Ensure that all relevant personnel read the points listed within this leaflet and that a copy is given to staff involved with the installation and maintenance of this product. Glasdon recommends that a full Health and Safety analysis is carried out prior to installation. KIT CONTENTS...
Page 2
ESTABLISHING THE CONFIGURATION OF THE SOCKETS Chevro ex Ultra with High Visibility Surround 400MM CHEVROFLEX WITH HIGH VISIBILITY SURROUND The type and quantities of sockets will vary dependant on the model purchased. See diagrams to the right to see the order the sockets must be attached together.
SOCKET INSTALLATION WIDTH: 350mm. LENGTH: Overall length of sockets plus 200mm. Measure the size of the hole to be excavated. Position the socket into the hole. Check for buried services then dig the hole to a depth of 450mm. Line the hole with 50mm of gravel for drainage and ensure base of hole is at.
Page 4
UPRIGHT INSTALLATION (Continued) Fix the socket covers to the socket using the M10 Position the screw covers over the tightened screws screws and washers provided. Tighten using the 6mm and secure into place using a rubber hammer. allen key provided or use a hand drill if available. UPPER CLIP INSTALLATION Each Upper Clip is located between two Uprights.
Page 5
REPLACING DAMAGED UPRIGHTS REMOVING THE DAMAGED UPRIGHTS Remove the Screw Covers from behind the damaged Remove the screws from the Upper Clips on the uprights. To do this use a at head screw driver or damaged Uprights using a 5mm allen key. Remove similar to prise the covers o .
Page 6
THAT A COPY IS GIVEN TO STAFF INVOLVED WITH THE INSTALLATION AND MAINTENANCE OF THIS PRODUCT. SAFETY NOTE: PLEASE REFER TO ‘THE MANUAL HANDLING OPERATIONS REGULATIONS 1992’ DURING HANDLING. AND CHEVROFLEX ULTRA ARE TRADEMARKS OR REGISTERED TRADEMARKS OF GLASDON GROUP OR ITS SUBSIDIARIES IN THE U.K AND OTHER COUNTRIES •...