Tadiran Telecom TAD-LV5.12 EU User Manual

Advertisement

Quick Links

Tadiran TAD-LV5.12 EU
User Manual
Emergency Power Back-up
Flexible Installation
Cost-effective
Scalable
OTA available

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TAD-LV5.12 EU and is the answer not in the manual?

Questions and answers

Summary of Contents for Tadiran Telecom TAD-LV5.12 EU

  • Page 1 Tadiran TAD-LV5.12 EU User Manual Emergency Power Back-up Flexible Installation Cost-effective Scalable OTA available...
  • Page 2 Thank you for choosing the products of MARS UNION LLC. In order to ensure your legal rights and interests and use this product safely and correctly, please read the user manual carefully before installation and use. Version Date Records V1.0 2024.10.30 Initial Release...
  • Page 3: Table Of Contents

    Contents 1. Safety......................3 1.1 Introduction Important Safety Instructions............1.2 Warnings in this Document................1.3 Battery handing guide..................1.4 Response to emergency situations..............1.5 Installers......................1.6 Scrap battery...................... 1.7 Contact information................... 2. Product Introduction..................5 2.1 Technical data....................2.2 Exploded views of battery.................. 2.3 Indicator and ports.....................
  • Page 4: Safety

    1. Safety 1.1 Introduction Important Safety Instructions This manual contains important instructions for: Tadiran TAD-LV5.12 EU battery and this manual must be followed when installing and using this product. The product is designed and tested in accordance with international safety requirements, but as with all electrical and electronic equipment, certain precautions must be observed when installing and or operating the product.
  • Page 5: Response To Emergency Situations

    The battery shall not be connected directly to Safety Extra-Low Voltage. 1.4 Response to emergency situations The Tadiran TAD-LV5.12 EU battery is designed with multiple safety strategies to prevent hazards resulting from failures. However, TADIRAN cannot guarantee their absolute safety for uncertain situations.
  • Page 6: Installers

    1.4.3 Wet battery If the battery is wet or submerged in water, do not try to access it. Contact TADIRAN hot line +380 63 41 98 567 or your distributor for technical assistance. 1.4.4 Damaged battery If the battery damaged, please contact TADIRAN hot line +380 63 41 98 567 or your distributor for help as soon as possible, because damaged battery is dangerous and must be handled with extreme caution.
  • Page 7: System Introduction

    Model Tadiran TAD-LV5.12 EU Total energy (kWh) 5.12kWh Usable energy (kWh) 4.6kWh Max. charge/discharge current 50A/100A Nominal current Dimensions (W*H*D) 609*155*500mm Weight 45.5(±0.5)kg Max. charge voltage Max. recommended DOD Voltage range 44.8-58vd.c Nominal voltage 51.2vd.c Operating condition Indoor Charge 0℃~50℃...
  • Page 8: Exploded Views Of Battery

    2.2 Exploded views of battery Cover Fuse Pack Bracket Air switch Earth Power Terminal Communication Terminal Indicator Figure 1 2.3 Indicator and ports There are 3 types of LED indicators on the front of the battery to show its operating status. BAT+ BAT- Air switch...
  • Page 9: How It Works

    The DC circuit of TADIRAN Tadiran TAD-LV5.12 EU battery has been disconnected before shipment. A precautionary label had been affixed to the shipping carton to alert individuals as to the battery within the package have been disconnected;...
  • Page 10: Installation Prerequisites

    Minimal dust and dirt in the area. No corrosive gases present, including ammonia and acid vapor. The TADIRAN Tadiran TAD-LV5.12 EU battery is rated at IP20, so the battery should be installed indoor. If the ambient temperature is outside the operating range, battery will protect itself by shutting down.
  • Page 11: Installation Process

    DVC class specification: DVC-C for battery terminal, DVC-A2 for all communication terminals. The insulation design for the battery is basic on voltage 450d.c. of OVC II and 230Va.c. of OVC III. Any connection to those greater than the design is not permitted.
  • Page 12: Tools

    Make sure that the cross-sectional area of charging cables is 25m㎡ . NOTICE A breaker between Tadiran TAD-LV5.12 EU battery and inverter was recommended to install, and the breaker’s min. current should be over 150A or following with local regulations.
  • Page 13: Network Cable

    4.7 Network cable Figure 6 If needed, the network cable should be made like that diagram. But the network cable between battery and Inverter should be made following the definition of Inverter. If available, use a LAN cable tester to check whether the cable is faulty. 4.8 Storage If the battery is not to be installed immediately, or removed from operation and needs to be stored for a long period, please choose an appropriate location to store it.
  • Page 14: Battery Installation

    If the battery needs to be stored over 3 months, the DC circuit of battery suggests to be disconnecting. Otherwise, the battery would discharge at a minimum rate and capacity degrades depended on storage time, the battery self-consumption less than 5w.
  • Page 15: Installation The Battery

    WARNING If this checking process is executed for any reason after the battery is fully installed, make sure that the inverter is turned off or break the connection between battery and inverter while checking the battery. Turn on the air switch, after the six LED lights on, measure the voltage at the terminal interface with a voltmeter.
  • Page 16 5.3.2 Ground installation Note: Prohibit long-term suspension! Figure 9 1. Fix the braced feet to battery’s mounting holes one by one. 0.8~1.2N·m Figure 10 2. If more power and energy needed, two or more (≤ 4) batteries could be installed in one stack.
  • Page 17: Cable Connections

    5.4 Cable connections WARNING Before connecting battery with inverter, please make sure that no inverter connected or the inverter turned off. 5.4.1 Cable connection for Parallel connection Communication Note: Up to 4 batteries can be stacked within the nominal voltage value. Up to 4 clusters can be expanded.If you expand to 2 clusters or more, you need to buy a parallel box separately.
  • Page 18: Commissioning

    NOTICE Before two or more batteries installed in parallel, please check the voltage of each battery and make sure the voltage different less than 2.0V. NOTICE The battery default protocol is CAN bus, if an inverter communication mode is RS485 or other protocol, please contact TADIRAN hot line +380 63 41 98 567 before installed the battery.