CAUTION! Installation of the Shark® 200 meter must be performed only by qualified personnel who fol-
low standard safety precautions during all procedures. Those personnel should have appropriate training
and experience with high voltage devices. Appropriate safety gloves, safety glasses and protective cloth-
ing are recommended.
During normal operation of the Shark® meter, dangerous voltages flow through many parts of the unit, includ-
ing: Terminals and any connected CTs (Current Transformers) and PTs (Potential Transformers), all I/O Modules
and their circuits. All Primary and Secondary circuits can, at times, produce lethal voltages and currents. Avoid
contact with any current-carrying surfaces.
Do not use the meter or any I/O device for primary protection or in an energy-limiting capacity. The meter can
only be used as secondary protection.
IMPORTANT! Refer to your meter's Installation and Operation Manual for additional safety warnings before
performing installation, wiring, or maintenance of your meter. See the link to the manual, below.
NOTE: This Quickstart Guide gives basic installation, wiring, and programming instructions.For additional meter oper-
ation and programming information, refer to your meter's Installation and Operation Manual and the Communicator
PQA
, MeterManagerPQA
TM
User Manual:
https://www.electroind.com/products/shark-200-power-and-energy-meter/
From the webpage, click Technical Documents>User Manual.
Software Manual:
https://www.electroind.com/products/communicatorpqa-power-monitoring-software/
From the webpage, click Technical Documents>User Manual.
CommunicatorPQA
TM
https://www.electroind.com/products/communicatorpqa-power-monitoring-software/
From the webpage, click Download ComPQA Pro. To get a Professional license for the software, email sales@elec-
troind.com or call 516-334-0870.
All EIG's metering and software products' literature can be accessed from:
https://www.electroind.com/power-metering-products/
For software and metering integration, EIG's Technical Support Engineers are available on an hourly or daily basis to
help with typical commissioning assistance, which includes:
Verifying meter installation and wiring.
Verifying proper system integration.
Working with 3rd parties to ensure cross compatibility.
Advising users on best practices for optimal implementation.
You can reach Technical Support from 8 a.m. to 8 p.m. EST, Monday-Friday, at 516-334-0870.
Shark® 200 Meter Quickstart Guide
, and EnergyPQA.com
TM
Setup Software:
Software User Manual on EIG's website:
TM
#
Doc
E149703
Shark® 200 Meter Quickstart
V.1.11
QS - 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 200 and is the answer not in the manual?

Questions and answers

Summary of Contents for Shark 200

  • Page 1 Shark® 200 Meter Quickstart Shark® 200 Meter Quickstart Guide CAUTION! Installation of the Shark® 200 meter must be performed only by qualified personnel who fol- low standard safety precautions during all procedures. Those personnel should have appropriate training and experience with high voltage devices. Appropriate safety gloves, safety glasses and protective cloth- ing are recommended.
  • Page 2 3 phase, 4 wire Delta direct, 3 Delta with PTs, 3 phase, 3 wire phase, 3 wire NOTE: Other wiring configurations are available. See the Shark 200 meter User Manual (see page QS- 1 for the download link). E149703 V.1.11 QS - 2...
  • Page 3 Shark® 200 Meter Quickstart Program Settings Using the Faceplate Buttons: (MENU, ENTER, DOWN ARROW, RIGHT ARROW) See the figure on the right for the location of the faceplate buttons. Access Configuration Mode: 1.Push the MENU button - you will see the display on the right;...
  • Page 4 200 meter’s Ethernet communication settings are the default settings of ® Address 1, Baud Rate 57.6 and Protocol Mod rtU. See the Shark® 200/200T Meter Installation and Operation Manual (see page QS-1 for the download link) for additional configuration instructions for the Shark 200 meter’s Ethernet port...
  • Page 5 345000/69 Volts: set the Pt-n value as 0345, Pt-d value as 69, Pt-S value as 1000. For additional programming instructions for the faceplate buttons, see Chapter 6 in the Shark® 200/ 200T Meter Installation and Operation Manual. Connect to the Meter through the RS485 Port: The Shark®...
  • Page 6 Shark® 200 Meter Quickstart Follow these steps to connect to the meter via RS485: 1. Connect the meter to the PC, using an RS485 cable. EIG offers a RS485 to USB connector, which can be ordered from EIG’s website: https://www.electroind.com/product/rs485-to-usb-communication- -converter/.
  • Page 7 Shark® 200 Meter Quickstart Program CT, PT Ratios 1. This is the first Device Profile screen. To return to this screen from another set- tings screen, click General Settings>CT, PT Ratios and System Hookup. 2. These are the settings: a. CT Numerator (enter value you want),...
  • Page 8 The meter will reboot and then you can reconnect to it. Note that you can also click Save Profile to save your changes without sending them to the meter. Shark® is a registered trademark of Electro Industries/GaugeTech. CommunicatorPQA , MeterManagerPQA , and Ener- gyPQA.com...

Table of Contents