Quick Installation Guide
SmartLink MX
CAUTION: Risk of electric shock
Use proper tools and personal protection
Don't crush, heat, incinerate, short-circuit, dismantle or immerse in any liquid.
It may vent, rupture and burn.
Make sure the SmartLink MX is placed in a dry area, without moisture IP22.
Use this SmartLink MX only in combination with an MG Master LV or MG Master HV.
BMS
Always respect charge instructions.
Read and fully understand the manual before installation and use.
This product may only be installed by a qualified electrical engineer.
This product is tested according to and complies with the IEC 62619, IEC 62620 and UN38.3 standards
Placement
Mount vertically (recommended) or horizontally:
✓
Mounting holes:
1
/5
Connect to CAN-Bus:
2
/5
MG Master & Chargers
Thank you for ordering this MG product
What's in the box:
- MG SmartLink MX
- 2x io-connector
- 2x terminator
- Quick Installation Guide
Download Center
https://downloads.mgenergysystems.eu/smartlinkmx/
CAN-A:
Scan the QR-code for:
- Manual
- Installation video
- Technical drawings
WARNING
NOTICE
✓
✘
CAN-B:
Energy Monitor & Diagnostic Tool
Required tools (insulated):
- Screwdriver
✘
✓
Technical Specifications
Need help?
Do you have a question about the SmartLink MX and is the answer not in the manual?
Questions and answers