Daikin ARXS71L2V1B Installation Manual

Daikin ARXS71L2V1B Installation Manual

R410a split series
Table of Contents

Advertisement

Installation manual

R410A split series
RXS50K2V1B      
RXS60F4V1B      
RXG50K3V1B      
RX50G3V1B      
RX60G3V1B      
RXS50L2V1B      
RXS60L2V1B      
RX60G4V1B              
              
ARXS50G3V1B      
ARXS50L2V1B      
Installation manual
ARXS60L2V1B      
English
R410A split series
ARXS71L2V1B

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ARXS71L2V1B and is the answer not in the manual?

Questions and answers

Summarization of Contents

Document Information
Manual Overview and Documentation Set
Provides information about the manual, target audience, and related documentation.
Understanding Warnings and Symbols
Explains the meaning of various warning symbols used throughout the manual.
Safety Guidelines
Refrigerant Handling Safety
Covers precautions for refrigerant leaks, toxicity, and pump-down procedures.
Electrical Installation Safety
Addresses wiring, earthing, fuses, shock prevention, and earth leak detectors.
Unit Installation and Handling Safety
Includes installer qualifications, site requirements, unit handling, and compliance.
Installation Preparation
Outdoor Unit Accessory Removal
Instructions for removing accessories from the outdoor unit packaging.
Installation Site Requirements
Guidelines for selecting an appropriate installation site for the outdoor unit.
Site and Piping Preparation
Cold Climate Site Requirements
Specific requirements for installing the unit in cold weather conditions.
Refrigerant Piping Specifications
Details on material, diameter, and thickness for refrigerant piping.
Refrigerant Piping Insulation Guidelines
Guidance on insulating refrigerant piping to prevent condensation.
Outdoor Unit Installation Steps
Opening the Outdoor Unit
Step-by-step instructions for opening the outdoor unit.
Outdoor Unit Mounting Structure
Guidance on creating a stable structure for mounting the outdoor unit.
Installing the Outdoor Unit
Steps for physically installing the outdoor unit onto its structure.
Outdoor Unit Drainage Management
Instructions for ensuring proper drainage of condensation water.
Securing the Outdoor Unit
Measures to secure the outdoor unit against strong winds.
Refrigerant Piping Connection and Checks
Refrigerant Piping Connection Precautions
Safety warnings and precautions before connecting refrigerant pipes.
Refrigerant Piping Connection Guidelines
Best practices and procedures for connecting refrigerant pipes.
Refrigerant Pipe Bending Rules
Instructions on how to bend refrigerant pipes correctly.
Pipe End Flaring Procedure
Steps for flaring pipe ends to ensure a secure connection.
Stop Valve and Service Port Operations
Instructions for operating and securing stop valves and service ports.
Connecting Refrigerant Piping to Outdoor Unit
Steps to connect the refrigerant lines to the outdoor unit.
Refrigerant System Procedures
Refrigerant Leak Detection
Methods for detecting leaks in the refrigerant piping.
Refrigerant System Vacuum Drying
Procedure for removing moisture from the refrigerant system.
Calculating Additional Refrigerant Amount
Calculation method for determining the required refrigerant charge.
Refrigerant Charging Procedure
Instructions on how to charge the system with refrigerant.
Electrical Wiring and System Configuration
Fluorinated Greenhouse Gases Labeling
Guidance on filling and attaching the F-gas label.
Electrical Wiring Component Specifications
Details on required wiring components and their specifications.
Outdoor Unit Electrical Wiring Connection
Step-by-step instructions for wiring the outdoor unit.
Standby Mode Functionality
Explanation of the standby mode and how to enable it.
Facility Mode for Low Temperature Operation
Instructions for using the facility mode for specific cooling applications.
Finalizing Outdoor Unit Installation
Final steps to complete the outdoor unit installation.
Commissioning and Initial Operation
Commissioning Safety Precautions
Safety warnings and precautions before starting the commissioning process.
Pre-Commissioning Verification Checklist
A checklist of essential items to verify before commissioning.
System Test Run Procedure
Steps for conducting a test run to verify system operation.
Outdoor Unit Startup Procedure
Procedures for starting up the outdoor unit after installation.
Disposal and Environmental Procedures
Refrigerant Pump Down for Disposal
Instructions for pumping down refrigerant for disposal or relocation.
Technical Information
Wiring Diagram Symbol Legend
Explanation of symbols and components used in the wiring diagram.

Table of Contents