TCL -GS3K-G1 Quick Installation Manual
TCL -GS3K-G1 Quick Installation Manual

TCL -GS3K-G1 Quick Installation Manual

Advertisement

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TCL-GS3K-G1 and is the answer not in the manual?

Questions and answers

Summary of Contents for TCL TCL-GS3K-G1

  • Page 3: General Information

    Any other application may cause personal injury or damage to property. The product must only be used in countries for which it is approved by TCL and the grid operator. The type label must be permanently attached to the product and must be in a legible condition.
  • Page 4: Important Safety Instructions

    Only touch the insulation of the cables of the PV modules.  Do not touch any parts of the substructure or frame of the PV array.   Do not connect PV strings with ground faults to the product. TCL-GS3-6K-G1_EN_V01.2...
  • Page 5 Beware of high voltage and operating current The inverter operates at high voltage and current. Work on the inverter must only be carried out by skilled and authorized electricians. Beware of hot surfaces The inverter may become hot during operation. Avoid contact during operation. TCL-GS3-6K-G1_EN_V01.2...
  • Page 6: Eu Declaration Of Conformity

    (L 174/88, June 8, 2011) and 2015/863/EU (L 137/10, March 31,2015) (RoHS) TCL PV Tech (Shenzhen) Co., Ltd. confirms here with that the products described in this document are in compliance with the fundamental requirements and other relevant provisions of the above mentioned directives.
  • Page 7 Overview Name DC-switch DC input port COM1&COM2: RS485 communication port COM3:Meter COM4:Communication device port (Ai-Dongle/Wi-Fi Stick) Additional grounding screw AC output port TCL-GS3-6K-G1_EN_V01.2...
  • Page 8: Scope Of Delivery

    Scope of Delivery Name Quantity Inverter Mounting-bracket DC connector AC connector Plug for Meter Communication device (Ai-Dongle / Wi-Fi Stick ) RJ45 Connection waterproof housing Screw accessory Document package TCL-GS3-6K-G1_EN_V01.2...
  • Page 9: Mounting Environment

    Mounting Environment TCL-GS3-6K-G1_EN_V01.2...
  • Page 10 DIMENSIONS Unit: mm Mounting       TCL-GS3-6K-G1_EN_V01.2...
  • Page 11   Second Protective Grounding      10 AC Connection    TCL-GS3-6K-G1_EN_V01.2...
  • Page 12      DC Connection TYPE 1    TCL-GS3-6K-G1_EN_V01.2...
  • Page 13   TYPE 2        TCL-GS3-6K-G1_EN_V01.2...
  • Page 14: Communication Connection

    12 Communication Connection 12.1 COM1&COM2: RS485 communication connection       12.2 COM3: connection Meter       TCL-GS3-6K-G1_EN_V01.2...
  • Page 15 12.3 COM4: Communication device connection Ai-Dongle connection       (optional) Wi-Fi Stick connection    TCL-GS3-6K-G1_EN_V01.2...
  • Page 16    TCL-GS3-6K-G1_EN_V01.2...
  • Page 17 ——Photovoltaic modules number and strings number connected to each MPPT ——Fault code ——Installation location ——Warranty card TCL PV Tech (Shenzhen) Co., Ltd. Web: www.tcl.com/global/en/photovoltaic Add.:Room D301, Building A3, No. 2533, Guanguang Averue, Fenghuang Community, Fenghuang Street, Guangming Districct, Shenzhen, Guangdong.
  • Page 20 TCL-GS3-6K-G1_EN_V01.2...
  • Page 21 (PE) occurs, the inverter will report PE grounding error. Please check and ensure that the inverter is grounded firmly or contact TCL service. 1. Strip the AC cable as shown in the figure , and crimp the copper wire to the appropriate OT terminal (according to DIN 46228-4, provided by the customer).
  • Page 22 1. Switch on AC circuit breaker between the inverter and the grid. 2. Switch on DC switch. 3. Please refer to the AiProfessional/TCL App manual for commissioning of the inverter via Wifi. 4. When there is sufficient DC power and the grid conditions are met, the inverter will start to operate automatically.

This manual is also suitable for:

Tcl-gs3.6k-g1Tcl-gs4k-g1Tcl-gs5k-g1Tcl-gs6k-g1

Table of Contents