Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Shark Manuals
Measuring Instruments
100
Installation & operation manual
Shark 100 Installation & Operation Manual
Miltifunction power & energy meters/transducers
Hide thumbs
1
2
3
4
5
6
7
8
Table Of Contents
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
page
of
194
Go
/
194
Contents
Table of Contents
Bookmarks
Table of Contents
Product Warranty
Use of Product for Protection
Statement of Calibration
Disclaimer
Table of Contents
1: Three-Phase Power Measurement
Three-Phase System Configurations
1: Wye Connection
2: Delta Connection
3: Blondel's Theorem and Three Phase Measurement
Power, Energy and Demand
Reactive Energy and Power Factor
Harmonic Distortion
Power Quality
2: Meter Overview and Specifications
Hardware Overview
1: Voltage and Current Inputs
2: Model Number Plus Option Numbers
Technology
4: Measured Values
5: Utility Peak Demand
Specifications
Compliance
Accuracy
3: Mechanical Installation
Introduction
ANSI Installation Steps
DIN Installation Steps
Shark® 100T Transducer Installation
4: Electrical Installation
Considerations When Installing Meters
CT Leads Terminated to Meter
CT Leads Pass through (no Meter Termination)
Quick Connect Crimp-On Terminations
Voltage and Power Supply Connections
Ground Connections
Voltage Fuses
Electrical Connection Diagrams
Extended Surge Protection for Substation Instrumentation
5: Communication Installation
2: RS485/KYZ Output Com 2 (485P Option)
1: Using the Unicom 2500
Electro Industries/Gaugetech Doc TOC
Configuring the Shark® 100 - INP10
1: Setting up the Host PC to Communicate with the Shark® 100 - INP10 Meter
1: Configuring the Host Pc's Ethernet Adapter through
Windows
2: Setting up the Shark® 100 - INP10 Meter for Ethernet Communication
1: Configuring the Shark® 100 - INP10 Meter's
2: Resetting the Ethernet Card (INP10)
Shark® 100B Meter Ethernet Configuration
6: Using the Shark® 100/50 Meter
Programming the Shark® 100/100B/50 Meter Using the Faceplate
1: Understanding Meter Face Elements
2: Understanding Meter Face Buttons
Using the Front Panel
1: Understanding Startup and Default Displays
2: Using the Main Menu
3: Using Reset Mode
4: Entering a Password
5: Using Configuration Mode
1: Configuring the Scroll Feature
2: Configuring CT Setting
Electro Industries/Gaugetech Doc TOC
3: Configuring PT Setting
4: Configuring Connection Setting
5: Configuring Communication Port Setting
6: Using Operating Mode
Understanding the % of Load Bar
Performing Watt-Hour Accuracy Testing (Verification)
Programming the Transducer or Meter Using Software
1: Accessing the Transducer/Meter in Default
2: Connecting to the Transducer/Meter through
TM Software
Irda Port (Com 1)
3: Device Profile Settings
Display Configuration
7: Using the Shark® 100B Meter
Introduction
1: about Bacnet
Shark® 100B Meter's Bacnet Objects
Configuring the Shark® 100B Meter
Using the Shark® 100B Meter's Web Interface
Using the Shark® 100B in a Bacnet Application
A: Shark® 100/50 Meter Navigation Maps
A.1: Introduction
A.2: Navigation Maps (Sheets 1 to 4)
B: Shark® 100 and 50 Meter Modbus Map
B.1: Introduction
B.2: Modbus Register Map Sections
B.3: Data Formats
B.4: Floating Point Values
B.5: Modbus Register Map
C: Shark® 100 Meter DNP Map
C.1: Introduction
C.2: DNP Mapping (DNP-1 to DNP-2
D: DNP 3.0 Protocol Assignments
D.1: DNP Implementation
D.2: Data Link Layer
D.3: Transport Layer
D.4: Application Layer
D.4.1: Object and Variation
D.4.1.1: Binary Output Status (Obj. 10, Var. 2
D.4.1.2: Control Relay Output Block (Obj. 12, Var. 1
D.4.1.3: 32-Bit Binary Counter Without Flag (Obj. 20, Var. 5
D.4.1.4: 16-Bit Analog Input Without Flag (Obj. 30, Var. 4
D.4.1.5: Class 0 Data (Obj. 60, Var. 1
D.4.1.6: Internal Indications (Obj. 80, Var. 1
E: Using the USB to Irda Adapter CAB6490
E.1: Introduction
E.2: Installation Procedures
Advertisement
Quick Links
1
1: Three-Phase Power Measurement
Download this manual
S h a r k
5 0
®
MUL T I F UNC T I O N
ME T E R
B AC NE T ME T E R
100/ 100T / 100B/ 50
1 0 0 T
®
MUL T I F UNC T I O N
T R ANS D UC E R
1 0 0 B
®
1 0 0
®
MUL T I F UNC T I O N
ME T E R
Table of
Contents
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Table of Contents
Need help?
