Page 4
6.5.10. AC-Anschluss der FENECON Cluster-EMS-Box ........
Page 5
13.4. Repairs ................. . 14. Information for fire departments when handling FENECON home and commercial battery energy storage systems 15.
Maximum Power Point Tracking — Finder for the maximum power point MPPT Grid connection point Circuit protective conductor Photovoltaic Round-Trip-Efficiency (RTE) System efficiency; ratio of discharged to charged energy quantity Smart-Grid-Ready — Preparation of the Heat pump for external control SG-Ready 6 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
The operator must keep these installation and service instructions or relevant parts of them within easy reach in the immediate vicinity of the product. If the product is handed over to another person, the operator shall pass these instructions on to that person. FENECON Commercial 92 Cluster — Assembly and Operating Instructions 7 / 102 Version:2025.1.1...
The {ems-name-3} is an electrical energy storage system consisting of various modules. These include in particular a BMS (battery management system), the FENECON Energiemanagementsystem (FEMS), battery modules and bases. All processes of the electricity storage system are monitored and controlled by FEMS.
2.4.2. Service staff Service personnel include the manufacturer’s personnel or specialist personnel instructed and authorized by FENECON GmbH, who must be requested by the operator to work on the system (e.g. assembly, repair, maintenance, work on the batteries, etc.). 2.5. General information on the FENECON Commercial 92 electrical energy storage system •...
• Do not expose the battery modules to high voltages. • Place the battery modules on level surfaces. • Do not place any objects on the FENECON Commercial 92 battery towers. • Do not step on the power storage system.
• Keep heat and fire sources, flammable, explosive and chemical materials away from the power storage system. • Do not dispose of the FENECON Commercial 92 battery modules in a fire due to the risk of explosion. FENECON Commercial 92 Cluster — Assembly and Operating Instructions 11 / 102 Version:2025.1.1...
◦ After skin contact: Immediately wash skin thoroughly with neutralizing soap and consult a doctor if skin irritation persists. ◦ After eye contact: Immediately flush eye(s) with running water for 15 minutes and seek medical advice. Delayed treatment can cause serious damage to health. 12 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
Proceed as follows in emergency situations: 1. Das Stromspeichersystem vom Netz trennen 2. Remove from the danger zone 3. Secure the danger zone 4. The responsible persons inform 5. Alert a doctor if necessary FENECON Commercial 92 Cluster — Assembly and Operating Instructions 13 / 102 Version:2025.1.1...
Zündquelle und Rauchen verboten Anlass für ein Risiko durch offene Flammen, Feuer, offene Zündquellen und Rauchen sein können. Schutzerdungskennzeichen Getrennte Sammlung von Elektro- und Elektronikgeräten Anleitung beachten Kopfschutz benutzen Fußschutz benutzen 14 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
Page 16
2.9. Pictograms Piktogramm Bedeutung Beschreibung Handschutz benutzen CE-Kennzeichen Produkt ist recyclingfähig. Tabelle 6. Pictograms FENECON Commercial 92 Cluster — Assembly and Operating Instructions 15 / 102 Version:2025.1.1...
• Switch cabinets (e. g. inverter housing) must always be kept locked. Only authorized personnel with appropriate training and safety instructions (e. g. service personnel) should be allowed access. 16 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
Page 18
• Manche Betriebsmittel (z. B. Wechselrichter) mit elektrischem Zwischenkreis können nach Freischaltung für eine gewisse Zeit noch gefährliche Restspannungen bevorraten. Vor Arbeitsbeginn an diesen Anlagen ist die Spannungsfreiheit zu prüfen. FENECON Commercial 92 Cluster — Assembly and Operating Instructions 17 / 102 Version:2025.1.1...
Access to the programming levels is not barrier-free and is accessible at different levels depending on the qualifications of the operating personnel. Safety-relevant program changes require additional verification. FENECON processes energy data of European customers exclusively on servers in Germany and these are subject to the data protection regulations applicable in this country.
Width | Depth | Height 699 | 450 | 719 mm General Weight 80 kg Tabelle 8. Technical data — Inverter 3.2.1. Dimensions The dimensions are given in mm. Abbildung 1. Inverter — Dimensions 20 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
• Tiefentladung der Zellen. • Defekt des Batteriemoduls. → Externe Beladung der Batteriemodule auf Nennspannung. Dies darf nur durch den Hersteller, oder durch ein vom Hersteller beauftragtes Unternehmen durchgeführt werden. FENECON Commercial 92 Cluster — Assembly and Operating Instructions 31 / 102 Version:2025.1.1...
