Clear the platform of excess dirt, debris and snow/ice. Clean the proximity detector and the end travel detecor. Make sure the data plates and stickers are present, legible and in good condition on the platform, protection mesh and anywhere required.
  • Page 69: Weekly Maintenance

    Transport platform SEP Serie 9.2. Weekly maintenance In addition to the daily inspection elements, consider the following elements: • Inspect the condition and integrity of the base components; the base, legs with adjustable jacks, the buffer. • If the platform in not equipped with an auto-lubrication device (optional), the rack must be manually lubricated.
  • Page 70: Monthly Maintenance

    Transport platform SEP Serie 9.3. Monthly maintenance • In addition to the daily and weekly inspection elements, consider the following elements: • Check that every bolt of the mast, individual mast sections and end of mast section, of the base, of the travel en detectors, of the floor runners, of the centrifugal emergency brake, of the mast attachments and building anchors are tightened and safe.
  • Page 71: Annual Maintenance

    • The emergency centrifugal brake must be replaced once every three (3) years. Refer to the data plate of the brake and contact your FRACO representative as needed. • Perform maintenance of the engine gearboxes once every three (3) years. Warning! Do not mix mineral and synthetic oils when filling the tank.
  • Page 72: Periodic Lubrification

    Transport platform SEP Serie 9.7. Periodic Lubrification Lubrification scheme Lubrification points Nb of points / unit Type of lubrification Application method Monthly (40 hours) Coating / pistol / (optional Rack Total length of the mast * Grease automatic lubricator) Centrifugal brake Grease Greasing pistol (Plateform int.)
  • Page 73: Rack Manual Lubrication

    Transport platform SEP Serie 9.8. Rack manual lubrication If the machine is not equipped with an auto-lubricating device, avaiable on option, the rack must be lubricated manually. It is advisable to be two (2) persons to proceed with lubrication, one person operating the platform and the other assuring continuous lubrication.
  • Page 74: Daily Inspection Grid

    Construction site Month /Year FRACO - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Operator is trained Operator has read the User’s manual...
  • Page 75: Procedures And Inspection

    Only a qualified technician holding a valid Level 1 (Safety and operator) training card may proceed with this test. • Important! This test must per performed once every three (3) years. Fill the register (Fraco SD2 Data on safety device use) of the safety device manual. Steps: 1.
  • Page 76 10. Reset the emergency brake system by following the reset procedure of the safety device manual (SD2). 11. Fill the register (Fraco SD2 Data on safety device use) of the safety device manual. 12. Disconnect the drop test remote control (2) previous page turn the "WORK / STOP / DROP"...
  • Page 77: Emergency Brake Reset

    Transport platform SEP Serie 10.1.1. Emergency brake reset Note : the emergency brake must be reset after each drop test. 1. Open the access to safety device reset mechanism lid using a 13 mm wrench. Also remove the two bolts locking the compression ring. Figure 46 –...
  • Page 78: Spare Parts

    (RD-7243-MA-003) EFER TO THE PARTS BOOK NOTE: Spare parts must meet the technical requirements of the manufacturer. Use only FRACO spare parts. Place an order with our customer service for maintenance and maintenance work: Addresses for sales and customer service according to your location:...
  • Page 79: Technical Data

    Note: Supplying the input current box and the main disconnect switch is responsibility of the contractor. The manufacturer is not responsible of supplying these equipments but can nevertheless advise in the selection of these equipments. If needed, contact your FRACO representative.
  • Page 80: Mast Section Technical Sheet

    Transport platform SEP Serie 12.3. Mast section technical sheet Figure 50 – Mast section dimensions Mast section 26" x 26" x 5'-0", 1 rack (13090104) Imperial Metric Length 28-5/8" 727 mm Width 29-7/8" 760 mm Height 5'-0" 1,5 m Weight 300 lb 136 kg Table 14 –...
  • Page 81: End Mast Section Technical Sheet

    Transport platform SEP Serie 12.4. End mast section technical sheet Figure 51 – End mast section dimensions End mast section 26" x 26" x 5'-0" without rack Imperial Metric (13090069) Length 28-5/8" 727 mm Width 29-7/8" 760 mm Height 5’-0" 1,5 m Weight 287 lb...
  • Page 82: Adjustable Ground Base Technical Sheet

    Transport platform SEP Serie 12.5. Adjustable ground base technical sheet Figure 52 – Adjustable ground base dimensions Figure 53 – Ground base dimensions with installation outriggers Ground base with mast 26" x 26" (14050011) Imperial Metric Length (base) 3’-1 1/2" 0,95 m Width (base) 2’-6 5/8"...
  • Page 83: Machine Disposal

    Transport platform SEP Serie 13. Machine disposal Correctly dismantle the equipment at the end of its lifespan and dispose according to effective local regulation. Respect the following guidelines when disposing of equipment parts/elements: • Drain oil/grease and dispose in an eco-friendly manner. •...
  • Page 84: Appendixes

    Transport platform SEP Serie Appendixes List of figures Figure 1 – mono-mast, single unit ............................ 16 Figure 2 – Double-mast assembly, twin units ........................17 Figure 3 – General dimensions ............................18 Figure 4 – General dimensions ............................19 Figure 5 – Platform components ............................21 Figure 6 –...
  • Page 85: List Of Tables

    Transport platform SEP Serie List of tables Table 1 - Symbols and annotations ............................ 8 Table 2 – General data ..............................14 Table 3 – Data depending on model ..........................15 Table 4 – Available options .............................. 15 Table 5 – Mono-mast assembly components, single unit ....................16 Table 6 - Double-mast assembly components, twin units ....................
  • Page 86: Periodic Inspection Forms

    Transport platform SEP Serie Periodic inspection forms Inspection conclusions Date and signature of person responsible Inspection conclusions Date and signature of person responsible SEP user’s manual Page 86 of 89 Doc no. RD-7243-MA-001-02...
  • Page 87 Transport platform SEP Serie Inspection conclusions Date and signature of person responsible Inspection conclusions Date and signature of person responsible SEP user’s manual Page 87 of 89 Doc no. RD-7243-MA-001-02...
  • Page 88 Transport platform SEP Serie Inspection conclusions Date and signature of person responsible Inspection conclusions Date and signature of person responsible SEP user’s manual Page 88 of 89 Doc no. RD-7243-MA-001-02...
  • Page 89 Transport platform SEP Serie Inspection conclusions Date and signature of person responsible Inspection conclusions Date and signature of person responsible SEP user’s manual Page 89 of 89 Doc no. RD-7243-MA-001-02...

Table of Contents