Tadiran Telecom TAD-HV2.56 EU Operation Manual

Advertisement

Quick Links

Tadiran TAD-HV2.56 EU
Operation manual
Stackable
Easy to install
Single phase/three phase available
Emergency backup power
Cost effective

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TAD-HV2.56 EU and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Tadiran Telecom TAD-HV2.56 EU

  • Page 1 Tadiran TAD-HV2.56 EU Operation manual Stackable Easy to install Single phase/three phase available Emergency backup power Cost effective...
  • Page 3 Foreword Thank you for choosing the products of MARS UNION LLC. In order to ensure your legal rights and interests and use this product safely and correctly, please read the user manual carefully before installation and use. Disclaimer · This user manual contains a series of contents such as installation, operation methods, common troubleshooting and technical indicators.
  • Page 4: Table Of Contents

    Contents 1. Safety...................... 4 2. Product introduction................5 2.1 Product introduction..................2.2 Explanation of Symbols..................2.3 Introduction....................... 2.4 Introduction to BMC................... 2.5 Introduction to RBS.................... 2.6 Technical Data....................3. Product storage and packaging............... 9 3.1 Product storage environment................3.2 Product packaging information................4.
  • Page 5: Safety

    Safety DANGER! · The battery system is a high voltage system, please turn off the power before operating the equipment in the system so as to avoid danger! · Wiring work must be carried out by qualified electrical engineers, otherwise there is a risk of electric shock or damage to the system! ·...
  • Page 6: Product Introduction

    2.1Product Introduction · This document describes the product introduction, application scenarios, installation, commissioning, and maintenance of the Tadiran TAD-HV2.56 EU high voltage energy storage battery system (battery system for short). · The energy storage battery system is mainly composed of the control box and the battery Pack.
  • Page 7: Introduction

    2.3 Introduction Control BOX Battery Pack Floor-mounted Base Threaded Leveling Legs NOTICE! · Up to 8 batteries and 1 control box can be installed per cluster battery system and up to 5 cluster battery systems can be connected in parallel. ·...
  • Page 8: Introduction To Rbs

    Serial number Instructions Cluster parallel port (B-COM) Dc output (P+) to inverter BAT (+) RJ45 - Interface (PCS) Dc output (P-) to inverter BAT (-) Air switch RJ45 - Interface (SLAVE) Dc input (B-) to battery (B-) Dc input (B+) to battery (B+) Ground interface Dc switch 2.5 Introduction to RBS...
  • Page 9: Technical Data

    2.6 Technical Data Model Number of battery packs Rated voltage (V) 204.8 307.2 358.4 409.6 Rated energy (kWh) 10.24 12.8 15.36 17.92 20.48 Usable energy (90% DOD) 9.22 11.52 13.82 16.13 18.43 (kWh) Dimensions (WxHxD) (mm) 535*755*425 535*900*425 535*1045*425 535*1190*425 535*1335*425 Weight (kg) Voltage range (V)
  • Page 10: Product Storage And Packaging

    Product storage and packaging 3.1 Product storage environment If the device is not installed and used immediately after being unpacked, ensure that the storage environment meets the following conditions: · If the device is not installed and used within 3 days after being unpacked, use the original packing case.
  • Page 11 RBS: Communications Power cable ×1 Battery pack ×1 cable ×1 (B+to B-) QUALIFIED CERTIFICATE MODEL: CHECKER: DATE: Ground cable ×1 Certificate ×1 Open the package, check whether the product has been deformed or damaged during transportation, and check the number and type of related accessories; Please read and save the product installation instructions carefully;...
  • Page 12: Installation

    Installation 4.1 Installation environment · The battery system must be installed on a flat ground with sufficient load- bearing capacity; If the ground is not flat or does not have enough bearing capacity, it is necessary to ensure by other means (such as making another foundation, adding a bearing board, etc.)! ·...
  • Page 13: Installation Tools

    4.3 Installation tools ·To protect the safety of operators and installers, select and use appropriate tools and measuring instruments that are certified for accuracy. Levelling instrument Drill Hammer Torque wrench Screwdriver RJ45 crimp tool Crimpi plier Multimeter Note: The exact tools to use are subject to the actual situation on site. Batteries have voltage, please wear the appropriate arc flash safety suit (gloves, clothing and face mask) before installation.
  • Page 14: Product Installation

    4.4 Product installation NOTICE! · The product has a certain weight, please handle it carefully when installing, so as to avoid injury and property damage caused by product falling! 1. Remove the battery, control box and base. 2. Attach the leveling foot cup to the bottom bracket. 3.
  • Page 15: Electrical Connections

    4.5 Electrical connections NOTICE! · When installing equipment, the protective ground wire must be installed first; When dismantling equipment, the protective ground wire must be removed last! · Protection ground conductor cross-sectional area: 6m㎡. The cable must meet the outdoor use standard! 4.5.1 Ground connection 1.
  • Page 16 Schematic diagram of ground cable connection: · The end ground cable should be connected to a reliable ground point. 4.5.2 Power cable connection NOTICE! · The power cable between batteries are connected in series, and the negative electrode of the battery is connected to the cathode of the next battery. The power cable between the control box and the battery is connected in parallel, the positive pole of the control box power cable is connected to the positive pole of the battery, and the negative pole is connected to the negative pole...
  • Page 17 1. Unscrew the cover plate and remove the cover plate of the control box and battery. 1.9~2.7N·m · After removing the cover screws, put them in one place to avoid 2. Take out the power Φ16m㎡ cable and communication cable. Battery to battery (B+ to B-) : Battery with control box (B- to B-):...
  • Page 18 4.5.3 Communication cable connection Features CANH CANL Communication cable connection: · Block unused ports. 4.5.4 Inverter connection Inverter connection: BAT+ Communication cable BAT- SLAVE · The inverter shown in the figure is used as an example. The connection ports refer to actual inverters...
  • Page 19 4.5.5 Multiple clusters in parallel...
  • Page 20: System Operation

    System operation 5.1 Check before power on NOTICE! When the battery system is powered on, be sure to check the following to prevent system damage: · The device is firmly installed, the installation position is convenient for operation and maintenance, the installation space is convenient for ventilation and heat dissipation, and the installation environment is clean and tidy! ·...
  • Page 21: Power Off

    Power display (control box) : Indicator status Instructions Green light on SOC: 100% Yellow light on SOC: 30%~60% SOC: <30% Red light on Fault Display (BMS) : light bead Status Power-off state Power on and run without any faults There is a non-forbidden charge or there is Flash 1 a non-forbidden fault Flash 2...
  • Page 22: Maintenance

    Maintenance · If the battery is not in use, it is necessary to fully charge the battery every 3 months and discharge it to 25% to 50% · Check the wall hangers every 6 months for looseness and tighten them if they are. ·...
  • Page 24 M A R S UN I O N LL C Tel: +380 63 41 98 567 Web: https://tadiranair.com.ua Add: building 47, office 33 Kashtanova str., Dnipro 49081, Ukraine...