506 | 365 | 84 mm Weight 6 kg Protection specification IP55 (plugged in) Installation stackable Tabelle 19. Technical data — Base 3.9.1. Dimensions — Base The dimensions are given in mm. Abbildung 10. Dimensions — Base 32 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
4. Allgemeine Beschreibung 4. Allgemeine Beschreibung FENECON Commercial 92 Cluster ist ein AC-gekoppeltes Speichersystem, der ein eigenes Stromnetz für die Verbraucher aufbauen kann. In diesem modularen System zur Speicherung elektrischer Energie werden Lithium- Eisenphosphat-Batterien (LiFePO4) verwendet. 4.1. System configuration — General overview Abbildung 11.
Zusätzlich ist eine Cluster-EMS-Box für das Gesamtsystem notwendig. Number of battery Number of battery BMS box Slave-EMS- Parallelschaltbox Extension-Box towers modules max. (je Turm) Tabelle 21. System configuration — Required components FENECON Commercial 92 Cluster — Assembly and Operating Instructions 35 / 102 Version:2025.1.1...
Page 37
4.1. System configuration — General overview Abbildung 13. Structure of the FENECON Commercial 92 electrical energy storage system with five battery towers 36 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
Cluster-EMS-Box verbunden und AC-seitig bauseits an der Verteilung des Kunden angeschlossen. The following components must be installed: • Inverter • Battery tower with base, battery modules, BMS box, and FENECON Commercial 92 EMS box ◦ Batterieturm mit Sockel, Batteriemodulen, BMS-Box und Extension-Box • Parallelschaltbox •...
Page 46
(hier werden Kabelkanäle nicht mitgemessen). • Vor der Vorderseite der Parallelschaltbox mindestens einen Abstand von 500 mm einhalten. Zur Installation der Parallelschaltbox an der Wand wie folgt vorgehen: FENECON Commercial 92 Cluster — Assembly and Operating Instructions 45 / 102 Version:2025.1.1...
Page 47
3. Die Parallelschaltbox mit Hilfe des Bügels an der Rückseite an die Wandhalterung hängen. 4. Anschließend an der linken Seite mit Hilfe der beiliegenden Schrauben sichern. 46 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
• Seitlich, oberhalb und unterhalb der Cluster-EMS-Box muss ein Abstand von mindestens 300 mm eingehalten werden (hier werden Kabelkanäle nicht mitgemessen). • Vor der Vorderseite der Cluster-EMS-Box mindestens einen Abstand von 500 mm einhalten. FENECON Commercial 92 Cluster — Assembly and Operating Instructions 47 / 102 Version:2025.1.1...
Schrauben sichern. 6.3.2. Aufstellbedingungen und Abstände — Batterietürme Indoor or outdoor installation We recommend installing the FENECON Commercial 92 — battery towers in a well-ventilated room without external heat sources. However, the battery towers can also be installed outdoors protected from the weather (e. g. garage).
Page 50
• Wet rooms. • places where salty moisture, ammonia, corrosive vapors or acid can ingress into the system. The storage system should also be inaccessible to children and animals. FENECON Commercial 92 Cluster — Assembly and Operating Instructions 49 / 102 Version:2025.1.1...
Page 51
• Battery towers must be installed protected from direct sunlight, rain and snow. • In conditions outside the optimum temperature range, the performance of the batteries is reduced. (optimum temperature range: +15 °C to +30 °C) Abbildung 17. Abstände am Aufstellort — Batterietürme 50 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
(battery modules) pass from the outdoor area into a building. • Die Ethernet-Schnittstelle des Wechselrichters ist als "TNV-1" klassifiziert und bietet einen Schutz gegen Überspannungen bis 1,5 kV. FENECON Commercial 92 Cluster — Assembly and Operating Instructions 51 / 102 Version:2025.1.1...
Page 53
Arcing due to short-circuit currents Death or serious injury to the body and limbs due to burns, heat development and electric arcs due to short-circuit currents in the battery modules. 52 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
Page 54
Electrostatic charging Touching electronic components can damage or destroy a battery tower due to electrostatic discharge. • Ground yourself before touching a component. Cleaning agents FENECON Commercial 92 Cluster — Assembly and Operating Instructions 53 / 102 Version:2025.1.1...
Page 55
The use of cleaning agents can damage the inverter and/or its parts. • Only clean the battery towers and all parts of the inverter with a cloth moistened with clean water. 54 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
Page 56
2. Der Abstand zu Wand muss 40 bis 65 mm betragen damit die Wandhalterung korrekt angebracht werden kann. 3. Den Sockel auf den Füßen am Installationsort aufstellen (den Abstand von 40 bis 65 mm zu einer Wand einhalten). FENECON Commercial 92 Cluster — Assembly and Operating Instructions 55 / 102 Version:2025.1.1...
