Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Handöl Manuals
Stove
52T
Installation instructions manual
Handöl 52T Installation Instructions Manual
Hide thumbs
1
2
Table Of Contents
3
4
5
6
7
8
9
10
11
12
13
14
15
16
page
of
16
Go
/
16
Contents
Table of Contents
Bookmarks
Advertisement
Table of Contents
1
Table of Contents
2
General
3
Technical Data
4
Installation Distance to Walls and Ceiling
5
Removing the Loose Components
6
Supply of Combustion Air
7
Adjusting and Connecting H51
8
Adjusting and Connecting H52/H52T
9
Adjusting and Connecting H53
10
Adjusting and Connecting H54/H54T
11
Connection to the Chimney
Download this manual
GB
Installation
INSTRUCTIONS
50
51 52 52T
53 54 54T
Table of
Contents
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Table of Contents
Need help?
Do you have a question about the 52T and is the answer not in the manual?
Ask a question
Questions and answers
Related Manuals for Handöl 52T
Stove Handöl 51 Installation Instructions Manual
(16 pages)
Stove Handöl 54 Installation Instructions Manual
(16 pages)
Stove Handöl 52 Installation Instructions Manual
(16 pages)
Stove Handöl 53 Installation Instructions Manual
(16 pages)
Stove Handöl 54T Installation Instructions Manual
(16 pages)
Summarization of Contents
EU Declaration of Conformity
General Information and Specifications
Technical Data
Technical specifications including output, efficiency, and model dimensions.
Building Application Requirements
Procedures for obtaining planning permission from local authorities before installation.
Structural Support and Hearth Plate
Guidance on floor support, hearth plate selection, and installation requirements.
Chimney Requirements
Specifications for chimney draft, length, and cross-section for optimal performance.
Installation Distances
Removing Loose Components
Fire Bars and Fire Box Surround
Instructions for removing, cleaning fire bars, and lifting the smoke baffle.
Stove Base Plate and Handle Adjustment
Stove Base Plate Removal
Steps to lift out the stove base plate after cladding has been removed.
Handle Conversion
Guide to convert the stove handle from fixed to removable.
Combustion Air Supply
Air Ducting and Knockout
Details on providing combustion air via ducting and model-specific knockouts.
Adjusting and Connecting (H51)
Rear Connection Preparation
Steps to prepare the stove for rear connection by swapping parts.
Stove Levelling
Procedure for positioning and levelling the stove using adjustable feet.
Adjusting and Connecting (H52 / H52T)
Rear Connection Preparation
Steps to prepare the stove for rear connection by swapping parts.
Stove Levelling
Procedure for positioning and levelling the stove using adjustable feet.
Soapstone Installation (52T)
Adjusting and Connecting (H53)
Rear Connection Preparation
Steps to prepare the stove for rear connection by swapping parts.
Stove Levelling
Procedure for positioning and levelling the stove using adjustable feet.
Adjusting and Connecting (H54 / H54T)
Rear Connection Prep (H54)
Steps for rear connection preparation specific to the H54 model.
Rear Connection Prep (H54T)
Steps for rear connection preparation specific to the H54T model.
Adjusting the Stove
Soapstone Installation (H54T)
Connecting to the Chimney
Top Flue Connection
Instructions for connecting the stove to a steel flue via the top outlet.
Masonry Chimney Connection
Guidelines for connecting the stove to a masonry chimney from the rear or top.
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the 52T and is the answer not in the manual?
Questions and answers