Download Print this page

Glasdon Signmaster Ultra Installation And Maintenance Instructions

Advertisement

Quick Links

Signmaster Ultra
INSTALLATION AND MAINTENANCE INSTRUCTIONS
IMPORTANT NOTE: ENSURE THAT ALL RELEVANT PERSONNEL READ THESE INSTRUCTIONS PRIOR TO USE
Please also refer to the 'Manual Handling Operations Regulations 1992' during the handling of the
product and materials used for installation. Glasdon recommends that a full Health and Safety
analysis and site survey is carried out prior to installation.
BOLT DOWN FIXING INSTRUCTIONS
KIT CONTENTS:
ITEM 1 - Bollard
ITEM 2 - Anchor Rawl Plug
ITEM 3 - Washer - M10 x 30mm
ITEM 4 - Spacer - M10 x 28mm
ITEM 5 - Washer - M10 x 50mm
ITEM 6 - Cover Cap Washer Plate
ITEM 7 - Screw - M10 x 100mm
ITEM 8 - Cover Cap - Black or White
Position the Bollard (Item 1) centrally on the intended site and
orientate it correctly with regard to the site requirements (i.e.
Retroreflective Sign Faces and Fluorescent Yellow Panels).
Using the Bollard, mark out the 4 x hole positions, ensuring they are
a minimum of 100mm from the edge of the concrete foundation.
Drill the 4 x Ø16mm holes no less than 80mm deep ensuring they
match the hole centres of the Bollard base.
Insert an Anchor Rawl Plug (Item 2) into each of the 4 x drilled holes,
then using a hammer (if required), tap flush with the ground level.
Bollard Installation:
Place Washer (Item 3) on top of the Anchor and align the centres.
Spray a suitable Lubricant/Grease (e.g. WD40) generously into the
threads of the 4 x Anchors (to aid assembly and future removal).
Orientate the Bollard correctly aligning all 4 x holes to the Anchors.
Insert Spacer (Item 4) into each of the 4 x fixing holes in the Bollard
base.
Orientate correctly and place Cover-Cap Washer Plate (Item 6),
followed by Washer (Item 5) onto each of the 4 x Screws (Item 7),
then secure the Bollard to the Anchors using a 6mm Allen Key.
To complete, snap-fit a Cover-Cap (Item 8) over each of the 4 x
Screws.
TOOLS/EQUIPMENT REQUIRED:
- 6mm Allen Key (Supplied within kit)
- Ø16mm Masonry Drill Bit
x 1
- Appropriate Power Drill
x 4
- Hammer
x 4
- Appropriate Lubricant / Grease Spray
x 4
x 4
x 4
x 4
x 4
1
8
7
6
5
4
3
(min. distance from any
edge of the concrete)
1 of 4
ALL DIMENSIONS IN MM
100
concrete
DIAGRAM NOT TO SCALE
2

Advertisement

loading
Need help?

Need help?

Do you have a question about the Signmaster Ultra and is the answer not in the manual?

Questions and answers

Summary of Contents for Glasdon Signmaster Ultra

  • Page 1 IMPORTANT NOTE: ENSURE THAT ALL RELEVANT PERSONNEL READ THESE INSTRUCTIONS PRIOR TO USE Please also refer to the ‘Manual Handling Operations Regulations 1992’ during the handling of the product and materials used for installation. Glasdon recommends that a full Health and Safety analysis and site survey is carried out prior to installation.
  • Page 2 CONCRETE-IN FIXING INSTRUCTIONS TOOLS/EQUIPMENT REQUIRED: KIT CONTENTS: - 6mm Allen Key (Supplied within kit) - Equipment to Excavate Hole ITEM 1 - Bollard (Body and Base) - Concrete-Mix (Fast Setting) ITEM 2A - Adjustable Depth Concrete-in Fixing - Spirit Level ITEM 2B - Fixed Depth Concrete-in Fixing - Appropriate Lubricant / Grease Spray ITEM 3 - Washer - M10 x 30mm...
  • Page 3 BOLLARD BODY REPLACEMENT TOOLS/EQUIPMENT REQUIRED: KIT CONTENTS: - 17mm Spanner or Socket Set - Appropriate Lubricant / Grease Spray ITEM 1 - Bollard (Body) - Pliers or flat headed Screwdriver ITEM 2 - Spacer - M10 x 70mm ITEM 3 - Washer - M10 x 30mm ITEM 4 - Bolt Hex Head - M10 x 90mm ITEM 5 - Nut Nyloc M10 ITEM 6 - Cover Cap - Black or White...
  • Page 4 Use only on the areas of the Impactapol or Durapol affected and do not use on retroreflective panels or sign face. Felt tip pen or paint may be removed from Impactapol and Durapol using a proprietary graffiti remover such as Glasdon Graffitix graffiti wipes.