Page 57
Death or serious injury to the body and limbs due to electric shock. • Ensure that the circuit breaker of the BMS box is switched off before installing the BMS box. 56 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
6.4. Montage — Batterieturm 7. Die FENECON Commercial 92-BMS-Box auf die letzte Batterie aufsetzen. 6.4.2. Montage — Slave-EMS-Box und Extension-Box 1. Slave-EMS-Box beim 1. Batterieturm aufstecken. 2. Bei allen weiteren Batterietürmen die FENECON Commercial 92- Extension-Box aufstecken. 3. Das T-Stück und den Winkel mit der beiliegenden M6-Schraube montieren.
Page 59
Schrauben anschrauben. 7. Für die Befestigung der Batterietürme wird folgende Anordnung der Halter empfohlen. 8. Die Seitenblenden des Sockels, der Batteriemodule, der BMS-Box und der Slave-EMS-Box einsetzen. 58 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
Page 60
6.4. Montage — Batterieturm Abbildung 18. Arrangement of the module fastening FENECON Commercial 92 Cluster — Assembly and Operating Instructions 59 / 102 Version:2025.1.1...
The cross-section of the earthing must be at least 10 mm . + → The inverter and the battery towers must be earthed individually to the equipotential bonding. 60 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
Absicherung der Verbraucher mit RCD Typ A und passenden LS-Schaltern KACO Wechselrichter 92 kW Batterietürme Absicherung maximal C6 oder C10 1-polig Verbraucher Stromnetz/Netzanschluss Potentialausgleichsschiene Tabelle 29. Components for AC connection (not included in the scope of delivery) FENECON Commercial 92 Cluster — Assembly and Operating Instructions 61 / 102 Version:2025.1.1...
Page 63
Einzuhalten sind die aktuell gültigen nationalen Bestimmungen, die Vorgaben des zugehörigen Netzbetreibers sowie die Vorgaben des Herstellers. The manufacturer’s manual supplied with the inverter must be used for the AC connection of the inverter. 62 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
1 or 5. You can read the transformer ratio on the current transformers installed on site (see e. g. type plate). To install the meter, use the installation and configuration instructions — FEMS package 3-phase FENECON Commercial 92 Cluster — Assembly and Operating Instructions 63 / 102 Version:2025.1.1...
Page 65
Abbildung 21. Anschluss — RS-485 1. COM RS-485 connection from the FEMS direction 2. Daten-Leiter Plus (+) (A-Leiter) 3. Daten-Leiter Minus (-) (B-Leiter) 4. Minus (-) contact 5. Plus (+) Contact 64 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
Page 66
3. Das andere Ende mit zwei offenen Pins muss am Harting-Stecker (16- polig — A) an Klemme 3/4 anschlossen werden. a. Die weiße Ader auf Klemme 3 anklemmen. b. Die braune Ader auf Klemme 4 anklemmen. FENECON Commercial 92 Cluster — Assembly and Operating Instructions 65 / 102 Version:2025.1.1...
Page 67
9. Die restlichen Durchführungen der Mehrfachdichtung mit den beiliegenden Blindstopfen verschließen Verschraubung zudrehen. 10. Den Stecker an der Cluster-EMS-Box anstecken. 11. Lock the plug at the top and bottom through the holders. 66 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
2. Es ist darauf zu achten, dass der Netzwerkstecker vorne ca. 3 mm über den Bajonettverschluss ragt. Beispielhaft kann die Endbrücke der Batterie als Referenz für die Position des Netzwerksteckers dienen. FENECON Commercial 92 Cluster — Assembly and Operating Instructions 67 / 102 Version:2025.1.1...
Page 69
3. Das Netzwerkkabel an den INVERTER-Port der Slave- EMS-Box anstecken. 4. Das andere Ende des Netzwerkkabels durch die Verschraubung des Wechselrichters führen und am Netzwerkport (4 — Ethernet für Netzwerkanschluss DHCP) anschließen. Für nähere Informationen Handbuch Wechselrichters nachschlagen. 68 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
3. Likewise on all other towers, always between PARALLEL OUT and PARALLEL IN (blue/orange/yellow). 4. At the last battery tower, the jumper plug must be plugged into PARALLEL OUT (red). FENECON Commercial 92 Cluster — Assembly and Operating Instructions 69 / 102 Version:2025.1.1...
