Gas-Side Maintenance; Finalizing Maintenance - A.O. Smith GWV - 120 Installation And Service Manual

A.o. smith gas water heater installation user and service manual
Table of Contents

Advertisement

15
15.4 Gas-side mainte-
nance
15.4.1
15.4.2
15.4.3
15.4.4
15.5 Finalizing mainte-
nance
92
Performing maintenance
Introduction
The following steps must be carried out on the gas side:
1.
Clean the burner(s)
2.
Clean the injector(s)
3.
Cleaning the aluminium strips
Clean the burner(s)
1. Dismantle first the yellow flexible gas hose, the manifold and then the
burner(s).
2. Remove all contamination present on the burner(s).
3. Fit the burner(s)
Clean the injector(s)
1. Dismantle the injector(s)
2. Remove all contamination present in the injector(s).
3. Fit the injector(s), then the manifold and then the flexible gas hose.
Cleaning the aluminium strips
1. Dismantle the flue gas outlet
2. Use a vacuum cleaner to clean the aluminium strips.
To finalize the maintenance carry out the following steps:
1. Fill the appliance
(5
"Filling").
2. Start the appliance
(9 "Starting and
3. Erase the message SERVICE REQUIRED. Do this by pressing once on
then once on
running").
.
Instruction manual GWV
s

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gwv-150Gwv-200Gwv-120

Table of Contents