Do you have a question about the 100 and is the answer not in the manual?
Ask a question
Questions and answers
Related Manuals for Shark 100
Measuring Instruments Shark 50 Installation & Operation Manual
Miltifunction power & energy meters/transducers (194 pages)
Measuring Instruments Shark 100B Quick Start Manual
(4 pages)
Measuring Instruments Shark 100BT Quick Start Manual
(4 pages)
Measuring Instruments Shark 200 Quick Start Manual
(9 pages)
Measuring Instruments Shark MP200 Installation & Operation Manual
Multi-point high-density multifunction power & energy meter (496 pages)
Measuring Instruments Shark 250 Quick Start Manual
Meter (8 pages)
Measuring Instruments Shark 200T Quick Start Manual
Multifunction power and energy meter (4 pages)
Summarization of Contents
Customer Support and Warranty Information
Customer Service Details
Provides contact information and operating hours for customer support.
Product Warranty Terms
Outlines the warranty period and conditions for the meter.
Operational Guidelines and Safety Precautions
Product Usage and Calibration
Covers product use, calibration statement, and disclaimer information.
Safety Warnings and Symbols
Highlights important safety warnings and symbols used in the manual.
Chapter 1: Three-Phase Power Measurement
System Configurations and Concepts
Explains Wye/Delta connections, power, energy, demand, and power factor.
Key Electrical Measurements
Differentiates and explains power, energy, demand, reactive power, and power factor.
Chapter 2: Meter Overview and Specifications
Hardware Features and Models
Details the physical components, models, V-Switch technology, and measured values.
Model Selection and Compliance
Guides users through selecting the correct model number and options.
Meter Measured Values and Specifications
Lists all measurable parameters and their technical specifications.
Compliance and Accuracy Standards
Details the regulatory compliance and accuracy standards met by the meters.
Chapter 3: Mechanical Installation
Mounting Methods and Procedures
Covers ANSI, DIN rail, and transducer mounting steps and considerations.
Shark® 100T Transducer Mounting
Specific guidance for mounting the Shark® 100T transducer.
Chapter 4: Electrical Installation
Safety and Wiring Considerations
Emphasizes safety, CT leads, voltage, power supply, and grounding connections.
Electrical Connection Diagrams
Visual guides for connecting the meter in various electrical configurations.
Chapter 5: Communication Installation
RS485 and Unicom 2500 Setup
Instructions for RS485 communication and using the Unicom 2500.
Shark® 100 Ethernet Configuration
Guides for setting up Ethernet communication for the Shark® 100.
Connecting via Communicator EXTTM Software
Detailed steps for establishing software connection to the meter.
Chapter 6: Using the Shark® 100/50 Meter
Front Panel Operation and Navigation
Guides on using the front panel buttons, menus, and modes for operation.
Meter Configuration and Settings
Covers using configuration mode, scroll feature, CT/PT settings, and ports.
Key Operational Features and Testing
Explains load bar display and accuracy testing procedures.
Software Programming and Device Profile
Instructions for connecting and configuring via software and device profile.
Chapter 7: Using the Shark® 100B Meter
BACnet Configuration and Web Interface
Guides for network setup, web interface access, and BACnet configuration.
BACnet Objects and Data Mapping
Lists and describes BACnet objects and their associated data.
Appendix A: Meter Navigation Maps
Front Panel Navigation Flowcharts
Visual maps for navigating meter menus, modes, and screens.
Reset and Configuration Navigation
Visual maps for navigating reset and configuration modes.
Appendix B: Modbus Register Maps
Modbus Register Details and Formats
Outlines register sections, data formats, and floating point values.
Appendix C: Shark® 100 Meter DNP Map
DNP Protocol Mapping Overview
Details DNP protocol structure and mapping for the Shark® 100 meter.
Appendix D: DNP 3.0 Protocol Assignments
DNP Layers and Object Definitions
Covers DNP layers, function codes, objects, and variations for the meter.
Appendix E: USB to IrDA Adapter Installation
Adapter Installation Guide
Step-by-step instructions for installing the USB to IrDA Adapter and its driver.
Table of Contents
Save PDF
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the 100 and is the answer not in the manual?
Questions and answers