Batterie und das andere Ende des Kabels an der Cluster-EMS-Box an den Slave-Ports anschließen. Hierbei die Nummerierung der Ports von 1-5 beachten. Das Speichersystem hat keine W-LAN-Funktion. 70 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
Das Speichersystem hat keine W-LAN-Funktion. 6.5.9. AC-Anschluss der FENECON Slave-EMS-Box • An external 230-V-power-supply is required to supply the FENECON EMS box. • Dies hat den Zweck, die leere Batterie nicht durch zusätzliche Verbraucher zu belasten. Das kann insbesondere im Winter, wenn keine Sonne scheint, oder wenn Schnee auf der PV-Anlage liegt, vorkommen.
1. Durchführen des Kabels durch das kleinere Loch der Mehrfachdichtung. Es wird ein Querschnitt von 3 x 1,5 mm empfohlen. 2. Darauf achten, dass das Gehäuse mit der 3-Loch- Dichtung verwendet wird. Das andere Gehäuse wird später benötigt. 72 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
Page 74
Blindstopfen (10 mm) verschließen und die Verschraubung zudrehen. 7. Den Stecker an der Cluster-EMS-Box anstecken. 8. Lock the plug at the top and bottom through the holders. FENECON Commercial 92 Cluster — Assembly and Operating Instructions 73 / 102 Version:2025.1.1...
• Before commissioning the system, ensure that the battery modules are not deeply discharged. • If the battery modules are deeply discharged, contact the FENECON Service. • Only charge deeply discharged battery modules as instructed by the FENECON Service. This is indicated in the installation and service instructions: ...
This may take approx. 30 seconds. 7.2. Configuration via commissioning wizard Öffnen Sie die Homepage der FENECON und klicken Sie oben rechts auf den Login zum FEMS Online-Monitoring "FEMS-Login". Alternativ werden Sie über den nachfolgenden QR-Code oder den Link auf die Seite geleitet.
Page 77
5. Wenn alle notwendigen Punkte bestätigt wurden, wird der Account automatisch angelegt. 6. Sie werden direkt Konfiguration Speichersystems weitergeleitet. 7. Unten auf das blaue Plus klicken. 8. FEMS hinzufügen. 76 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
Page 78
• You will receive a protocol of the complete commissioning for your records by e-mail. • The customer also receives an e-mail with the personal access data for end customer monitoring. FENECON Commercial 92 Cluster — Assembly and Operating Instructions 77 / 102 Version:2025.1.1...
The terms and conditions still need to be confirmed here, then the monitoring is available without restrictions. 8.1.2. Access for the installer Der Installateurs-Zugang kann wie im Abschnitt [Konfiguration per Inbetriebnahme-Assistent] beschrieben auf der FENECON-Homepage erstellt werden. Der Zugang ist für die erfolgreiche Inbetriebnahme erforderlich. 78 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
Beladung/Entladung gestoppt und der Ladestand gehalten. 3. Abschalten des kompletten Systems. Die genaue Vorgehensweise wird Abschnitt [Ausschalten] genau beschrieben. → Sicherungsschalter der Batterie auf OFF. + → AC-Sicherung des Wechselrichters auf OFF. FENECON Commercial 92 Cluster — Assembly and Operating Instructions 79 / 102 Version:2025.1.1...
Page 81
• The battery towers work independently, so the flashing frequency of the different towers may vary. The SoC display of the individual towers may also differ briefly. 80 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
Nach der Installation der Komponenten muss die App noch installiert werden. Hierfür wie im Abschnitt [Aktivierung der App im FEMS App Center] vorgehen. FENECON Commercial 92 Cluster — Assembly and Operating Instructions 83 / 102 Version:2025.1.1...
Hierfür wie im Abschnitt [Aktivierung der App im FEMS App Center] vorgehen. Manual mode is only suitable for temporary operation. For permanent operation, the external relay control must be used. 84 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
Nach der Installation der Komponenten muss die App noch installiert werden. Hierfür wie im Abschnitt [Aktivierung der App im FEMS App Center] vorgehen. FENECON Commercial 92 Cluster — Assembly and Operating Instructions 85 / 102 Version:2025.1.1...
2. For detailed information on connecting a CHP unit, please refer to the manufacturer’s installation instructions. Nach der Installation der Komponenten muss die App noch installiert werden. Hierfür wie im Abschnitt [Aktivierung der App im FEMS App Center] vorgehen. 86 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
2. Melden Sie sich mit Ihrem Installateurs-Zugang an. 3. Oben links auf die drei Striche klicken. 4. "Einstellungen" auswählen 5. "FEMS App Center" klicken. 6. Durch Klick auf "Lizenzschlüssel einlösen" öffnet sich ein neues Fenster. FENECON Commercial 92 Cluster — Assembly and Operating Instructions 87 / 102 Version:2025.1.1...
Page 89
Auswahl angezeigt, die mit dem eingelösten Lizenzschlüssel installiert werden können. 9. Auswählen der zu installierenden App. 10. Anschließend wird man zum Installationsassistenten der jeweiligen App weitergeleitet. 11. Make settings. 12. Then click on "Install app". 88 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
OK, an orange exclamation mark indicates a warning (Warning) and a red exclamation mark indicates an error (Fault). 12.1.1. Fault display System status: Everything is OK System state: Warning System state: Error (Fault) 90 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
Under certain circumstances it can happen that the FEMS is not accessible and the adjacent error message appears. Wenn das FEMS offline ist, folgen Sie den Schritten, die unter der Meldung angezeigt werden. FENECON Commercial 92 Cluster — Assembly and Operating Instructions 91 / 102 Version:2025.1.1...
12.2. Battery tower 12.2. Battery tower 12.2.1. Fault display Errors are displayed on the FENECON Home 10 BMS box via a red LED. The various errors are indicated by LED codes. 92 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions...
Page 94
Kontaktfehler Isolationsfehler BMS-Fehler Blue permanently on blinking blue Blue flashing quickly Red permanently on FENECON Commercial 92 Cluster — Assembly and Operating Instructions 93 / 102 Version:2025.1.1...
If you suspect that the battery module is damaged, stop operation and contact FENECON service Tabelle 33. Troubleshooting 12.4. Service Bei Störungen der Anlage ist der FENECON-Service zu kontaktieren: Phone: +49 (0) 9903 6280-0 E-mail: service@fenecon.de Unsere Servicezeiten: Mo.-Do. 08:00 bis 12:00 Uhr | 13:00 bis 17:00 Uhr Fr.
(SoC = 0 %) und anschließend wieder vollständig beladen werden muss (SoC = 100 %), da es sonst ggf. zu Kapazitätsverlusten kommen kann. 13.4. Repairs The FENECON service must be contacted in the event of defective components. FENECON Commercial 92 Cluster — Assembly and Operating Instructions 95 / 102...
The FENECON home and commercial systems operate in the low-voltage range, which means that they are operated with voltages of less than 1,500 volts direct current (DC) and less than 1,000 volts alternating current (AC).
15.1. Information for the operator The following information must be provided to the operator: Komponente Information/Dokument Bemerkung Anlage FEMS-Nummer Anlage Login-Daten für Online-Monitoring Anlage Bedienungsanleitung Tabelle 34. Information for the operator FENECON Commercial 92 Cluster — Assembly and Operating Instructions 97 / 102 Version:2025.1.1...
• Observe the current laws, regulations and standards when transporting the batteries, e. g: Dangerous Goods Transportation Act (GGBefG). Legal regulations The product is transported in accordance with the legal regulations of the country in which the product is transported off-site. 98 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
• The dismantling instructions of the component manufacturers (see appendix, Other applicable documents) must be observed. • The current laws, regulations and standards must be observed when transporting the battery modules (e.g. Dangerous Goods Transportation Act - GGBefG). FENECON Commercial 92 Cluster — Assembly and Operating Instructions 99 / 102 Version:2025.1.1...
17.3. Waste disposal 17.3. Waste disposal • The FENECON storage system must not be disposed of with normal household waste. • The FENECON Home 20 & 30 is RoHS- and REACH-compliant. • Disposal of the product must comply with local regulations for disposal.
System — Schematic diagram with optional components (shown without protective device) Abbildung 12. System structure as AC system (shown without protective device) Abbildung 13. Structure of the FENECON Commercial 92 electrical energy storage system with five battery towers Abbildung 14. Montagebedingungen — Parallelschaltbox Abbildung 15.
Components for AC connection (not included in the scope of delivery) Tabelle 30. Components for AC connection Tabelle 31. Stecker — Pinbelegung — Leistungsstecker Tabelle 32. Stecker — Pinbelegung — Steuerstecker Tabelle 33. Troubleshooting Tabelle 34. Information for the operator 102 / 102 FENECON Commercial 92 Cluster — Assembly and Operating Instructions Version:2025.1.1...
Need help?
Do you have a question about the Commercial 92 Cluster and is the answer not in the manual?
Questions and answers